Elevator cooperative
888 PARK AVENUE
MANHATTAN · BIN 1041874
💬 Discuss this project
1927Year Built
15Stories
D4Building Class
R10Zoning
183,101 sfGross Floor Area
50Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 888 PARK AVENUE INC · 16,040 sf lot · 11.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Roof7p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 3 docs
Penthouse7p · 2 filings · 20 docs
Floor 1516p · 3 filings · 20 docs
Floor 149p · 5 filings · 20 docs
Floor 13
Floor 12
Floor 111p · 1 filing · 5 docs
Floor 10
Floor 96p · 4 filings · 20 docs
Floor 8
Floor 7
Floor 61p · 1 filing · 20 docs
Floor 5
Floor 42p · 2 filings · 20 docs
Floor 39p · 1 filing · 20 docs
Floor 2
Floor 1
Cellar2p · 1 filing · 12 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY2507/08/2026
INTERSYSTEM INSTALLATION CORP1007/08/2026
888 PARK AVENUE14403/22/2026
INSIGNIA RESIDENTIAL GROUP1303/22/2026
THINK CONSTRUCTION103/22/2026
DOUGLAS ELLIMAN PROPERTY MANAGEM203/21/2026
888 PARK AVE INC C O INSIGNIA503/21/2026
NEW CENTURY CONSTRUCTION103/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor1607/08/2026
S. DONADIC INCGeneral Contractor1307/08/2026
NORDIC CUSTOM BUILDERS INCGeneral Contractor907/08/2026
INTERSYSTEM INSTALLATIONGeneral Contractor807/08/2026
PHOENIX SUTTON STR INCGeneral Contractor607/08/2026
JGR GROUP INCGeneral Contractor507/08/2026
MASPETH CONTRACTING CORPGeneral Contractor507/08/2026
CAPITAL BUILDERS NYC INCGeneral Contractor507/08/2026
DONATO PLUMBING, INCPlumbing507/08/2026
DUN-RITE SPECIALIZED CARRGeneral Contractor407/08/2026
LTB MECHANICAL CORPGeneral Contractor403/21/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor303/21/2026
RICHARD GRIMAElectrical303/21/2026
LMA GROUP INCGeneral Contractor307/08/2026
HITE CONSTRUCTION INCGeneral Contractor307/08/2026
STEPHEN FOY MECH SVC CORPPlumbing207/08/2026
POWER SURGE ELECTRIC, INCElectrical203/22/2026
ALKLEM PLUMBING INCPlumbing207/08/2026
DELTA-SIGMA MECH CORPPlumbing207/08/2026
NICHOLAS, GILBERTElectrical103/21/2026
MAYO, EUGENEElectrical103/21/2026
JOHN CORBETTElectrical103/21/2026
JAROSLAW JAROCKIElectrical103/21/2026
JAMES SHARKEYElectrical103/21/2026
METAMORPHOSIS CONSTR CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIER, FINE ASSOCIATES1069407/06/2026
CHRISTIAN L. MARTOS ENGIN5965809/22/2025
JACK GREEN ASSOCIATES422709/15/2025
H. A. BADER CONSULTANTS2332210/25/2024
VALERIO ASSOCIATES, P.C.1379210/23/2024
ALLEN+KILLCOYNE ARCHITECT2697106/07/2024
PSI AGENCY INC.254106/07/2024
CHARLES G MICHEL ENGINEER2871103/25/2024
ALAN MARGOLIN & ASSOC423103/21/2024
LOMBARDO PROF ENGINEERING8566109/01/2023
Building Lifecycle
All (300)Filed (58)Permit Issued (69)Signed Off (27)Facade (FISP) (12)Violation (20)Inspection (20)Objection (64)Special Inspection (30)
07/27/2026
Special inspection requirement — Final
Jeffrey Fine
07/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Fine
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Fine
07/06/2026
Filed — Alteration
REPLACEMENT OF LOT LINE WINDOWS AND NTERIOR RENOVATION OF BATHROOM IN APT 6A . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01249923-P2
07/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Fine
07/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Fine
07/03/2026
Special inspection requirement — Final
Jeffrey Fine
11/20/2025
Signed off — Alteration
Plumbing work as shown on plans filed herewith.Alt1 filed to combine apartment 14A (duplex)with PH A and PH B
