← Back
Three families
89 DIVISION AVENUE
BROOKLYN · BIN 3059792
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6Zoning
3,000 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Three families · 1,958 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 2 filings · 20 docs
Cellar1p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOMERY MANAGEMENT907/08/2026
STUCCOFY707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/22/2024$2.5M—Private party → Private party$833/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB208/01/2025
MOHAMMAD AHEAD, PE304/01/2025
S & S ARCHITECTURAL DESIGN,LLC112/12/2024
PRAMODRAY SHAH, P.E.209/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EZFILINGNYCORP403/21/2026
PDG BUILDING CONSULTANTS LLC LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MORELL BUILDERS INCGeneral Contractor207/08/2026
STUCCOFY INCGeneral Contractor207/08/2026
Building Lifecycle
All (103)Filed (8)Permit Issued (4)Signed Off (4)Violation (18)Objection (54)Special Inspection (15)
05/04/2026
Violation issued (HPD, closed)
A
02/18/2026
Signed off — Alteration
install temporary construction fence as per plans filed. no change in use egress or occupancy
B01115371-S1
02/04/2026
Signed off — Alteration
install temporary construction fence as per plans filed. no change in use egress or occupancy
B01115371-I1
12/08/2025
Signed off — Alteration
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use, occupancy, or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with Chapter #33 of the 2022 Building Code.
B01264788-I1
11/19/2025
Signed off — Alteration
B01264807-I1
08/01/2025
Filed — Alteration
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use, occupancy, or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with Chapter #33 of the 2022 Building Code.
B01264788-I1
08/01/2025
Filed — Alteration
B01264807-I1
08/01/2025
Permit issued — Supported Scaffold
B01264807-I1-SF
08/01/2025
Permit issued — Sidewalk Shed
B01264788-I1-SH
08/01/2025
Permit issued — General Construction
B01115371-I1-GC
07/15/2025
Permit issued — Construction Fence
B01115371-S1-FN
06/26/2025
Objection resolved — Addressed
06/09/2025
Violation issued (HPD, closed)
A
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
05/09/2025
Objection resolved — Addressed
05/09/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Fire_Protection
04/01/2025
Filed — Alteration
HEREWITH FILING FOR THE INSTALLATION OF OF 39 SPRINKLER HEADS ON FLOORS BASEMENT THROUGH FLOOR 003. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01155045-S2
04/01/2025
Objection resolved — Addressed
03/20/2025
Objection resolved — Addressed
03/20/2025
Special inspection requirement — Sprinkler Systems
03/19/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/18/2025
Objection resolved — Addressed
03/13/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
02/27/2025
Objection resolved — Addressed
02/25/2025
Objection resolved — Addressed
02/18/2025
Objection resolved — Addressed
01/29/2025
Objection raised — Structural
01/29/2025
Objection raised — Admin
01/29/2025
Objection raised — Structural
01/29/2025
Objection raised — Ventilation
01/29/2025
Objection raised — Zoning
01/29/2025
Objection raised — Zoning
01/29/2025
Objection raised — Admin
01/29/2025
Objection raised — Zoning
01/29/2025
Objection raised — Structural
01/29/2025
Objection raised — Structural
01/29/2025
Objection raised — Structural
01/29/2025
Objection raised — Scope
01/29/2025
Objection raised — Cost
01/28/2025
Objection resolved — Addressed
01/28/2025
Objection resolved — Addressed
01/16/2025
Objection resolved — Addressed
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offSTUCCOFY INC08/01/2025
DOB NOWSidewalk ShedSigned-offSTUCCOFY INC08/01/2025
DOB NOWGeneral ConstructionSigned-offMORELL BUILDERS INC08/01/2025
DOB NOWConstruction FenceSigned-offMORELL BUILDERS INC07/15/2025
1 project · most recent 04/01/2025
FiledStatusContractorScope
04/01/2025——39 heads
1 project · most recent 04/01/2025
Water/Sanitary
FiledStatusContractorScope
04/01/2025——Water/Sanitary
1 project · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025CompleteAMERICAN POWER ELECT CONSGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
03/20/2025Sprinkler Systems—special
12/12/2024Structural Stability – Alterations of existing buildings—special
12/12/2024Final—progress
12/12/2024Fenestration and door U-factor and product ratings—energy_progress
12/12/2024Fenestration air leakage—energy_progress
12/12/2024Lighting in dwelling units—energy_progress
11/01/2024Structural Stability – Alterations of existing buildings—special
11/01/2024Final—progress
11/01/2024Lighting in dwelling units—energy_progress
11/01/2024Fenestration air leakage—energy_progress
11/01/2024Fenestration and door U-factor and product ratings—energy_progress
09/23/2024FinalAndrew Ingaprogress
09/23/2024Fenestration air leakageAndrew Ingaenergy_progress
09/23/2024Fenestration areasAndrew Ingaenergy_progress
09/23/2024Fenestration and door U-factor and product ratingsAndrew Ingaenergy_progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026B01115371-I1Request digital key ↗
08/24/2026B01115371-S1Request digital key ↗
08/23/2026B01135669-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01135669-I1Open ↗
08/13/2026B01155045-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B01135669-I1Open ↗
08/13/2026B01155045-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026B01135669-I1Open ↗
08/21/2026B01264788-I1Open ↗
08/21/2026B01264807-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026B01115371-I1Open ↗
08/31/2026B01115371-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026B01135669-I1Open ↗
08/13/2026B01155045-I1Open ↗
08/13/2026B01155045-S1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents6
▸DOB NOWPlot Diagram2
08/13/2026B01155045-I1Open ↗
08/13/2026B01135669-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01155045-I1Open ↗
08/13/2026B01135669-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01135669-I1Open ↗
08/13/2026B01155045-I1Open ↗