← Back
BuildNYC
Office with commercial, 7-19 stories
9 EAST 38TH STREET
MANHATTAN · BIN 1017229
💬 Discuss this project
1924Year Built
12Stories
O6Building Class
C5-2.5Zoning
59,191 sfGross Floor Area
11Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 9 East 38th Street Realty · 4,630 sf lot · 12.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofB.bro's Broadway Realty LLC5p · 1 filing · 3 docs
BulkheadB.bro's Broadway Realty LLC1p · 1 filing · 3 docs
Floor 9Duke Chiropractic2p · 1 filing · 15 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2HSBC Bank22p · 5 filings · 20 docs
Floor 1HSBC Bank5p · 1 filing · 18 docs
Site & exteriorClearrock Properties LLC7p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
9 East 38th Street Owner9303/21/2026
Clearrock Properties2807/08/2026
9 East 38th Street Realty1103/22/2026
Gray Block1103/21/2026
9 E 38 Street Asso1003/21/2026
920 Broadway Associates603/21/2026
9 East 38th St Associates603/21/2026
16 EAST39TH Street503/21/2026
693 Fifth Owners LLC C/O Savitt Partners407/08/2026
MC Real Estate Partners407/08/2026
9 East 38 St403/21/2026
9 East 36 St Association/403/21/2026
Transwestern103/21/2026
Gva Williams103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants1003/21/2026
Sme Professional Design & Consultan203/21/2026
MP Design and Construction203/21/2026
Desarno Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mario's General ContractingGeneral Contractor403/21/2026
Avarga ContractingScaffold303/21/2026
Donnelly Mechanicalspecialty_contractor203/21/2026
Lemode Plumbing & HeatingPlumbing207/08/2026
Clune Construction CoGeneral Contractor107/08/2026
AP Mechanicalspecialty_contractor107/08/2026
Lemode Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Autographic Co1579206/03/2021
Concessi Engineering540108/26/2020
Becker Engineering633211/22/2019
Obaid Mian849207/16/2019
Building Lifecycle
All (124)Filed (9)Permit Issued (9)Signed Off (8)Facade (FISP) (13)Violation (60)Special Inspection (25)
05/15/2025
Signed off — Alteration
Interior demolition of non load nearing partitions, doors, etc. No change in use, egress or occupancy
M01201892-I1
04/15/2025
Permit issued — General Construction
M01201892-I1-GC
04/10/2025
Filed — Alteration
Interior demolition of non load nearing partitions, doors, etc. No change in use, egress or occupancy
M01201892-I1
03/27/2025
Special inspection requirement — Final
Mike Savarese
06/10/2021
Signed off — Alteration
structural steel reinforcement on the 1st floor to be done for the 2nd floor
M00209408-I1
06/03/2021
Filed — Alteration
structural steel reinforcement on the 1st floor to be done for the 2nd floor
M00209408-P3
06/03/2021
Special inspection requirement — Structural Steel - Welding
asghar Ghodsi
06/03/2021
Special inspection requirement — Structural Steel - High Strength Bolting
asghar Ghodsi
06/03/2021
Special inspection requirement — Sprayed fire-resistant materials
asghar Ghodsi
06/03/2021
Special inspection requirement — Structural Steel - Details
asghar Ghodsi
06/03/2021
Special inspection requirement — Final
ERIC BERLENT
06/03/2021
Special inspection requirement — Structural Steel - Details
asghar Ghodsi
05/24/2021
Special inspection requirement — Sprayed fire-resistant materials
asghar Ghodsi
05/24/2021
Special inspection requirement — Structural Steel - High Strength Bolting
asghar Ghodsi
05/24/2021
Special inspection requirement — Structural Steel - Welding
asghar Ghodsi
05/24/2021
Special inspection requirement — Final
ERIC BERLENT
05/06/2021
Cycle 9 facade report submitted
05/03/2021
Cycle 9 facade report signed — SAFE
03/08/2021
Cycle 9 facade inspection completed
01/25/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS SHOWN ON PLANS. INSTALLATION SHALL COMPLY WITH BSA-351-74-SM, LL-33/91, CHAPTER 33, SECTION 3307 OF 2014 NYC DOB BUILDING CODE,AND TPPN # 9/99. NO CHANGE IN EGRESS, OCCUPANCY OR USE ASSOCIATED WITH THIS PERMIT.
