← Back
Predominantly retail with other uses
9 EAST 53 STREET
MANHATTAN · Midtown-Times Square · BIN 1035726
💬 Discuss this project
1920Year Built
5Stories
K4Building Class
C5-2.5Zoning
9,440 sfGross Floor Area
4Units
8 Open Violations 7 unresolved · 1 paperwork only ▸
Predominantly retail with other uses · Owner of record: E AND M LLC · 2,008 sf lot · 4.7 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 2 filings · 11 docs
Floor 24p · 3 filings · 20 docs
Floor 119p · 1 filing · 15 docs
Cellar25p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
521 MAD1007/09/2026
PASTA CORNER1207/08/2026
THE OWNER OF203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VINCENT J. LIOTTA P.E.107/01/2026
A SAXON DESIGN GROUP203/25/2024
NMI ARCHITECTURE, PLLC706/02/2023
BODNAR ARCHITECT PC303/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.203/21/2026
NMI ARCHITECTURE PLLC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VIR CONSTRUCTION INCGeneral Contractor603/21/2026
LITHOS CONSTR SOLUTI INCGeneral Contractor203/21/2026
WITTMAN, ROBERTElectrical103/21/2026
VIP FIRE SPRINKLER INCFire Protection107/08/2026
COMCELL CONSTRUCTION CORP.General Contractor107/08/2026
ECONO AIR HEATING/COOLINGGeneral Contractor107/09/2026
AQUA PLUMBING & HTNG CORPPlumbing107/08/2026
CHANG, VICTORElectrical103/21/2026
WATER DYNAMIC P & H CORPPlumbing107/08/2026
TREVOR DUNWELLElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974107/01/2026
R MARSAC CONSULTING LLC329203/25/2024
NMI ARCHITECTURE, PLLC6825606/02/2023
ROBERT HANNA5589306/02/2023
ALAN MARGOLIN & ASSOC423204/19/2023
JUN YAN, PE7170111/09/2022
Building Lifecycle
All (93)Filed (13)Permit Issued (8)Signed Off (4)Violation (26)Inspection (10)Objection (2)Special Inspection (30)
07/30/2026
Signed off — Alteration
INSTALLATION OF TWO SPLIT SYSTEM CONDENSERS ON THE ROOF, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01399241-I1
07/07/2026
Permit issued — Mechanical Systems
M01399241-I1-MS
07/01/2026
Filed — Alteration
INSTALLATION OF TWO SPLIT SYSTEM CONDENSERS ON THE ROOF, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01399241-I1
05/07/2026
Special inspection requirement — Mechanical Systems
Vincent Liotta
05/07/2026
Special inspection requirement — Maintenance information
Vincent Liotta
05/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
05/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
05/07/2026
Special inspection requirement — Energy Code Compliance Inspections
Vincent Liotta
05/07/2026
Special inspection requirement — Final
Vincent Liotta
07/03/2024
Signed off — Alteration
T-Mobile: Relocation of existing antenna sectors, GPS antenna and equipment cabinets with installation of kickbacks & cabinets and removal of antennas & HVAC unit on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy
M00895377-I1
04/11/2024
Objection resolved — Addressed
03/29/2024
Objection raised — Scope
03/25/2024
Filed — Alteration
T-Mobile: Relocation of existing antenna sectors, GPS antenna and equipment cabinets with installation of kickbacks & cabinets and removal of antennas & HVAC unit on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy
M00895377-P1
09/14/2023
Permit issued — Antenna
M00895377-I1-AN
08/14/2023
Filed — Alteration
T-Mobile: Relocation of existing antenna sectors, GPS antenna and equipment cabinets with installation of kickbacks & cabinets and removal of antennas & HVAC unit on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy
M00895377-I1
06/13/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/12/2023
Special inspection requirement — Final
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — Shutoff dampers
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — Maintenance information
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — Interior lighting power
