Two family brick
9 EAST 81 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1046662
💬 Discuss this project
1879Year Built
5Stories
B1Building Class
R8BZoning
4,860 sfGross Floor Area
2Units
0 Open Violations
Two family brick · Owner of record: PRG REALTY, LLC · 2,026 sf lot · 2.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction43p · 1 filing · 20 docs
Floor 5Under Construction57p · 2 filings · 20 docs
Floor 4Under Construction55p · 2 filings · 20 docs
Floor 3Under Construction56p · 2 filings · 20 docs
Floor 2Under Construction53p · 2 filings · 20 docs
Floor 1Under Construction52p · 2 filings · 20 docs
CellarUnder Construction58p · 2 filings · 20 docs
Site & exteriorUnder Construction12p · 2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY407/08/2026
INTERSYSTEM CONSTRUCTION108/04/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/08/2021$13.2M—Private party → PGG HOLDINGS LP$2,711/sf building
12/15/2014$22.0M—Private party → Private party$4,527/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC107/20/2026
SARO GUMUSYAN ARCHITECTURE803/25/2026
ASHRAF CORP101/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THINK CONSTRUCTION LLCGeneral Contractor909/30/2026
DYNAMIC BLUE WATER MECHPlumbing209/09/2026
ZAPAS CONSTRUCTION CORPFire Protection107/08/2026
NORBERT GERSHKOVICHElectrical103/21/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
INTERSYSTEM CONSTRUCTIONGeneral Contractor108/04/2026
ZIN ELECTRICAL, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137703/25/2026
SARO GUMUSYAN ARCHITECT6437308/23/2024
Building Lifecycle
All (66)Filed (9)Permit Issued (13)Signed Off (2)Violation (7)Inspection (5)Special Inspection (30)
09/29/2026
Permit issued — General Construction
M01041163-I1-GC
09/08/2026
Permit issued — Plumbing
M01041163-S3-PL
08/03/2026
Permit issued — Supported Scaffold
M01430211-I1-SF
07/20/2026
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01430211-I1
04/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
04/05/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
04/05/2026
Special inspection requirement — Sprinkler Systems
SHAHIN BADALY
03/25/2026
Filed — Alteration
ALTERATION TO EXISTING PLUMBING SYSTEM AND NEW FIRE SPRINKLER SYSTEM.
M01041163-P3
03/24/2026
Permit issued — Foundation
M01041163-S1-GC-CX
03/20/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
03/20/2026
Special inspection requirement — Sprinkler Systems
SHAHIN BADALY
03/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
12/05/2025
Permit issued — Sprinklers
M01041163-S3-EW-SP
12/04/2025
Permit issued — Mechanical Systems
M01041163-S2-MS
12/03/2025
Violation issued (ECB, closed)
Construction
09/29/2025
Permit issued — General Construction
M01041163-I1-GC
09/29/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/29/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2025
Signed off — Alteration
M00972800-I1
07/08/2025
Permit issued — Sprinklers
M01041163-S3-PL
05/05/2025
Signed off — Alteration
M01163841-I1
02/20/2025
Filed — Alteration
ALTERATION TO EXISTING PLUMBING SYSTEM AND NEW FIRE SPRINKLER SYSTEM.
M01041163-S3
02/19/2025
Filed — Alteration
ALTERATION TO EXISTING PLUMBING SYSTEM AND NEW FIRE SPRINKLER SYSTEM.
M01041163-S2
02/12/2025
Filed — Alteration
ALTERATION TO EXISTING PLUMBING SYSTEM AND NEW FIRE SPRINKLER SYSTEM.
M01041163-P1
02/11/2025
Special inspection requirement — Structural Steel - High Strength Bolting
SHAHIN BADALY
02/11/2025
Special inspection requirement — Structural Steel - Welding
SHAHIN BADALY
02/11/2025
Special inspection requirement — Footing and Foundation
SHAHIN BADALY
02/11/2025
Special inspection requirement — Final
MOHAMMAD BADALY
02/11/2025
Special inspection requirement — Concrete - Cast-In-Place
SHAHIN BADALY
02/11/2025
Special inspection requirement — Masonry
SHAHIN BADALY
02/11/2025
Special inspection requirement — Structural Cold-Formed Steel
SHAHIN BADALY
02/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SHAHIN BADALY
02/11/2025
Special inspection requirement — Structural Steel - Details
SHAHIN BADALY
01/22/2025
Permit issued — Foundation
M01041163-S1-GC-CX
01/08/2025
Permit issued — Supported Scaffold
M01163841-I1-SF
01/07/2025
Filed — Alteration
M01163841-I1
12/31/2024
Permit issued — General Construction
M01041163-I1-GC
09/25/2024
Filed — Alteration
ALTERATION TO EXISTING PLUMBING SYSTEM AND NEW FIRE SPRINKLER SYSTEM.
M01041163-S1
09/16/2024
Special inspection requirement — Shutoff dampers
SHAHIN BADALY
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
09/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
09/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
09/16/2024
Special inspection requirement — Duct leakage testing, insulation and design
SHAHIN BADALY
09/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
09/16/2024
Special inspection requirement — Maintenance information
SHAHIN BADALY
09/11/2024
Permit issued — General Construction
M00972800-I1-GC
08/23/2024
Filed — Alteration
ALTERATION TO EXISTING PLUMBING SYSTEM AND NEW FIRE SPRINKLER SYSTEM.
