← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Tree of Life Condominium
89-46 164TH STREET · BIN 4623027
💬 Discuss this project
2018Year Built
12Stories
RMBuilding Class
C4-4DZoning
143,679 sfGross Floor Area
176Units
LL97 CoveredRent Stabilized0 Open Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: FIRST JAMAICA 164 STREET HOUSING DEVELOP MENT FUND · 24,397 sf lot · 5.89 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Floor 27p · 3 filings · 20 docs
Floor 19p · 3 filings · 20 docs
Cellar2p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NHE MANAGEMENT ASSOCIATES1807/08/2026
TOL WORKFORCE LLC TOL LIHTC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PATUXENT ENGINEERING LLC108/04/2026
LILKER ASSOCIATES CONSULTING ENGINE1008/17/2022
GREEN DESIGN312/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRISTATE PLBG SVCS CORPFire Protection207/08/2026
L.F. DRISCOLL COMPANY LLCGeneral Contractor207/08/2026
VAYA RESTORATION INCGeneral Contractor208/05/2026
TRISTATE PLBG SVCS CORPPlumbing207/08/2026
G.M.A. PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC6781308/17/2022
Building Lifecycle
All (119)Filed (14)Permit Issued (9)Signed Off (4)Violation (60)Objection (2)Special Inspection (30)
08/04/2026
Filed — Alteration
INSTALLATION OF 2 PT SUSPENDED SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01435596-I1
08/04/2026
Permit issued — Suspended Scaffold
Q01435596-I1-SC
05/11/2026
Violation issued (HPD, closed)
A
03/28/2026
Violation issued (HPD, closed)
A
07/25/2025
Violation issued (HPD, closed)
C
06/16/2025
Violation issued (HPD, closed)
A
10/22/2024
Violation issued (HPD, closed)
B
10/22/2024
Violation issued (HPD, closed)
A
10/22/2024
Violation issued (HPD, closed)
B
10/22/2024
Violation issued (HPD, closed)
C
10/22/2024
Violation issued (HPD, closed)
C
08/12/2024
Violation issued (HPD, closed)
B
08/12/2024
Violation issued (HPD, closed)
C
06/21/2024
Violation issued (HPD, closed)
C
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2024
Violation issued (HPD, closed)
B
01/29/2024
Violation issued (HPD, closed)
C
01/26/2024
Violation issued (HPD, closed)
B
01/26/2024
Violation issued (HPD, closed)
A
01/26/2024
Violation issued (HPD, closed)
B
01/26/2024
Violation issued (HPD, closed)
C
01/26/2024
Violation issued (HPD, closed)
B
01/26/2024
Violation issued (HPD, closed)
B
09/05/2023
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION
Q00424048-I1
08/26/2023
Violation issued (HPD, closed)
C
08/26/2023
Violation issued (HPD, closed)
C
08/26/2023
Violation issued (HPD, closed)
C
08/26/2023
Violation issued (HPD, closed)
C
08/26/2023
Violation issued (HPD, closed)
C
08/26/2023
Violation issued (HPD, closed)
C
08/11/2023
Violation issued (HPD, closed)
A
08/11/2023
Violation issued (HPD, closed)
A
07/23/2023
Violation issued (HPD, closed)
A
07/23/2023
Violation issued (HPD, closed)
A
07/23/2023
Violation issued (HPD, closed)
A
07/23/2023
Violation issued (HPD, closed)
A
07/23/2023
Violation issued (HPD, closed)
A
07/23/2023
Violation issued (HPD, closed)
A
07/23/2023
Violation issued (HPD, closed)
C
07/20/2023
Violation issued (HPD, closed)
A
07/20/2023
Violation issued (HPD, closed)
C
07/20/2023
Violation issued (HPD, closed)
A
07/20/2023
Violation issued (HPD, closed)
A
07/20/2023
Violation issued (HPD, closed)
C
07/20/2023
Violation issued (HPD, closed)
A
07/13/2023
Violation issued (HPD, closed)
B
07/13/2023
Violation issued (HPD, closed)
B
06/28/2023
Violation issued (HPD, closed)
C
09/30/2022
Signed off — Alteration
Sprinkler and Plumbing work filed in conjunction with Tenant Fit-Out. There is no change in use, egress or occupancy.