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
06/12/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT HANNA
06/12/2023
Special inspection requirement — Mechanical Systems
NASHAT IBRAHIM
06/02/2023
Filed — Alteration
THIS APPLICATION IS FILED FOR COSMETIC WORK TO THE EXISTING EATING AND DRINKING FACILITY AT THE 1ST FL, NEW KITCHEN EQUIPMENT, NEW ADA BATHROOM AT 1ST FL, NEW KITCHEN HOOD, AND ADDITION A/C UNIT, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00770823-P3
05/30/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
NASHAT IBRAHIM
05/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
05/30/2023
Special inspection requirement — Mechanical Systems
NASHAT IBRAHIM
05/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT HANNA
05/30/2023
Special inspection requirement — Energy Code Compliance Inspections
NASHAT IBRAHIM
05/30/2023
Special inspection requirement — Final
NASHAT IBRAHIM
05/30/2023
Special inspection requirement — Fire-Resistance Rated Construction
NASHAT IBRAHIM
05/30/2023
Special inspection requirement — Maintenance information
NASHAT IBRAHIM
05/30/2023
Special inspection requirement — Insulation placement and R values
NASHAT IBRAHIM
05/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
NASHAT IBRAHIM
05/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NASHAT IBRAHIM
04/19/2023
Filed — Alteration
APPLICATION IS FILED FOR NEW PLUMBING FIXTURES FOR THE KITCHEN,NEW ACCESSIBLE BATHROOM AT 1ST. FLOOR, MODIFY SOME SPRINKLER HEADS AND ADD NEW SPRINKLER HEADS < 20,IN CONJUNCTION WITH ALT-2 APPLICATION JOB #M00770823-I1. NO CHANGE OF USE, EGRESS OR OCCUPAN
M00784030-P5
04/04/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/30/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/23/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/03/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/06/2023
Permit issued — Plumbing
M00784030-I1-EW-SP
02/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2023
Permit issued — Plumbing
M00784030-I1-PL
01/19/2023
Filed — Alteration
THIS APPLICATION IS FILED FOR COSMETIC WORK TO THE EXISTING EATING AND DRINKING FACILITY AT THE 1ST FL, NEW KITCHEN EQUIPMENT, NEW ADA BATHROOM AT 1ST FL, NEW KITCHEN HOOD, AND ADDITION A/C UNIT, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00770823-P2
12/20/2022
Permit issued — Mechanical Systems
M00770823-I1-GC-CX
11/09/2022
Filed — Alteration
APPLICATION IS FILED FOR NEW PLUMBING FIXTURES FOR THE KITCHEN,NEW ACCESSIBLE BATHROOM AT 1ST. FLOOR, MODIFY SOME SPRINKLER HEADS AND ADD NEW SPRINKLER HEADS < 20,IN CONJUNCTION WITH ALT-2 APPLICATION JOB #M00770823-I1. NO CHANGE OF USE, EGRESS OR OCCUPAN
M00784030-P1
11/09/2022
Filed — Alteration
THIS APPLICATION IS FILED FOR COSMETIC WORK TO THE EXISTING EATING AND DRINKING FACILITY AT THE 1ST FL, NEW KITCHEN EQUIPMENT, NEW ADA BATHROOM AT 1ST FL, NEW KITCHEN HOOD, AND ADDITION A/C UNIT, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00770823-P1
10/29/2022
Permit issued — General Construction
M00770823-I1-GC-CX
09/01/2022
Filed — Alteration
APPLICATION IS FILED FOR NEW PLUMBING FIXTURES FOR THE KITCHEN,NEW ACCESSIBLE BATHROOM AT 1ST. FLOOR, MODIFY SOME SPRINKLER HEADS AND ADD NEW SPRINKLER HEADS < 20,IN CONJUNCTION WITH ALT-2 APPLICATION JOB #M00770823-I1. NO CHANGE OF USE, EGRESS OR OCCUPAN
M00784030-I1
08/16/2022
Filed — Alteration
THIS APPLICATION IS FILED FOR COSMETIC WORK TO THE EXISTING EATING AND DRINKING FACILITY AT THE 1ST FL, NEW KITCHEN EQUIPMENT, NEW ADA BATHROOM AT 1ST FL, NEW KITCHEN HOOD, AND ADDITION A/C UNIT, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M00770823-I1
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offECONO AIR HEATING/COOLING07/07/2026
DOB NOWAntennaSigned-offCOMCELL CONSTRUCTION CORP09/14/2023
DOB NOWPlumbingPermit IssuedVIP FIRE SPRINKLER INC02/06/2023