M00319240-I1
10/02/2020
Signed off — Alteration
INSTALLATION OF HVAC UNITS IN ELEVATOR MACHINE ROOM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00360812-I1
08/31/2020
Permit issued — Mechanical Systems
M00360812-I1-MS
08/26/2020
Filed — Alteration
INSTALLATION OF HVAC UNITS IN ELEVATOR MACHINE ROOM. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00360812-I1
08/07/2020
Violation issued (ECB, closed)
Construction
07/13/2020
Signed off — Alteration
sprinkler work on the 2nd floor as indicated on drawings
M00255223-I1
07/13/2020
Signed off — Alteration
mechanical work on the 2nd floor as indicated on drawings
M00255196-I1
06/10/2020
Violation issued (ECB, closed)
Construction
06/10/2020
Violation issued (ECB, closed)
Construction
06/10/2020
Violation issued (ECB, closed)
Construction
03/27/2020
Signed off — Alteration
plumbing work on the 2nd floor as indicated on drawings.
M00255206-I1
03/12/2020
Permit issued — Plumbing
M00255206-I1-PL
03/05/2020
Permit issued — Sidewalk Shed
M00319240-I1-SH
03/03/2020
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS SHOWN ON PLANS. INSTALLATION SHALL COMPLY WITH BSA-351-74-SM, LL-33/91, CHAPTER 33, SECTION 3307 OF 2014 NYC DOB BUILDING CODE,AND TPPN # 9/99. NO CHANGE IN EGRESS, OCCUPANCY OR USE ASSOCIATED WITH THIS PERMIT.
M00319240-I1
02/20/2020
Special inspection requirement — Final
Jerry Pitera
12/12/2019
Permit issued — Sprinklers
M00255223-I1-EW-SP
12/12/2019
Permit issued — Plumbing
M00255206-I1-PL
12/09/2019
Violation issued (ECB, closed)
Construction
12/06/2019
Permit issued — Mechanical Systems
M00255196-I1-MS
11/22/2019
Filed — Alteration
sprinkler work on the 2nd floor as indicated on drawings
M00255223-I1
11/22/2019
Filed — Alteration
mechanical work on the 2nd floor as indicated on drawings
M00255196-I1
11/22/2019
Filed — Alteration
plumbing work on the 2nd floor as indicated on drawings.
M00255206-I1
11/08/2019
Violation issued (ECB, closed)
Unknown
10/29/2019
Special inspection requirement — Sprinkler Systems
John Becker
09/19/2019
Signed off — Alteration
REPLACEMENT OF 8 TON AIR CONDITIONING UNIT ON THE 9TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00186908-I1
09/10/2019
Permit issued — Structural
M00209408-I1-ST
09/04/2019
Filed — Alteration
structural steel reinforcement on the 1st floor to be done for the 2nd floor
M00209408-I1
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/24/2019
Permit issued — Mechanical Systems
M00186908-I1-MS
07/16/2019
Filed — Alteration
REPLACEMENT OF 8 TON AIR CONDITIONING UNIT ON THE 9TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00186908-I1
07/15/2019
Special inspection requirement — Smoke Control Systems Testing
Obaid Mian
06/30/2019
Special inspection requirement — Electrical motors
Obaid Mian
06/30/2019
Special inspection requirement — Shutoff dampers
Obaid Mian
06/30/2019
Special inspection requirement — HVAC and service water heating system controls
Obaid Mian
06/30/2019
Special inspection requirement — Maintenance information
Obaid Mian
06/30/2019
Special inspection requirement — HVAC and service water heating equipment
Obaid Mian
06/30/2019
Special inspection requirement — Duct leakage testing
Obaid Mian
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offClune Construction Co04/15/2025
DOB NOWMechanical SystemsSigned-offAP Mechanical08/31/2020
DOB NOWPlumbingSigned-offLemode Plumbing & Heating03/12/2020
DOB NOWSidewalk ShedSigned-offAvarga Contracting03/05/2020
DOB NOWSprinklersSigned-offLemode Plumbing & Heating12/12/2019
DOB NOWPlumbingSigned-offLemode Plumbing & Heating12/12/2019
DOB NOWMechanical SystemsSigned-offMario's General Contracting12/06/2019
DOB NOWStructuralSigned-offMario's General Contracting09/10/2019
DOB NOWMechanical SystemsSigned-offDonnelly Mechanical07/24/2019
BISPLISSUEDForward Mechanical07/13/2022
BIS—ISSUEDInterstate Interiors07/22/2021
BISPLISSUEDForward Mechanical03/09/2021
BIS—ISSUEDInterstate Interiors02/18/2021
BISEQISSUEDInterstate Interiors02/08/2021
BISOTISSUEDAvarga Contracting05/19/2020
BISSPISSUEDForward Mechanical03/25/2020
BISPLISSUEDForward Mechanical03/11/2020
BISOTISSUEDAvarga Contracting02/12/2020
BISOTISSUEDMario's General Contracting11/25/2019
BISMHISSUEDMario's General Contracting04/17/2019
BISSPISSUEDAqueduct Mechanical10/19/2018
BISPLISSUEDG&B Plumbing & Heating10/19/2018
BISFPISSUEDWilliam Hird & Co07/17/2018
BISOTISSUEDFolor04/25/2018
BISPLISSUEDForward Mechanical03/23/2018
BISSPISSUEDAnesis Services02/12/2018
BISSPISSUEDGo Pro Fire Protection09/07/2017
BISOTISSUEDInterstate Interiors07/20/2017
