Elevator cooperative
889 LEXINGTON AVENUE
MANHATTAN · BIN 1042461
💬 Discuss this project
1906Year Built
11Stories
D4Building Class
R9XZoning
134,467 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized4 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: 131 EAST 66TH STREET CORPORATION · 17,071 sf lot · 7.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof5p · 4 filings · 20 docs
Floor 111p · 1 filing · 5 docs
Floor 10
Floor 94p · 2 filings · 11 docs
Floor 83p · 1 filing · 6 docs
Floor 73p · 1 filing · 6 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIGHTSTONE GROUP907/08/2026
131 EAST 66TH STREET6203/22/2026
131 E 66 ST2003/22/2026
BROWN HARRIS STEVENS RESIDENTIAL403/22/2026
131 EAST 66TH OWNERS CORP103/22/2026
131 EAST 66 ST. CORP103/22/2026
QUALITY BLDG CONSTRUCTION403/22/2026
TWO TONE CONTRACTING103/21/2026
COLGATE ENTERPRISES203/21/2026
131 E 66TH STREET1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1403/21/2026
AE DESIGN SOLUTION603/21/2026
VICTOR SCHWARTZ ARCHITECT103/21/2026
PDG BUILDING CONSULTANTS LLC LLC203/21/2026
DOMANI CONSULTING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C&A SENECA CONSTRUCTION LGeneral Contractor907/08/2026
INFINITY CONSTRUCTION INC.General Contractor807/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor507/08/2026
BENT MECHANICAL CORPPlumbing207/08/2026
DONATO PLUMBING, INCPlumbing107/08/2026
J.M.C. ELECTRICAL CORP.Electrical103/22/2026
GEM AIR CONDITIONING INCGeneral Contractor107/08/2026
GILSTON BROTHERS ELECT'LElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678210/07/2024
RODMAN PAUL ARCHITECTS PL7162510/07/2024
ABS ENGINEERING, PLLC4835306/04/2024
VICTOR SCHWARTZ ARCHITECT1714110/04/2021
DOMANI INSPECTION SERVICE843211/19/2019
Building Lifecycle
All (154)Filed (14)Permit Issued (21)Signed Off (11)Facade (FISP) (12)Violation (60)Inspection (3)Objection (6)Special Inspection (27)
08/19/2025
Signed off — Alteration
Herewith filing plumbing application, as per plans submitted. No change in use, egress or occupancy.
M01003095-I1
05/23/2025
Signed off — Alteration
Herewith filing mechanical application as per plans submitted. No change in use, egress or occupancy.
M01003135-I1
05/19/2025
Signed off — Alteration
Herewith filing application for interior renovation, construction of new partitions, doors, floor and wall finishes. Non-structural demolition. Minor structural work. No change in use, egress or occupancy.
M01003018-I1
04/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/03/2025
Signed off — Alteration
INTERIOR RENOVATION on 7, 8 & 9TH FLOORS IN APARTMENT #s 7E, 8E, 8F, 9E,9F TO COMPLY WITH VIOLATION #35537536X. (8F and 9F is an existing duplex (per CO# 68006) and combining 8E and 9E all into one apartment) NO CHANGE IN USE, egress or Occupancy
M00456298-I1
12/23/2024
Permit issued — Suspended Scaffold
M01152976-I1-SC
12/09/2024
Filed — Alteration
M01152976-I1
10/11/2024
Special inspection requirement — Final
Michael Fasulo
10/11/2024
Special inspection requirement — Post-installed Anchors
Michael Fasulo
10/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
10/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Fasulo
10/07/2024
Filed — Alteration
Herewith filing application for interior renovation, construction of new partitions, doors, floor and wall finishes. Non-structural demolition. Minor structural work. No change in use, egress or occupancy.
M01003018-P1
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Fasulo
09/30/2024
Special inspection requirement — Post-installed Anchors
Michael Fasulo
09/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ari Kamo
09/30/2024
Special inspection requirement — Final
Michael Fasulo
09/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2024
Permit issued — Mechanical Systems
M01003135-I1-MS
07/11/2024
Permit issued — Plumbing
M01003095-I1-PL
07/11/2024
Permit issued — General Construction
M01003018-I1-GC-CX
06/04/2024
Filed — Alteration
Herewith filing plumbing application, as per plans submitted. No change in use, egress or occupancy.
M01003095-I1
06/04/2024
Filed — Alteration
Herewith filing mechanical application as per plans submitted. No change in use, egress or occupancy.