M00230507-I1
11/14/2025
Filed — Alteration
REPLACEMENT OF LOT LINE WINDOWS AND NTERIOR RENOVATION OF BATHROOM IN APT 6A . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01249923-P1
10/15/2025
Special inspection requirement — Final
Jeffrey Fine
10/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Fine
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Fine
10/14/2025
Permit issued — General Construction
M01249923-I1-GC
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
10/08/2025
Signed off — Alteration
Filing for Mechanical work related to renovation work in residential building as per plan filed herewith. No change in use, occupancy, and egress
M00192218-I1
10/07/2025
Special inspection requirement — Final
Robert Divilio
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
10/07/2025
Special inspection requirement — Post-installed Anchors
Christian Martos
10/07/2025
Special inspection requirement — Mechanical Systems
JACK GREEN
09/30/2025
Signed off — Alteration
PLUMBING WORK IN APT 3C FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01020130-S2
09/30/2025
Signed off — Alteration
PLUMBING WORK IN APT 3C FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01020130-S1
09/23/2025
Signed off — Alteration
PLUMBING WORK IN APT 3C FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01020130-I1
09/22/2025
Filed — Alteration
Filing for Mechanical work related to renovation work in residential building as per plan filed herewith. No change in use, occupancy, and egress
M00192218-P3
09/15/2025
Filed — Alteration
Plumbing work as shown on plans filed herewith.Alt1 filed to combine apartment 14A (duplex)with PH A and PH B
M00230507-P5
09/03/2025
Signed off — Alteration
Filing for Structural work related to renovation work in residential building as per plan filed herewith. No change in use, occupancy, and egress
M00192240-I1
08/21/2025
Signed off — Alteration
Mechanical work file in conjunction with apartment #5B renovation
M01124663-S1
08/15/2025
Signed off — Alteration
One new masonry opening
M01124745-I1
08/15/2025
Signed off — Alteration
Mechanical work file in conjunction with apartment #5B renovation
M01124663-I1
08/12/2025
Signed off — Alteration
Mechanical work file in conjunction with apartment #5B renovation
M01124663-S2
08/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/07/2025
Filed — Alteration
REPLACEMENT OF LOT LINE WINDOWS AND NTERIOR RENOVATION OF BATHROOM IN APT 6A . NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01249923-I1
08/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2025
Permit issued — Mechanical Systems
M00192218-I1-MS
07/30/2025
Permit issued — Structural
M00192240-I1-ST
07/23/2025
Special inspection requirement — Final
Robert Divilio
07/23/2025
Special inspection requirement — Mechanical Systems
JACK GREEN
07/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
07/23/2025
Special inspection requirement — Post-installed Anchors
Christian Martos
07/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2025
Filed — Alteration
Plumbing work as shown on plans filed herewith.Alt1 filed to combine apartment 14A (duplex)with PH A and PH B
M00230507-P4
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/30/2025
Permit issued — Plumbing
M01020130-S1-PL
04/17/2025
Signed off — Alteration
EXTERIOR REPAIRS AT MASONRY WATER TANK ENCLOSURE AND STREET FACADE WALLS AS PER DRAWINGS. NO CHANGE IN USE, EGRESS OR OCCUPANCY IS INVOLVED UNDER THIS APPLICATION.
