← Back
BuildNYC
Unlicensed parking lot
Jamaica Central
89-25 162ND STREET · Jamaica · BIN 4208881
💬 Discuss this project
1990Year Built
1Stories
G7Building Class
C4-4DZoning
0 sfGross Floor Area
0Units
0 Active ViolationsFDNY Report ↗
Unlicensed parking lot · Owner of record: Vaja Jamaica Building B · 14,277 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsThe Vaja Group2 filings
RoofThe Vaja Group1p · 2 filings
Floor 5The Vaja Group1 filing
Floor 4The Vaja Group1 filing
Floor 3
Floor 2
Floor 1The Vaja Group1p · 4 filings · 2 docs
CellarThe Vaja Group1p · 2 filings · 2 docs
Site & exteriorThe Vaja Group6 filings · 2 docs
Filed — no permit issuedNorthern Conference of Seventh-day Adventists1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vaja Group7109/13/2026
Windfall Group103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/04/2018$5.0M—Private party → JJSS JAMAICA PL LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YG Expediting2203/21/2026
SNR Expediting Design1403/21/2026
A1 Expediting Service203/21/2026
Raymond Chan Architect203/21/2026
Meldan Group203/21/2026
MJB Consultants203/21/2026
HM Loke Consulting Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
City Wide Builders GroupGeneral Contractor707/08/2026
City Wide Builders GroupScaffold504/09/2026
New American ConstructionScaffold504/09/2026
Target Piping NYFire Protection307/08/2026
B&B Mechanical Plumbing & HeatingPlumbing207/08/2026
Cole PartnersScaffold104/09/2026
Manhattan Concretespecialty_contractor104/09/2026
Prime Piping & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma91681704/20/2026
Shahrish Shuvo Engineering8524106/23/2023
Building Lifecycle
All (203)Filed (42)Permit Issued (23)Signed Off (14)Violation (2)Inspection (15)Objection (74)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
07/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
07/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
07/29/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
07/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
07/29/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
07/29/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
05/11/2026
Violation issued (HPD, closed)
A
04/29/2026
Signed off — Alteration
Underground Plumbing Work Type filed in conjunction with NB #Q00721898-I1
Q01253592-I1
04/25/2026
Objection raised — Other
04/21/2026
Filed — Alteration
Underground Plumbing Work Type filed in conjunction with NB #Q00721898-I1
Q01253592-P1
04/20/2026
Filed — New Building
Foundation Underpinning Application filed in conjunction with NB #Q00721898-I1
Q00721898-A4
04/17/2026
Special inspection requirement — Fenestration areas
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Air barrier continuity plan testing
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Exterior lighting power
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Air barrier - visual inspection
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Protection of exposed foundation insulation
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Interior lighting power
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Lighting in dwelling units
SOORJBALLY HARILALL
04/17/2026
Special inspection requirement — Metering
SOORJBALLY HARILALL
04/16/2026
Filed — New Building
Foundation Underpinning Application filed in conjunction with NB #Q00721898-I1
Q00721898-A5
04/14/2026
Signed off — New Building
Foundation Underpinning Application filed in conjunction with NB #Q00721898-I1
Q00721898-S9
03/24/2026
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE FILED FOR THIS NEW BUILDING GC # Q00721898-I1
Q01177104-I1
03/23/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
03/23/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
03/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
03/20/2026
Permit issued — Construction Fence
Q01177104-I1-FN
03/18/2026
Filed — New Building
Foundation Underpinning Application filed in conjunction with NB #Q00721898-I1
Q00721898-A3
03/18/2026
Signed off — New Building
Foundation Underpinning Application filed in conjunction with NB #Q00721898-I1
Q00721898-Z3
03/11/2026
Signed off — Alteration
Q00913918-I1
03/10/2026
Signed off — New Building
Foundation Underpinning Application filed in conjunction with NB #Q00721898-I1
Q00721898-S1
03/10/2026
Signed off — New Building
Foundation Underpinning Application filed in conjunction with NB #Q00721898-I1
Q00721898-S3
03/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/27/2026
Violation issued (FDNY_NOV, closed)
02/26/2026
Filed — New Building
Foundation Underpinning Application filed in conjunction with NB #Q00721898-I1
Q00721898-A2
02/25/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.