M01003135-I1
06/03/2024
Permit issued — Suspended Scaffold
M01034049-I1-SC
05/24/2024
Filed — Alteration
Herewith filing application for interior renovation, construction of new partitions, doors, floor and wall finishes. Non-structural demolition. Minor structural work. No change in use, egress or occupancy.
M01003018-I1
05/20/2024
Special inspection requirement — Electrical motors and elevators
Alex Schwartz
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
05/20/2024
Special inspection requirement — Post-installed Anchors
Alex Schwartz
05/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Alex Schwartz
05/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
Alex Schwartz
05/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
Alex Schwartz
05/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Alex Schwartz
05/20/2024
Special inspection requirement — Maintenance information
Alex Schwartz
05/20/2024
Special inspection requirement — Shutoff dampers
Alex Schwartz
05/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alex Schwartz
05/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Alex Schwartz
05/17/2024
Special inspection requirement — Post-installed Anchors
Alex Schwartz
04/26/2024
Permit issued — Suspended Scaffold
M01034049-I1-SC
04/11/2024
Filed — Alteration
Installation of suspended scaffold for facade work
M01034049-I1
02/08/2024
Special inspection requirement — Mechanical Systems
Alex Schwartz
02/08/2024
Special inspection requirement — Final
Alex Schwartz
01/02/2024
Cycle 9 facade report submitted
01/02/2024
Cycle 9 facade report signed — SAFE
11/14/2023
Cycle 9 facade inspection completed
09/22/2023
Signed off — Alteration
M00564191-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/27/2022
Signed off — Alteration
Install HVAC systems with rooftop unit and associated ducts servicing Apartment #10/11E. No change to use egress or occupancy.
M00443905-I1
12/14/2021
Signed off — Alteration
Interior renovation of upper duplex unit (#10/11E) on the 11th floor. No change to use, egress, or occupancy.
M00447328-I1
12/09/2021
Signed off — Alteration
M00443938-I1
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/18/2021
Permit issued — Mechanical Systems
M00564191-I1-MS
10/14/2021
Permit issued — General Construction
M00447328-I1-GC
10/04/2021
Filed — Alteration
M00564191-I1
05/20/2021
Permit issued — General Construction
M00456298-I1-GC
05/10/2021
Permit issued — General Construction
M00447328-I1-GC
04/27/2021
Permit issued — General Construction
M00456298-I1-GC
04/27/2021
Permit issued — Plumbing
M00443938-I1-PL
04/01/2021
Permit issued — Plumbing
M00443938-I1-PL
03/26/2021
Permit issued — Mechanical Systems
M00443905-I1-MS
02/18/2021
Objection raised — Other
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedJEPOL CONSTRUCTION INC12/23/2024
DOB NOWMechanical SystemsSigned-offINFINITY CONSTRUCTION INC.07/15/2024
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC07/11/2024
DOB NOWGeneral ConstructionSigned-offINFINITY CONSTRUCTION INC.07/11/2024
DOB NOWSuspended ScaffoldPermit IssuedSCHNELLBACHER-SENDON GROU06/03/2024
DOB NOWSuspended ScaffoldPermit IssuedSCHNELLBACHER-SENDON GROU04/26/2024
DOB NOWMechanical SystemsSigned-offGEM AIR CONDITIONING10/18/2021
DOB NOWGeneral ConstructionSigned-offINFINITY CONSTRUCTION INC.10/14/2021
DOB NOWGeneral ConstructionSigned-offC&A SENECA CONSTRUCTION L05/20/2021
DOB NOWGeneral ConstructionSigned-offINFINITY CONSTRUCTION INC.05/10/2021
DOB NOWGeneral ConstructionSigned-offC&A SENECA CONSTRUCTION L04/27/2021
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP04/27/2021
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP04/01/2021