M00612958-I1
03/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2025
Permit issued — Plumbing
M00230507-I1-PL
01/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2025
Filed — Alteration
PLUMBING WORK IN APT 3C FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01020130-P1
12/27/2024
Filed — Alteration
Mechanical work file in conjunction with apartment #5B renovation
M01124663-P1
12/19/2024
Permit issued — Plumbing
M01124663-S1-PL
12/05/2024
Permit issued — General Construction
M01124745-I1-GC
12/05/2024
Permit issued — Mechanical Systems
M01124663-S2-MS
12/05/2024
Permit issued — General Construction
M01124663-I1-GC
11/25/2024
Permit issued — Mechanical Systems
M01020130-S2-MS
11/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2024
Permit issued — General Construction
M01020130-I1-GC
11/15/2024
Signed off — Alteration
M00512764-I1
10/31/2024
Special inspection requirement — Structural Steel - Welding
Christian Martos
10/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
10/31/2024
Special inspection requirement — Masonry
Christian Martos
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMETAMORPHOSIS CONSTR CORP10/14/2025
DOB NOWMechanical SystemsSigned-offSAPOL CONSTRUCTION LLC07/30/2025
DOB NOWStructuralSigned-offSAPOL CONSTRUCTION LLC07/30/2025
DOB NOWPlumbingSigned-offDELTA-SIGMA MECH CORP04/30/2025
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/21/2025
DOB NOWPlumbingSigned-offABSOLUTE PLBG & HTG CORP12/19/2024
DOB NOWGeneral ConstructionSigned-offHITE CONSTRUCTION12/05/2024
DOB NOWMechanical SystemsSigned-offHITE CONSTRUCTION12/05/2024
DOB NOWGeneral ConstructionSigned-offHITE CONSTRUCTION12/05/2024
DOB NOWMechanical SystemsSigned-offJGR GROUP11/25/2024
DOB NOWGeneral ConstructionSigned-offJGR GROUP11/20/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedDUN-RITE SPECIALIZED CARR08/22/2024
DOB NOWMechanical SystemsSigned-offSAPOL CONSTRUCTION LLC07/31/2024
DOB NOWStructuralSigned-offSAPOL CONSTRUCTION LLC07/29/2024
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP06/26/2024
DOB NOWPlumbingSigned-offDELTA-SIGMA MECH CORP05/17/2024
DOB NOWMechanical SystemsSigned-offJGR GROUP05/09/2024
DOB NOWGeneral ConstructionSigned-offJGR GROUP05/07/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP05/02/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/22/2024
DOB NOWGeneral ConstructionSigned-offMASPETH CONTRACTING CORP03/22/2024
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP10/25/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/06/2023
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S09/25/2023
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/21/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedDUN-RITE SPECIALIZED CARR09/01/2023
DOB NOWStructuralSigned-offSAPOL CONSTRUCTION LLC08/01/2023
DOB NOWMechanical SystemsSigned-offSAPOL CONSTRUCTION LLC08/01/2023
DOB NOWStructuralSigned-offSAPOL CONSTRUCTION LLC07/18/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP05/04/2023
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/27/2023
DOB NOWGeneral ConstructionSigned-offMASPETH CONTRACTING CORP03/27/2023
DOB NOWMechanical SystemsSigned-offSAPOL CONSTRUCTION LLC01/04/2023
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/20/2022
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC06/14/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP05/05/2022
DOB NOWGeneral ConstructionSigned-offLMA GROUP INC04/26/2022
DOB NOWMechanical SystemsSigned-offLMA GROUP INC04/19/2022
DOB NOWGeneral ConstructionSigned-offMASPETH CONTRACTING CORP03/28/2022
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC03/28/2022
+ 60 more permits on file
1 project · most recent 06/11/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/11/2024——Air Conditioning Systems
Cooling
Daikin FXTQ48TAVJUA 4 tons · Vrf Indoor ×1
RXTQ48TACJUA 4 tons · Vrf Outdoor ×1
2 projects · most recent 06/11/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/11/2024——Gas, Water/Sanitary
11/08/2019Permit IssuedSTEPHEN FOY MECH SVC CORPGas, Water/Sanitary
22 projects · most recent 11/10/2025
General Wiring
FiledStatusContractorScope
11/10/2025CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
08/01/2025CompleteEIS ELECTRIC CORP DBAGeneral Wiring
08/12/2024CompleteT. MCCAFFREY-T. MCGOVERN—
05/22/2024CompleteALLBRIGHT ELECTRIC, INCGeneral Wiring