DOB NOWPlumbingPermit IssuedAQUA PLUMBING & HTNG CORP01/24/2023
DOB NOWMechanical SystemsSigned-offVIR CONSTRUCTION INC12/20/2022
DOB NOWGeneral ConstructionSigned-offVIR CONSTRUCTION INC10/29/2022
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP04/26/2021
DOB NOWGeneral ConstructionSigned-offLITHOS CONSTR SOLUTI02/12/2021
BISOTISSUEDSQUAN CONSTRUCTION SERVIC06/28/2017
BISOTISSUEDMERINO & SONS CONSTR INC01/06/2016
BISSPISSUEDALLSTATE SPRINKLER LLC06/20/2013
BISOTISSUEDHIGHLAND CONTR ASSOC02/06/2002
BISOTRE-ISSUEDARETE DEVE, INC05/01/2001
BISOTISSUEDAPPLIED ELECTIRC CORP04/27/2000
BISPLISSUEDACE CONTRACTING CORP.07/31/1997
BIS—ISSUEDPAPPAS CONSTRUCION CO INC06/23/1997
BISPLISSUEDACE CONTRACTING INC06/23/1997
BISPLISSUEDACE CONTRACTING CORPORATION05/27/1997
BISFPISSUEDIDEAL FIRE CONTROL05/14/1997
BISOTISSUEDPAPPSAS CONSTRUCTION CO INC04/28/1997
BISMHISSUEDPAPPAS CONSTRUCTION CO INC04/28/1997
BISOTISSUEDPAPPPAS CONST. INC04/28/1997
BISEQISSUEDPAPPAS CONSTRUCTION CO INC04/28/1997
BISEQISSUEDPAPPSAS CONSTRUCTION CO INC04/28/1997
BISPLISSUEDACE CONTRACTING CORPORATION04/09/1997
BISSPISSUEDHEADS UP FIRE SPRINKLER04/09/1997
BISOTISSUEDPAPPPAS CONST. INC04/04/1997
BISEQISSUEDPAPPAS CONSTRUCTION CO INC03/05/1997
BISOTISSUEDPAPPAS CONSTRUCTION CO INC03/05/1997
BISEQISSUEDPAPPSAS CONSTRUCTION CO INC01/22/1997
BISOTISSUEDPAPPSAS CONSTRUCTION CO INC01/22/1997
BISOTISSUEDALLEN TOWER CORPORATIONN CORP07/31/1996
BISFPISSUEDACTIVE FIRE EXTINGUISHER CO.,INC05/08/1992
2 projects · most recent 07/01/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/01/2026Signed-offECONO AIR HEATING/COOLINGHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MODEL NTXMSH48A182AA 48,000 BTU · Condensing Unit ×2
06/02/2023Signed-offVIR CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUMY-P36NKMU3 40,000 BTU · Vrf Outdoor ×10
PVFY-P36NAMU-E1 40,000 BTU · Vrf Indoor ×4
Ventilation
Greenheck DGX-P112-H12-MF 2,363 CFM · Makeup Air ×7
USF-18 2,850 CFM · Kitchen Exhaust ×7
1 project · most recent 04/19/2023
FiledStatusContractorScope
04/19/2023Permit IssuedVIP FIRE SPRINKLER INC16 heads
1 project · most recent 04/19/2023
Gas Water/Sanitary
FiledStatusContractorScope
04/19/2023Permit IssuedAQUA PLUMBING & HTNG CORPGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/13/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/30/2023Fail-Final General Construction Non-Directive 14FailView ↗
04/04/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
05/07/2026Mechanical SystemsVincent Liottaspecial
05/07/2026Maintenance informationVincent Liottaenergy_progress
05/07/2026HVAC-R and service water heating equipmentVincent Liottaenergy_progress
05/07/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
05/07/2026Energy Code Compliance InspectionsVincent Liottaprogress
05/07/2026FinalVincent Liottaprogress
06/12/2023FinalNASHAT IBRAHIMprogress
06/12/2023Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
06/12/2023Fire-Resistance Rated ConstructionNASHAT IBRAHIMprogress
06/12/2023HVAC-R and service water heating system controlsNASHAT IBRAHIMenergy_progress
06/12/2023Shutoff dampersNASHAT IBRAHIMenergy_progress
06/12/2023HVAC-R and service water piping design and insulationNASHAT IBRAHIMenergy_progress
06/12/2023HVAC-R and service water heating equipmentNASHAT IBRAHIMenergy_progress
06/12/2023Maintenance informationNASHAT IBRAHIMenergy_progress
06/12/2023Insulation placement and R valuesNASHAT IBRAHIMenergy_progress
06/12/2023Interior lighting powerNASHAT IBRAHIMenergy_progress
06/12/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
06/12/2023Structural Stability – Alterations of existing buildingsROBERT HANNAspecial
06/12/2023Mechanical SystemsNASHAT IBRAHIMspecial
05/30/2023HVAC-R and service water heating system controlsNASHAT IBRAHIMenergy_progress
05/30/2023Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