Q00286876-I1
08/29/2022
Objection resolved — Addressed
08/26/2022
Objection raised — Other
08/17/2022
Filed — Alteration
Sprinkler and Plumbing work filed in conjunction with Tenant Fit-Out. There is no change in use, egress or occupancy.
Q00286876-P3
08/09/2022
Special inspection requirement — Sprinkler Systems
Ari Kamo
08/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
08/09/2022
Special inspection requirement — Post-installed Anchors
Ari Kamo
07/26/2022
Signed off — Alteration
Filing for HVAC work in conjunction with tenant fit out work. No change in use, egress or occupancy under this application
Q00281014-I1
07/19/2022
Filed — Alteration
Sprinkler and Plumbing work filed in conjunction with Tenant Fit-Out. There is no change in use, egress or occupancy.
Q00286876-P2
07/08/2022
Special inspection requirement — Sprinkler Systems
Ari Kamo
07/08/2022
Special inspection requirement — Post-installed Anchors
Ari Kamo
07/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedVAYA RESTORATION INC08/04/2026
DOB NOWSprinklersSigned-offTRISTATE PLBG SVCS CORP02/22/2022
DOB NOWPlumbingSigned-offTRISTATE PLBG SVCS CORP02/22/2022
DOB NOWMechanical SystemsSigned-offL.F. DRISCOLL COMPANY LLC02/02/2022
DOB NOWBoiler EquipmentSigned-offG.M.A. PLUMBING & HEATING04/20/2021
DOB NOWSprinklersSigned-offTRISTATE PLBG SVCS CORP02/10/2021
DOB NOWPlumbingSigned-offTRISTATE PLBG SVCS CORP02/10/2021
DOB NOWMechanical SystemsSigned-offL.F. DRISCOLL COMPANY LLC02/05/2021
DOB NOWSupported ScaffoldSigned-offVAYA RESTORATION INC11/05/2020
BISSPISSUEDDDS MECHANICAL FPS CORP06/02/2022
BIS—ISSUEDBANTA HOMES CORP04/05/2022
BISEQISSUEDBANTA HOMES CORP04/05/2022
BIS—ISSUEDBANTA HOMES CORP02/07/2022
BISSDISSUEDDDS MECHANICAL FPS CORP01/12/2022
BISOTISSUEDL.F. DRISCOLL COMPANY LLC12/17/2021
BISPLISSUEDD.D.S. MECH PBG&HTG CORP10/28/2021
BISEQISSUEDBANTA HOMES CORP04/22/2021
BIS—ISSUEDBANTA HOMES CORP04/22/2021
BISOTISSUEDL.F. DRISCOLL COMPANY LLC02/25/2021
BISSDISSUEDDDS MECHANICAL FPS CORP01/18/2021
BISPLISSUEDD.D.S. MECH PBG&HTG CORP11/03/2020
BISSPISSUEDDDS MECHANICAL FPS CORP06/03/2020
BIS—ISSUEDBANTA HOMES CORP04/28/2020
BIS—ISSUEDBANTA HOMES CORP04/28/2020
BIS—RE-ISSUEDBANTA HOMES CORP04/02/2020
BIS—ISSUEDBANTA HOMES CORP04/02/2020
BIS—RE-ISSUEDBANTA HOMES CORP04/02/2020
BISEQISSUEDBANTA HOMES CORP04/02/2020
BISSDISSUEDDDS MECHANICAL FPS CORP01/21/2020
BIS—RE-ISSUEDBANTA HOMES CORP09/26/2019
BIS—RE-ISSUEDBANTA HOMES CORP09/26/2019
BIS—RE-ISSUEDBANTA HOMES CORP09/26/2019
BIS—ISSUEDBANTA HOMES CORP06/17/2019
BIS—RE-ISSUEDBANTA HOMES CORP06/17/2019
BIS—RE-ISSUEDBANTA HOMES CORP06/17/2019
BIS—ISSUEDBANTA HOMES CORP06/11/2019
BIS—ISSUEDBANTA HOMES CORP06/11/2019
BIS—RE-ISSUEDBANTA HOMES CORP06/04/2019
BISSDISSUEDDDS MECHANICAL FPS CORP06/03/2019
BIS—ISSUEDBANTA HOMES CORP03/29/2019
+ 19 more permits on file
8 projects · most recent 03/15/2023
General Wiring
FiledStatusContractorScope
03/15/2023CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
06/14/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
06/14/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
03/31/2022CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
02/05/2021CompleteS. J. ELECTRIC INC.General Wiring
11/25/2019CancelledNEWBRIDGE ELECTL CONTNG—
11/25/2019CancelledNEWBRIDGE ELECTL CONTNG—
11/19/2019CompleteRJ RUSSO ELECTRIC CO.—
1 project · most recent 08/04/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/04/2026Permit IssuedVAYA RESTORATION INCSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/09/2022Sprinkler SystemsAri Kamospecial
08/09/2022Fire-Resistant Penetrations and JointsAri Kamospecial
08/09/2022Post-installed AnchorsAri Kamospecial
07/08/2022Sprinkler SystemsAri Kamospecial
07/08/2022Post-installed AnchorsAri Kamospecial
07/08/2022Fire-Resistant Penetrations and JointsAri Kamospecial
05/04/2022HVAC and service water heating system controls Ari Kamoenergy_progress