05/15/2024CompleteNY CITY ELECTRIC INCGeneral Wiring
05/16/2023CompleteAPOLLO ELECTRIC INC.General Wiring
10/19/2022CompleteAWESOME ELECTL CONTNG INC1 meters, 1 new_meters
09/27/2022CompleteAPOLLO ELECTRIC INC.1 meters
09/27/2022CompleteAPOLLO ELECTRIC INC.General Wiring
05/12/2022CompleteA TO Z ELEC CONS & SVC COGeneral Wiring
04/01/2022CompleteHIGH QUALITY ELECTRIC OF—
03/28/2022CompleteAPOLLO ELECTRIC INC.—
05/25/2021CancelledWMS ELECTRICAL CONTNG LTDGeneral Wiring
01/28/2021Permit IssuedPOWERONE ELECT'L CONTRG11 meters, 1 new_meters
02/11/2020CompleteELPO ELECTRICAL CONTG INC—
1 project · most recent 06/29/2018
Sidewalk Shed
FiledStatusContractorScope
06/29/2018Signed-offINTERSYSTEM INSTALLATIONSidewalk Shed
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
08/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/16/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
07/27/2026Fire-Resistant Penetrations and JointsJeffrey Finespecial
07/27/2026Fire-Resistance Rated ConstructionJeffrey Fineprogress
07/27/2026FinalJeffrey Fineprogress
07/03/2026FinalJeffrey Fineprogress
07/03/2026Fire-Resistant Penetrations and JointsJeffrey Finespecial
07/03/2026Fire-Resistance Rated ConstructionJeffrey Fineprogress
10/15/2025Fire-Resistant Penetrations and JointsJeffrey Finespecial
10/15/2025Fire-Resistance Rated ConstructionJeffrey Fineprogress
10/15/2025FinalJeffrey Fineprogress
10/09/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
10/07/2025Mechanical SystemsJACK GREENspecial
10/07/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
10/07/2025FinalRobert Divilioprogress
10/07/2025Post-installed AnchorsChristian Martosspecial
07/23/2025Post-installed AnchorsChristian Martosspecial
07/23/2025Mechanical SystemsJACK GREENspecial
07/23/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
07/23/2025FinalRobert Divilioprogress
05/19/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
10/31/2024Structural Steel - DetailsChristian Martosspecial
10/31/2024Concrete - Cast-In-PlaceChristian Martosspecial
10/31/2024Post-installed AnchorsChristian Martosspecial
10/31/2024Structural Steel - High Strength BoltingChristian Martosspecial
10/31/2024MasonryChristian Martosspecial
10/31/2024Structural Steel - WeldingChristian Martosspecial
Latest 25 of 98.
▾Documents — 926 on file (BIS + DOB NOW)
▸Plans & Drawings57
▸DOB NOWPlans/Sketch35
09/06/2026M00057803-I1Request digital key ↗
09/03/2026M00479993-I1Request digital key ↗
09/03/2026M00512764-S1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
09/03/2026M00476239-I1Request digital key ↗
09/02/2026M00230507-I1Request digital key ↗
09/02/2026M00230507-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00251527-I1Request digital key ↗
09/05/2026M00192218-P3Request digital key ↗
09/05/2026M00192218-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural5
09/05/2026M00271824-I1Request digital key ↗
08/31/2026M00192240-P3Request digital key ↗
08/15/2026M00192240-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00138785-I1Request digital key ↗
09/05/2026M00316168-I1Request digital key ↗
09/05/2026M00318150-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00318150-I1Request digital key ↗
▸Applications & Permits167
▸BISWORK PERMIT APPLICATION65
09/15/2022123790692Open ↗
06/07/2022123790692Open ↗
03/04/2022123790692Open ↗
Showing 3 of 65 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION59
08/01/2025123790692Open ↗
08/06/2024123790692Open ↗
05/31/2023123790692Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWLPC Approval/Permit42
08/20/2026M01249923-P2Open ↗
08/15/2026M00479916-I1Open ↗
08/14/2026M00612958-I1Open ↗
Showing 3 of 42 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
08/21/2025123790692Open ↗
▸Seals & Professional Certifications259
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION100
03/04/2020123531071Open ↗
03/04/2020123531071Open ↗
03/04/2020123531071Open ↗
Showing 3 of 100 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature56
09/05/2026M00216142-I1Open ↗
09/05/2026M00251527-I1Open ↗
09/05/2026M00192218-I1Open ↗
Showing 3 of 56 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature55
09/20/2026M00700331-I1Open ↗
09/02/2026M01249923-I1Open ↗
09/01/2026M00192240-P1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/20/2026M00700331-I1Open ↗
09/02/2026M01249923-I1Open ↗