05/30/2023Mechanical SystemsNASHAT IBRAHIMspecial
05/30/2023Structural Stability – Alterations of existing buildingsROBERT HANNAspecial
05/30/2023Energy Code Compliance InspectionsNASHAT IBRAHIMprogress
05/30/2023FinalNASHAT IBRAHIMprogress
Latest 25 of 57.
▾Documents — 179 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch10
08/31/2026M00784030-P1Request digital key ↗
08/31/2026M00784030-P5Request digital key ↗
08/31/2026M00784030-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00457634-I1Request digital key ↗
09/04/2026M00457634-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00464456-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION8
05/06/2020140895716Open ↗
04/11/2017140382119Open ↗
11/27/2015122552291Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
05/25/2021123907996Open ↗
06/28/2017140382119Open ↗
01/19/2016122552291Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY4
04/29/2013121064025Open ↗
02/19/2013121064025Open ↗
05/03/2012121064025Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
02/13/2013121064025Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature40
08/31/2026M00784030-I1Open ↗
08/30/2026M00770823-P2Open ↗
08/30/2026M00770823-P2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
08/31/2026M00784030-I1Open ↗
08/31/2026M00784030-I1Open ↗
08/30/2026M00770823-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/04/2026M00464456-I1Open ↗
08/31/2026M00784030-P1Open ↗
08/31/2026M00784030-P5Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/03/2017122552291Open ↗
01/07/2016122552291Open ↗
11/27/2015122552291Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
05/06/2020140895716Open ↗
10/28/2015140382119Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/27/2012121517518Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/27/2012121517518Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
11/27/2012121517518Open ↗
04/26/2012121055534Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/10/2017140382119Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
05/05/2021123907996Open ↗
04/26/2012121055534Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/04/2026M00464456-I1Open ↗
08/31/2026M00784030-P1Open ↗
08/31/2026M00784030-P5Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
05/06/2020140895716Open ↗
11/27/2015122552291Open ↗
12/05/2012121055534Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/05/2021123907996Open ↗
05/06/2020140895716Open ↗
10/28/2015140382119Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/03/2017122552291Open ↗
11/27/2015122552291Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/03/2017122552291Open ↗
▸BISTECHNICAL REPORT: ENERGY1
04/26/2012121055534Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
05/05/2021123907996Open ↗
05/06/2020140895716Open ↗
06/19/2017140382119Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS3
11/27/2012121517518Open ↗
05/03/2012121064025Open ↗
04/26/2012121055534Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
01/25/2013121055534Open ↗
10/15/2012121064025Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
04/23/2021123907996Open ↗
04/26/2012121055534Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/03/2017122552291Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
06/02/2020140895716Open ↗
05/06/2020140895716Open ↗
05/10/2017140382119Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION6
05/05/2021123907996Open ↗
06/15/2020140895716Open ↗
06/02/2020140895716Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
02/25/2021123907996Open ↗
11/27/2015122552291Open ↗
11/27/2012121517518Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/06/2020140895716Open ↗
10/28/2015140382119Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM3
05/05/2021123907996Open ↗
04/23/2021123907996Open ↗
04/26/2012121055534Open ↗