BISMHISSUEDInterstate Interiors07/20/2017
BISOTISSUEDInterstate Interiors07/20/2017
BISPLISSUEDHydrokinetic Plumbing & Heating I05/23/2017
BISOTISSUEDFolor05/18/2017
BISMHISSUEDFolor05/18/2017
BIS—ISSUEDAlba Services04/10/2017
BISOTISSUEDFolor03/31/2017
BISMHISSUEDFolor03/31/2017
BISOTISSUEDFolor03/31/2017
BISMHRE-ISSUEDInterstate Interiors03/23/2017
BISOTISSUEDInterstate Interiors03/17/2017
BISOTISSUEDInterstate Interiors03/17/2017
+ 19 more permits on file
10 projects · most recent 11/13/2025
General Wiring Lighting
FiledStatusContractorScope
11/13/2025CancelledJer ElectricGeneral Wiring, Lighting
09/24/2021CompleteCentennial Elevator IndustriesGeneral Wiring
06/25/2021CompleteEcny Electrical ContractorsGeneral Wiring
06/14/2021CompleteEcny Electrical ContractorsGeneral Wiring
05/27/2021CompleteEcny Electrical ContractorsGeneral Wiring
06/17/2020CompleteRichard Neu—
02/17/2020CompleteA.L. ElectricalGeneral Wiring
01/09/2020CompleteAll City ElectricalGeneral Wiring
10/14/2018CompleteBrandl ElectricGeneral Wiring
07/01/2018CancelledJam Electrical—
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/27/2025FinalMike Savareseprogress
06/03/2021Structural Steel - Weldingasghar Ghodsispecial
06/03/2021Structural Steel - High Strength Boltingasghar Ghodsispecial
06/03/2021Sprayed fire-resistant materialsasghar Ghodsispecial
06/03/2021Structural Steel - Detailsasghar Ghodsispecial
06/03/2021FinalERIC BERLENTprogress
06/03/2021Structural Steel - Detailsasghar Ghodsispecial
05/24/2021Sprayed fire-resistant materialsasghar Ghodsispecial
05/24/2021Structural Steel - High Strength Boltingasghar Ghodsispecial
05/24/2021Structural Steel - Weldingasghar Ghodsispecial
05/24/2021FinalERIC BERLENTprogress
02/20/2020FinalJerry Piteraprogress
10/29/2019Sprinkler SystemsJohn Beckerspecial
07/15/2019Smoke Control Systems TestingObaid Mianspecial
06/30/2019Electrical motorsObaid Mianenergy_progress
06/30/2019Shutoff dampersObaid Mianenergy_progress
06/30/2019HVAC and service water heating system controls Obaid Mianenergy_progress
06/30/2019Maintenance informationObaid Mianenergy_progress
06/30/2019HVAC and service water heating equipment Obaid Mianenergy_progress
06/30/2019Duct leakage testing Obaid Mianenergy_progress
06/30/2019Energy Code Compliance InspectionsObaid Mianprogress
06/30/2019FinalObaid Mianprogress
06/30/2019Mechanical SystemsObaid Mianspecial
06/30/2019HVAC insulation and sealing Obaid Mianenergy_progress
06/30/2019Permanent certificateObaid Mianenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
HSBC BankBank / Financial branchFloors 1, 2
Project M01201892 Alteration · LOC Issued · 04/10/2025
Project M00255196 Alteration · LOC Issued · 11/22/2019
Project M00255206 Alteration · LOC Issued · 11/22/2019
Project M00255223 Alteration · LOC Issued · 11/22/2019
Project M00209408 Alteration · LOC Issued · 09/04/2019
Duke ChiropracticMedical / HealthcareFloor 9
Project M00186908 Alteration · LOC Issued · 07/16/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 868 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00186908-I1Request digital key ↗
09/05/2026M00255196-I1Request digital key ↗
09/04/2026M00360812-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00209408-I1Request digital key ↗
08/15/2026M00209408-P3Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00255223-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00255206-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00319240-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/24/2026M01201892-I1Request digital key ↗
▸Applications & Permits197
▸BISPLAN / WORK APPROVAL APPLICATION129
02/02/2024121192262Open ↗
01/30/2024121192262Open ↗
09/14/2023122419873Open ↗
Showing 3 of 129 on file for this type
▸BISWORK PERMIT APPLICATION68
02/18/2021121192262Open ↗
02/18/2021121192262Open ↗
02/08/2021121192262Open ↗
Showing 3 of 68 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING DIAGRAM2
04/17/2024121192262Open ↗
04/10/2024121192262Open ↗
▸Seals & Professional Certifications191
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION97
05/08/2020122394845Open ↗
02/25/2020122394845Open ↗
11/25/2019123789597Open ↗
Showing 3 of 97 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT28
11/22/2019123789597Open ↗
Showing 1 of 28 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST24
11/22/2019123789597Open ↗
Showing 1 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
10/04/2026M00319240-I1Open ↗
08/28/2026M00186908-I1Open ↗
08/28/2026M00186908-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/21/2026M00255223-I1Open ↗