09/02/2026M01249923-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
08/02/2022141020188Open ↗
03/29/2021141000592Open ↗
03/18/2020123833959Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
03/18/2020123833959Open ↗
10/09/2019123885849Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
08/02/2022141020188Open ↗
03/29/2021141000592Open ↗
07/08/2020140919200Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/02/2022141020188Open ↗
03/29/2021141000592Open ↗
Showing 2 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/08/2020140919200Open ↗
▸Trade Schedules & Equipment62
▸BISSELF-CERT PLUMBING NOTICE25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISSCHEDULE B - PLUMBING16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
07/24/2019122475972Open ↗
07/23/2019123129293Open ↗
07/23/2019123129293Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS8
07/24/2019122475972Open ↗
07/24/2019122475972Open ↗
07/23/2019123129293Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
01/08/2019123129293Open ↗
Showing 1 of 5 on file for this type
▸Safety & Tenant Protection31
▸DOB NOWTenant Protection Plan18
09/05/2026M00316168-I1Open ↗
Showing 1 of 18 on file for this type
▸BISTenant Protection Plan and Notes10
03/18/2020123833959Open ↗
01/10/2020123790692Open ↗
10/09/2019123885849Open ↗
Showing 3 of 10 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos56
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/05/2026M00216142-I1Open ↗
09/05/2026M00251527-I1Open ↗
09/05/2026M00271824-I1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
07/08/2020140919200Open ↗
10/09/2019123885849Open ↗
09/07/2018123531071Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/05/2026M00192218-I1Open ↗
08/14/2026M00192240-I1Open ↗
Showing 2 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/30/2020123790692Open ↗
▸Energy Compliance27
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
02/28/2020123531071Open ↗
07/24/2019122475972Open ↗
09/07/2018123531071Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
02/28/2020123531071Open ↗
07/12/2019122475972Open ↗
Showing 2 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
01/10/2020123790692Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/02/2022141020188Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/02/2022141020188Open ↗
▸BISNYCECC EXEMPTION1
07/08/2020140919200Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
05/11/2023123143197Open ↗
08/02/2022141020188Open ↗
12/28/2021140919200Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/23/2025123790692Open ↗
▸Approvals, Objections & Sign-offs103
▸BISLANDMARKS APPROVAL35
09/23/2024123790692Open ↗
08/02/2022141020188Open ↗
03/29/2021141000592Open ↗
Showing 3 of 35 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST33
08/21/2025123790692Open ↗
05/12/2023123143197Open ↗
12/29/2021140919200Open ↗
Showing 3 of 33 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
03/29/2021141000592Open ↗
03/30/2020123790692Open ↗
03/30/2020123790692Open ↗
Showing 3 of 14 on file for this type
▸BISSUPERSEDING LETTER3
09/15/2022123790692Open ↗
06/07/2022123790692Open ↗
03/04/2022123790692Open ↗
▸BISLANDMARKS SIGNOFF3
05/11/2023123143197Open ↗
12/23/2021140919200Open ↗
09/07/2018123531071Open ↗
▸Cost, Insurance & Ownership65
▸BISCOST AFFIDAVIT63
05/11/2023123143197Open ↗
08/02/2022141020188Open ↗
12/28/2021140919200Open ↗
Showing 3 of 63 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/16/2025123790692Open ↗
05/12/2023123143197Open ↗
▸Filing & Intake Forms70
▸BISEFILING COVER SHEET33
03/18/2020123833959Open ↗
12/20/2019123790692Open ↗
10/09/2019123885849Open ↗
Showing 3 of 33 on file for this type
▸BISADDITIONAL INFORMATION17
09/23/2024123790692Open ↗
08/08/2022123790692Open ↗
10/29/2021140919200Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM16
03/04/2022123790692Open ↗
03/30/2020123790692Open ↗
03/30/2020123790692Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/02/2022141020188Open ↗
03/29/2021141000592Open ↗
07/08/2020140919200Open ↗
Showing 3 of 4 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
03/30/2020123790692Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWProof of Historic Building7
08/20/2026M01249923-P2Open ↗
Showing 1 of 7 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01071909-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01071909-I1Open ↗