05/04/2022Heating SystemsAri Kamospecial
05/04/2022HVAC and service water heating equipment Ari Kamoenergy_progress
04/28/2022Heating SystemsAri Kamospecial
04/28/2022HVAC and service water heating system controls Ari Kamoenergy_progress
04/28/2022HVAC and service water heating equipment Ari Kamoenergy_progress
04/05/2022Heating SystemsAri Kamospecial
04/05/2022HVAC and service water heating equipment Ari Kamoenergy_progress
04/05/2022HVAC and service water heating system controls Ari Kamoenergy_progress
03/21/2022HVAC and service water heating equipment Ari Kamoenergy_progress
03/21/2022Post-installed AnchorsAri Kamospecial
03/21/2022Mechanical SystemsAri Kamospecial
03/21/2022Heating SystemsAri Kamospecial
03/21/2022Chimneys and ventsAri Kamospecial
03/21/2022Fire-Resistant Penetrations and JointsAri Kamospecial
03/21/2022FinalAri Kamoprogress
03/21/2022Shutoff dampersAri Kamoenergy_progress
03/21/2022Maintenance informationAri Kamoenergy_progress
03/21/2022HVAC and service water heating system controls Ari Kamoenergy_progress
Latest 25 of 42.
▾Documents — 494 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch - Boiler Equipment4
08/28/2026Q00330083-P1Request digital key ↗
08/28/2026Q00330083-P2Request digital key ↗
08/28/2026Q00330083-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/28/2026Q00286876-I1Request digital key ↗
08/28/2026Q00286876-P2Request digital key ↗
08/15/2026Q00286876-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/28/2026Q00286876-P2Request digital key ↗
08/28/2026Q00286876-P1Request digital key ↗
08/28/2026Q00286876-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
08/27/2026Q00424048-I1Request digital key ↗
08/15/2026Q00424048-P2Request digital key ↗
08/15/2026Q00424048-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026Q00281014-P1Request digital key ↗
08/28/2026Q00281014-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/16/2026Q01435596-I1Request digital key ↗
▸Applications & Permits127
▸BISPLAN / WORK APPROVAL APPLICATION81
11/01/2024440661669Open ↗
10/09/2024420657113Open ↗
10/26/2023420657113Open ↗
Showing 3 of 81 on file for this type
▸BISWORK PERMIT APPLICATION42
04/15/2022420657113Open ↗
06/02/2021420657113Open ↗
06/02/2021420657113Open ↗
Showing 3 of 42 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
06/22/2022440345146Open ↗
06/22/2022440345146Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/12/2020420657113Open ↗
▸Zoning, Tax Lot & Property Records18
▸BISTAX LOT: FINAL LOT NUMBER ISSUED6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISZONING DIAGRAM2
12/13/2022420657113Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
03/09/2020420666988Open ↗
Showing 1 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
03/09/2020420666988Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT IV: CERTIFICATION2
03/09/2020420666988Open ↗
Showing 1 of 2 on file for this type
▸BISZONING EXHIBIT II: CERTIFICATION2
03/09/2020420666988Open ↗
Showing 1 of 2 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
03/09/2020420666988Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026Q00330083-P3Open ↗
09/01/2026Q00330083-P3Open ↗
08/26/2026Q00281014-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026Q00330083-P3Open ↗
08/30/2026Q00286876-P2Open ↗
08/30/2026Q00286876-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00281014-P1Open ↗
08/28/2026Q00281014-I1Open ↗
08/28/2026Q00330083-P1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/12/2021440661669Open ↗
▸Trade Schedules & Equipment39
▸BISSCHEDULE B - PLUMBING18
05/27/2022440363027Open ↗
12/17/2021440363027Open ↗
11/09/2021420657113Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
03/23/2023420657113Open ↗
03/23/2023420657113Open ↗
03/23/2023420657113Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS5
03/23/2023420657113Open ↗
03/23/2023420657113Open ↗
03/23/2023420657113Open ↗