DOB NOWMechanical SystemsSigned-offINFINITY CONSTRUCTION INC.03/26/2021
DOB NOWStructuralSigned-offC&A SENECA CONSTRUCTION L07/02/2020
DOB NOWStructuralSigned-offC&A SENECA CONSTRUCTION L06/24/2020
DOB NOWStructuralSigned-offC&A SENECA CONSTRUCTION L03/02/2020
DOB NOWStructuralSigned-offC&A SENECA CONSTRUCTION L11/20/2019
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC04/12/2019
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/27/2018
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/24/2018
BISOTISSUED109 CONSTRUCTION LLC02/02/2026
BISOTISSUEDRIVERSIDE BUILDERS INC09/18/2019
BISMHISSUEDRIVERSIDE BUILDERS INC09/18/2019
BISPLISSUEDNEW MILLENNIUM P & H CORP06/21/2019
BISOTISSUEDSCHNELLBACHER-SENDON GRO*05/29/2019
BISPLISSUEDAMER-A-PIPE PLBG & HTG INC05/20/2019
BISMHISSUEDMACBLAKE CONSULTING SERV05/17/2019
BISOTISSUEDRIVERSIDE BUILDERS INC02/15/2019
BISPLISSUEDS&H PLUMBING,INC02/15/2019
BISOTISSUEDRIVERSIDE BUILDERS INC02/15/2019
BISMHISSUEDRIVERSIDE BUILDERS INC02/15/2019
BISMHISSUEDZZZ CARPENTRY INC11/26/2018
BISOTISSUEDZZZ CARPENTRY INC11/26/2018
BISOTISSUEDZZZ CARPENTRY INC11/26/2018
BISOTRE-ISSUEDSCHNELLBACHER-SENDON GRO*09/04/2018
BISOTISSUEDZZZ CARPENTRY INC08/20/2018
BISOTISSUEDTEMPLE CONTRACTING INC08/20/2018
BISPLISSUEDMCMANUS MECH MAINT P&H INC11/22/2017
BISPLISSUEDNEW MILLENNIUM P & H CORP06/21/2016
+ 31 more permits on file
9 projects · most recent 07/13/2024
General Wiring HVAC Wiring
FiledStatusContractorScope
07/13/2024CompleteAE ELECTRIC INCGeneral Wiring
03/02/2023CompleteC.L. ELECTRIC CORPGeneral Wiring
06/20/2021CompleteATTRACTIVE LIGHTING ELECL—
04/12/2021CompleteAPOLLO ELECTRIC NYG, INCGeneral Wiring
03/01/2021CompleteGILSTON BROTHERS ELECT'LGeneral Wiring
03/02/2020Permit IssuedJ.M.C. ELECTRICAL CORP.—
02/14/2020CompleteDELTA PHASE ELEC'L CORP.General Wiring, HVAC Wiring
08/28/2019CompleteALL WAYS ELECTRIC CORP.W—
07/24/2018CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 04/11/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
04/11/2024Permit IssuedSCHNELLBACHER-SENDON GROUSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
10/11/2024FinalMichael Fasuloprogress
10/11/2024Post-installed AnchorsMichael Fasulospecial
10/11/2024Structural Stability – Alterations of existing buildingsAri Kamospecial
10/11/2024Fire-Resistant Penetrations and JointsMichael Fasulospecial
09/30/2024Fire-Resistant Penetrations and JointsMichael Fasulospecial
09/30/2024Post-installed AnchorsMichael Fasulospecial
09/30/2024Structural Stability – Alterations of existing buildingsAri Kamospecial
09/30/2024FinalMichael Fasuloprogress
05/20/2024Electrical motors and elevatorsAlex Schwartzenergy_progress
05/20/2024Fire-Resistant Penetrations and JointsAlex Schwartzspecial
05/20/2024Post-installed AnchorsAlex Schwartzspecial
05/20/2024Energy Code Compliance InspectionsAlex Schwartzprogress
05/20/2024HVAC-R and service water heating system controlsAlex Schwartzenergy_progress
05/20/2024HVAC-R and service water heating equipmentAlex Schwartzenergy_progress
05/20/2024HVAC-R and service water piping design and insulationAlex Schwartzenergy_progress
05/20/2024Maintenance informationAlex Schwartzenergy_progress
05/20/2024Shutoff dampersAlex Schwartzenergy_progress
05/17/2024Fire-Resistant Penetrations and JointsAlex Schwartzspecial
05/17/2024Energy Code Compliance InspectionsAlex Schwartzprogress
05/17/2024Post-installed AnchorsAlex Schwartzspecial
02/08/2024Mechanical SystemsAlex Schwartzspecial
02/08/2024FinalAlex Schwartzprogress
01/20/2021Fire-Resistant Penetrations and JointsMichael Fasulospecial
01/19/2021FinalELIZABETH REXRODEprogress
12/22/2020Mechanical SystemsAlex Schwartzspecial
Latest 25 of 27.