08/28/2026M00186908-I1Open ↗
08/28/2026M00186908-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/05/2026M00209408-I1Open ↗
09/04/2026M00360812-I1Open ↗
08/13/2026M00209408-P3Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment69
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
03/30/2020122394845Open ↗
03/12/2020122394845Open ↗
Showing 2 of 26 on file for this type
▸BISEQUIPMENT USE PERMITS11
06/21/2022121947858Open ↗
09/17/2019123837410Open ↗
Showing 2 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA11
02/22/2023122910519Open ↗
09/18/2020123072628Open ↗
12/17/2019122381412Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT9
06/21/2022121947858Open ↗
11/15/2021121947858Open ↗
11/15/2021121947858Open ↗
Showing 3 of 9 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING3
01/04/2022122394854Open ↗
10/26/2020122394854Open ↗
10/23/2020122394854Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes1
10/07/2019123886072Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos42
▸BISASBESTOS: CERTIFICATION (DEP ACP5)27
11/22/2019123789597Open ↗
10/07/2019123886072Open ↗
Showing 2 of 27 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/05/2026M00209408-I1Open ↗
09/04/2026M00360812-I1Open ↗
08/13/2026M00255206-I1Open ↗
Showing 3 of 8 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance78
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS38
11/25/2019123789597Open ↗
11/22/2019123789597Open ↗
10/07/2019123886072Open ↗
Showing 3 of 38 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
11/15/2021121947858Open ↗
09/24/2021121947858Open ↗
10/29/2020123886072Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
12/20/2021121192262Open ↗
12/20/2021122245766Open ↗
11/08/2021121947858Open ↗
Showing 3 of 11 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS5
03/08/2022122394854Open ↗
03/08/2022122394854Open ↗
12/20/2021121192262Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
01/24/2024121192262Open ↗
03/08/2022122394854Open ↗
02/22/2022122245766Open ↗
▸BISLIGHTING CONTROLS2
12/20/2021121192262Open ↗
12/20/2021122245766Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/20/2021121192262Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* HVAC INSULATION AND SEALING1
03/08/2022122394854Open ↗
▸BISINTERIOR LIGHTING POWER1
12/20/2021121192262Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY15
12/20/2021121192262Open ↗
12/20/2021121192262Open ↗
12/20/2021122245766Open ↗
Showing 3 of 15 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
12/20/2021121192262Open ↗
12/20/2021122245766Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
12/20/2021121192262Open ↗
12/20/2021122245766Open ↗
▸BIS* EXIT SIGNS2
12/20/2021121192262Open ↗
12/20/2021122245766Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
12/20/2021121192262Open ↗
12/20/2021122245766Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/20/2021122245766Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/20/2021122245766Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/20/2021122245766Open ↗
▸Approvals, Objections & Sign-offs56
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST39
02/24/2023122910519Open ↗
11/03/2022122394854Open ↗
03/15/2022122245766Open ↗
Showing 3 of 39 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
09/14/2023122419873Open ↗
Showing 1 of 4 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFINAL2
03/08/2022122394854Open ↗
12/20/2021122245766Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
09/14/2023122419873Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
12/24/2020121192262Open ↗
▸Cost, Insurance & Ownership82
▸BISCOST AFFIDAVIT79
11/02/2022122394854Open ↗
10/28/2022122394854Open ↗
11/15/2021121947858Open ↗
Showing 3 of 79 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
02/23/2023122910519Open ↗
11/02/2022122394854Open ↗
02/22/2022122245766Open ↗
▸Filing & Intake Forms99
▸BISEFILING COVER SHEET44
11/22/2019123789597Open ↗
10/07/2019123886072Open ↗
Showing 2 of 44 on file for this type
▸BISBOROUGH INTAKE FORM29
06/10/2020102796994Open ↗
06/10/2020103202589Open ↗
06/10/2020103755884Open ↗
Showing 3 of 29 on file for this type
▸BISADDITIONAL INFORMATION23
01/07/2021121192262Open ↗
10/28/2020122394854Open ↗
Showing 2 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWStructural Peer Review Report2
09/05/2026M00209408-I1Open ↗
08/13/2026M00209408-P3Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/20/2021121192262Open ↗
▸BISCHIMNEYS1
12/20/2021121192262Open ↗