Q01268674-I1
02/25/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01250636-I1
02/25/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01238305-I1
02/17/2026
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
02/17/2026
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
02/12/2026
Filed — New Building
Foundation Underpinning Application filed in conjunction with NB #Q00721898-I1
Q00721898-A1
02/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/05/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/30/2026
Signed off — Alteration
EQUIPMENT USE: SINGLE 6000 # CAPACITY PERSONNEL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Q01266619-I1
01/21/2026
Signed off — Alteration
SOE filed in conjunction with NB GC #Q00721898-I1
Q01230849-I1
Latest 60 of 203 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offCity Wide Builders Group03/20/2026
DOB NOWGeneral ConstructionPermit IssuedCity Wide Builders Group12/26/2025
DOB NOWMechanical SystemsSigned-offCity Wide Builders Group12/04/2025
DOB NOWGeneral ConstructionPermit IssuedCity Wide Builders Group11/05/2025
DOB NOWPlumbingSigned-offTarget Piping NY09/15/2025
DOB NOWStandpipePermit IssuedTarget Piping NY08/20/2025
DOB NOWStandpipeSigned-offTarget Piping NY08/20/2025
DOB NOWSprinklersSigned-offTarget Piping NY08/20/2025
DOB NOWProtection and Mechanical MethodsSigned-offNew American Construction08/18/2025
DOB NOWProtection and Mechanical MethodsSigned-offNew American Construction08/13/2025
DOB NOWProtection and Mechanical MethodsSigned-offNew American Construction08/12/2025
DOB NOWSupported ScaffoldSigned-offNew American Construction08/06/2025
DOB NOWPlumbingSigned-offTarget Piping NY08/01/2025
DOB NOWStructuralSigned-offCity Wide Builders Group07/29/2025
DOB NOWPlumbingSigned-offPrime Piping & Heating07/17/2025
DOB NOWSidewalk ShedSigned-offNew American Construction06/30/2025
DOB NOWSupport of ExcavationSigned-offCity Wide Builders Group06/30/2025
DOB NOWFoundationSigned-offCity Wide Builders Group06/06/2025
DOB NOWConstruction FenceSigned-offCity Wide Builders Group05/23/2025
DOB NOWFull DemolitionSigned-offCity Wide Builders Group01/22/2025
DOB NOWConstruction FenceSigned-offCity Wide Builders Group05/29/2024
DOB NOWConstruction FenceSigned-offCole Partners08/07/2023
DOB NOWFoundationSigned-offManhattan Concrete06/02/2022
1 project · most recent 04/20/2026
Air Conditioning Systems Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/20/2026Permit IssuedCity Wide Builders GroupAir Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PKA-A24KA7 2 tons · Heat Pump Outdoor ×1
PURY-P144TNY-A 12 tons · Vrf Outdoor ×1
Aaon RN-025-8-0-K60E-16A 25 tons · Rooftop Unit ×1
Ventilation
Enervex BEF 400 24,000 CFM · Kitchen Exhaust ×8
BEF 250 600 CFM · Kitchen Exhaust ×1
BEF400 3,600 CFM · Kitchen Exhaust ×1
Greenheck AX-80-285-0613-A75 12,500 CFM · Exhaust Fan ×2
USF-27-B4 7,500 CFM · Exhaust Fan ×2
G-097-VG 100 CFM · Exhaust Fan ×1
G-099-VG 750 CFM · Exhaust Fan ×1
G-100HP-VG 400 CFM · Exhaust Fan ×1
SQ-90-VG 300 CFM · Exhaust Fan ×1
Nutone AEN110 50 CFM · Exhaust Fan ×1
Cooling
Samsung AM036TXMDCH/AA 38,000 BTU · Vrf Outdoor ×1
Heating
Samsung AM036TXMDCH/AA 42,000 BTU · Vrf Outdoor ×1
1 project · most recent 04/20/2026
Sprinkler System
FiledStatusContractorScope
04/20/2026Signed-offTarget Piping NYSprinkler System
2 projects · most recent 04/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/20/2026Signed-offTarget Piping NYGas, Storm, Water/Sanitary
06/10/2025——Gas, Storm, Water/Sanitary
4 projects · most recent 03/15/2026
General Wiring
FiledStatusContractorScope
03/15/2026CompleteAccurate ElectricalGeneral Wiring
08/19/2025CompletePower Direct Electric—
08/11/2025CompleteRichard Neu—
06/30/2025CompleteRichard Neu—
1 project · most recent 04/20/2026
Concrete
FiledStatusContractorScope
04/20/2026Permit IssuedCity Wide Builders GroupConcrete
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
03/23/2026Pass-Final SD - Fire PumpPassView ↗
03/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/17/2026Pass-Final SD - Fire PumpPassView ↗
02/17/2026Pass-Final SP - More than 10 Requested FloorsPassView ↗
02/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/05/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/06/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
09/16/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
08/27/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
08/27/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/22/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 126
DateRequirementInspectorRole
07/29/2026HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
07/29/2026Maintenance informationSOORJBALLY HARILALLenergy_progress
07/29/2026HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