Showing 3 of 5 on file for this type
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL3
06/28/2024440345146Open ↗
01/03/2023421407436Open ↗
Showing 2 of 3 on file for this type
▸BISFIRE ALARM TEST2
07/01/2024420657113Open ↗
07/01/2024420657113Open ↗
▸BISSTANDPIPE SYSTEMS2
04/27/2022440375586Open ↗
04/22/2022440363027Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
11/18/2024420657113Open ↗
▸BISHEATING SYSTEMS1
05/04/2022420657113Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/25/2022421407436Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSTREET TREES SITE PLAN2
07/01/2024420657113Open ↗
Showing 1 of 2 on file for this type
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
03/29/2022420657113Open ↗
03/29/2022420657113Open ↗
02/19/2021440579287Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/18/2024420657113Open ↗
09/12/2022440579287Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
11/19/2024420657113Open ↗
▸BISINTERIOR LIGHTING POWER1
09/12/2022440579287Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00281014-I1Open ↗
▸Inspections & Test Reports55
▸BISTECHNICAL REPORT: RESPONSIBILITY30
04/19/2022440363027Open ↗
04/19/2022420657113Open ↗
04/19/2022420657113Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
07/06/2020420657113Open ↗
06/18/2020420657113Open ↗
Showing 2 of 8 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER5
03/11/2022420657113Open ↗
03/11/2022420657113Open ↗
03/11/2022420657113Open ↗
Showing 3 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
09/23/2022420657113Open ↗
09/08/2022440579287Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
09/23/2022420657113Open ↗
09/08/2022440579287Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
05/04/2022420657113Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONCRETE - CAST-IN-PLACE1
05/05/2022420657113Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/07/2022420657113Open ↗
▸BISCONCRETE - PRECAST1
05/05/2022420657113Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
09/09/2022440579287Open ↗
▸BISMASONRY1
09/23/2022420657113Open ↗
▸Approvals, Objections & Sign-offs38
▸BISSCHEDULE A - OCCUPANCY / USE19
11/16/2022420657113Open ↗
11/14/2022420657113Open ↗
11/09/2022420657113Open ↗
Showing 3 of 19 on file for this type
▸BISSUPERSEDING LETTER7
04/15/2022420657113Open ↗
Showing 1 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
02/17/2023421407490Open ↗
06/02/2021420657113Open ↗
Showing 2 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
01/26/2023421407436Open ↗
10/19/2022440579287Open ↗
08/18/2022440375586Open ↗
Showing 3 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
11/16/2020420657113Open ↗
Showing 1 of 3 on file for this type
▸Cost, Insurance & Ownership13
▸BISPROJECT-SPECIFIC GL INSURANCE8
01/09/2023420657113Open ↗
04/15/2022420657113Open ↗
03/11/2022420657113Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/11/2023421407436Open ↗
09/09/2022440579287Open ↗
▸BISCOST AFFIDAVIT2
01/12/2021440661669Open ↗
Showing 1 of 2 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
07/14/2022420657113Open ↗
▸Filing & Intake Forms62
▸BISADDITIONAL INFORMATION43
11/18/2024420657113Open ↗
10/16/2024420657113Open ↗
11/17/2023420657113Open ↗
Showing 3 of 43 on file for this type
▸BISBOROUGH INTAKE FORM8
07/14/2022420657113Open ↗
04/15/2022420657113Open ↗
07/06/2020420657113Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
01/12/2021440661669Open ↗
Showing 1 of 5 on file for this type
▸Other Documents17
▸BISPLOT DIAGRAM8
03/09/2020420666988Open ↗
Showing 1 of 8 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
04/27/2023421407490Open ↗
03/09/2020420666988Open ↗
Showing 2 of 6 on file for this type
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
04/27/2022420657113Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026Q01435596-I1Open ↗
▸DOB NOWCalculations1
08/16/2026Q01435596-I1Open ↗