▾Documents — 464 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch8
09/06/2026M00062582-I1Request digital key ↗
09/03/2026M00564191-I1Request digital key ↗
08/27/2026M01034049-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00447328-I1Request digital key ↗
08/14/2026M00456298-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00255175-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00149911-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00443905-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00443938-I1Request digital key ↗
▸Applications & Permits100
▸BISWORK PERMIT APPLICATION47
02/03/2026123174509Open ↗
06/21/2019123475710Open ↗
05/30/2019123376550Open ↗
Showing 3 of 47 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION44
06/27/2025123174509Open ↗
01/10/2025100542254Open ↗
12/24/2024104066163Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWLPC Approval/Permit8
09/05/2026M00255175-I1Open ↗
09/04/2026M00447328-I1Open ↗
09/04/2026M00443905-I1Open ↗
Showing 3 of 8 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications90
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION49
10/25/2019123475710Open ↗
09/06/2019123376550Open ↗
07/29/2019123575470Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/05/2026M00255175-I1Open ↗
09/04/2026M00447328-I1Open ↗
09/04/2026M00443905-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/27/2026M01003018-P1Open ↗
09/27/2026M01003018-P1Open ↗
09/27/2026M01003018-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/27/2026M01003018-P1Open ↗
08/28/2026M01003135-I1Open ↗
08/28/2026M01003135-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment41
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
03/10/2020123476443Open ↗
02/28/2020123476443Open ↗
02/21/2020123174509Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING7
05/04/2020123476443Open ↗
Showing 1 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/26/2017122559141Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
09/26/2017122559141Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes7
08/17/2018123476443Open ↗
08/09/2018123376550Open ↗
07/12/2018123475710Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTenant Protection Plan2
09/05/2026M00255175-I1Open ↗
08/13/2026M00443938-I1Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos26
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00255175-I1Open ↗
09/04/2026M00447328-I1Open ↗
09/04/2026M00443905-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
11/26/2018123476443Open ↗
08/09/2018123376550Open ↗
07/12/2018123475710Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
09/06/2019123376550Open ↗
05/10/2019123174509Open ↗
08/09/2018123376550Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
10/25/2019123475710Open ↗
09/06/2019123376550Open ↗
10/13/2017122559141Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE3
08/21/2018123575470Open ↗
08/17/2018123476443Open ↗
08/17/2018123575470Open ↗
▸DOB NOWEN2: As Built Energy Analysis.3
09/04/2026M00447328-I1Open ↗
09/04/2026M00443905-I1Open ↗
08/13/2026M00564191-I1Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
01/14/2025100542254Open ↗
05/17/2021104029926Open ↗
05/17/2021104029926Open ↗
Showing 3 of 10 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
01/14/2025100542254Open ↗
▸Approvals, Objections & Sign-offs53
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
01/15/2025100542254Open ↗
05/17/2021104029926Open ↗
03/11/2021103818040Open ↗
Showing 3 of 20 on file for this type
▸BISLANDMARKS APPROVAL19
10/25/2019123475710Open ↗
09/06/2019123376550Open ↗
07/29/2019123575470Open ↗
Showing 3 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
05/17/2021104029926Open ↗
05/17/2021104029926Open ↗
10/13/2017122559141Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLANDMARKS SIGNOFF2
05/17/2021104029926Open ↗
05/22/2020123476443Open ↗
▸BISSUPERSEDING LETTER2
02/03/2026123174509Open ↗
02/20/2019123476443Open ↗
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT33
05/17/2021104029926Open ↗
05/17/2021104029926Open ↗
05/22/2020123476443Open ↗
Showing 3 of 33 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
06/21/2016122559141Open ↗
▸Filing & Intake Forms46
▸BISEFILING COVER SHEET20
10/26/2018123476443Open ↗
10/11/2018123476443Open ↗
08/17/2018123476443Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION15
05/22/2020123476443Open ↗
03/19/2020123476443Open ↗
03/18/2020123174509Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM9
02/03/2026123174509Open ↗
02/28/2020123476443Open ↗
02/21/2020123174509Open ↗
Showing 3 of 9 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
05/15/2019123174509Open ↗
11/20/2015121940819Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026M01003018-I1Open ↗
08/13/2026M01003018-P1Open ↗
08/13/2026M01003095-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01034049-I1Open ↗
08/13/2026M01152976-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01034049-I1Open ↗
08/13/2026M01152976-I1Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
01/14/2025100542254Open ↗
▸BISLAA - Supporting Documentation1
12/29/2017100907645Open ↗
▸DOB NOWWaiver Document1
08/13/2026M00456298-I1Open ↗