07/29/2026HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
07/29/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/29/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
07/29/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
04/17/2026Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
04/17/2026MeteringSOORJBALLY HARILALLenergy_progress
04/17/2026Fenestration and door U-factor and product ratingsSOORJBALLY HARILALLenergy_progress
04/17/2026Fenestration air leakageSOORJBALLY HARILALLenergy_progress
04/17/2026Air barrier continuity plan testingSOORJBALLY HARILALLenergy_progress
04/17/2026Electrical motors and elevatorsSOORJBALLY HARILALLenergy_progress
04/17/2026Interior lighting powerSOORJBALLY HARILALLenergy_progress
04/17/2026Fire-Resistance Rated ConstructionSOORJBALLY HARILALLprogress
04/17/2026Fenestration areasSOORJBALLY HARILALLenergy_progress
04/17/2026Air barrier - visual inspectionSOORJBALLY HARILALLenergy_progress
04/17/2026Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
04/17/2026Exterior lighting powerSOORJBALLY HARILALLenergy_progress
04/17/2026Protection of exposed foundation insulationSOORJBALLY HARILALLenergy_progress
04/17/2026Lighting controlsSOORJBALLY HARILALLenergy_progress
04/17/2026Lighting in dwelling unitsSOORJBALLY HARILALLenergy_progress
04/17/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
03/23/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
03/23/2026HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
Latest 25 of 126.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Northern Conference of Seventh-day AdventistsReligious—
Project Q00780394 Alteration · Approved · 07/24/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 227 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch40
08/26/2026Q00780394-I1Request digital key ↗
08/24/2026Q00882091-I1Request digital key ↗
08/24/2026Q00913918-I1Request digital key ↗
Showing 3 of 40 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
08/26/2026Q00780306-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
05/05/2025440822754Open ↗
03/11/2025440714997Open ↗
05/03/2022440714997Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
05/05/2025440822754Open ↗
▸DOB NOWDEP Stormwater Construction Permit1
08/13/2026Q00721898-S1Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
08/13/2026Q00721898-S1Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWZD1: DOB Zoning Diagram5
08/17/2026Q00721898-P9Open ↗
08/17/2026Q00721898-I1Open ↗
08/17/2026Q00721898-A5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/17/2026Q00721898-I1Open ↗
08/17/2026Q00721898-A5Open ↗
08/17/2026Q00721898-P9Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications130
▸DOB NOWProgress Inspector Seal & Signature67
09/23/2026Q00721898-Z3Open ↗
09/23/2026Q00721898-Z3Open ↗
09/02/2026Q00721898-I1Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature41
08/26/2026Q00780306-I1Open ↗
08/24/2026Q00882091-I1Open ↗
08/24/2026Q00913918-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026Q00721898-Z3Open ↗
09/02/2026Q00721898-I1Open ↗
09/02/2026Q00721898-S7Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/05/2025440822754Open ↗
05/03/2022440714997Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
05/05/2025440822754Open ↗
05/03/2022440714997Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/17/2026Q00721898-P9Open ↗
08/17/2026Q00721898-I1Open ↗
08/14/2026Q00721898-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWElectric Cut-Off1
08/13/2026Q00882091-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/17/2026Q00721898-I1—
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist5
08/17/2026Q00721898-A5Open ↗
08/17/2026Q00721898-P9Open ↗
08/17/2026Q00721898-I1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
06/25/2025440822754Open ↗
05/05/2025440822754Open ↗
05/03/2022440714997Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/25/2025440822754Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026Q00721898-Z3Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
05/05/2025440822754Open ↗
05/03/2022440714997Open ↗
▸Other Documents21
▸DOB NOWProperty Ownership Certification6
08/24/2026Q00882091-I1Open ↗
08/17/2026Q00721898-A5Open ↗
08/17/2026Q00721898-P9Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
08/17/2026Q00721898-I1Open ↗
08/17/2026Q00721898-A5Open ↗
08/17/2026Q00721898-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/17/2026Q00721898-I1Open ↗
08/17/2026Q00721898-A5Open ↗
08/17/2026Q00721898-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01230849-I1Open ↗
08/13/2026Q00721898-S2Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00882091-I1Open ↗
▸DOB NOWStructure Photographs1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCommunity Board Notification1