M01041163-I1
08/23/2024
Special inspection requirement — Insulation placement and R values
Saro Gumusyan
08/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Saro Gumusyan
08/23/2024
Special inspection requirement — Lighting in dwelling units
Saro Gumusyan
08/12/2024
Special inspection requirement — Mechanical Systems
SHAHIN BADALY
08/12/2024
Special inspection requirement — Final
MOHAMMAD BADALY
04/24/2024
Special inspection requirement — Final
Saro Gumusyan
04/24/2024
Special inspection requirement — Fire-Resistance Rated Construction
Saro Gumusyan
04/04/2024
Permit issued — General Construction
M00972800-I1-GC
12/29/2023
Filed — Alteration
M00972800-I1
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTHINK CONSTRUCTION LLC09/29/2026
DOB NOWPlumbingPermit IssuedDYNAMIC BLUE WATER MECH09/08/2026
DOB NOWSupported ScaffoldPermit IssuedINTERSYSTEM CONSTRUCTION08/03/2026
DOB NOWFoundationPermit IssuedTHINK CONSTRUCTION LLC03/24/2026
DOB NOWSprinklersPermit IssuedZAPAS CONSTRUCTION CORP12/05/2025
DOB NOWMechanical SystemsPermit IssuedTHINK CONSTRUCTION LLC12/04/2025
DOB NOWGeneral ConstructionPermit IssuedTHINK CONSTRUCTION LLC09/29/2025
DOB NOWSprinklersPermit IssuedSUPER PLUMBERS CORP07/08/2025
DOB NOWFoundationPermit IssuedTHINK CONSTRUCTION LLC01/22/2025
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP01/08/2025
DOB NOWGeneral ConstructionPermit IssuedTHINK CONSTRUCTION LLC12/31/2024
DOB NOWGeneral ConstructionSigned-offTHINK CONSTRUCTION LLC09/11/2024
DOB NOWGeneral ConstructionSigned-offTHINK CONSTRUCTION LLC04/04/2024
BISOTISSUEDSTRASSER & ASSOCIATES INC03/19/2012
BISPLISSUEDPETER MC CANN PLBG & HTG08/09/2011
BISOTISSUEDSTRASSER & ASSOCIATES INC08/08/2011
BISPLISSUEDDOVAL PLBG & HTG CORP04/14/1998
BISEQISSUEDSTRASSER & ASSOCIATES,INC.11/24/1997
BISEQISSUEDSTRASSER & ASSOCIATES,INC.09/22/1997
BISOTISSUEDSTRASSER & ASSOCIATES,INC.06/16/1997
BISPLISSUEDEVERGREEN MECHANICAL CORP06/03/1991
BISOTISSUEDDELLMAN CONSTRUCTION CORP05/02/1991
1 project · most recent 03/25/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026Permit IssuedTHINK CONSTRUCTION LLCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ2-U1 54,000 BTU · Heat Pump Outdoor ×3
PEAD-A09AA9 9,000 BTU · Vrf Indoor ×3
PEAD-A15AA9 15,000 BTU · Vrf Indoor ×3
PEAD-A12AA9 12,000 BTU · Vrf Indoor ×2
PEAD-A18AA9 18,000 BTU · Vrf Indoor ×2
PEAD-24AA9 24,000 BTU ×1
Heating
Fantech MAUH10 10 kW · Makeup Air ×1
Ventilation
Fantech CVS275A 275 CFM · Exhaust Fan ×4
FG4 120 CFM · Exhaust Fan ×4
CVS400A 400 CFM · Exhaust Fan ×1
FIT 120E 120 CFM · Erv ×1
MUAS10 1,000 CFM · Makeup Air ×1
Greenheck CUBE-100-4119GQD 1,000 CFM · Exhaust Fan ×1
G-060-DGE117XQD 100 CFM · Exhaust Fan ×1
Daikin VAM300GVJU 300 CFM · Erv ×1
1 project · most recent 03/25/2026
FiledStatusContractorScope
03/25/2026Permit IssuedZAPAS CONSTRUCTION CORP76 heads
1 project · most recent 03/25/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/25/2026Permit IssuedDYNAMIC BLUE WATER MECHGas, Storm, Water/Sanitary
3 projects · most recent 08/13/2026
General Wiring
FiledStatusContractorScope
08/13/2026Permit IssuedEINSTEIN ELEC'L CORPGeneral Wiring
05/25/2025Permit IssuedZIN ELECTRICAL, INCGeneral Wiring
09/17/2024Permit IssuedFRACCAVENTO ELEC. CORP—
1 project · most recent 07/20/2026
Scaffold
FiledStatusContractorScope
07/20/2026Permit IssuedINTERSYSTEM CONSTRUCTIONScaffold
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/29/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
04/05/2026Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
04/05/2026Energy Code Compliance InspectionsSHAHIN BADALYprogress
04/05/2026Sprinkler SystemsSHAHIN BADALYspecial
03/20/2026Energy Code Compliance InspectionsSHAHIN BADALYprogress
03/20/2026Sprinkler SystemsSHAHIN BADALYspecial
03/20/2026Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
02/11/2025Structural Steel - High Strength BoltingSHAHIN BADALYspecial
02/11/2025Structural Steel - WeldingSHAHIN BADALYspecial
02/11/2025Footing and FoundationSHAHIN BADALYprogress
02/11/2025FinalMOHAMMAD BADALYprogress
02/11/2025Concrete - Cast-In-PlaceSHAHIN BADALYspecial
02/11/2025MasonrySHAHIN BADALYspecial
02/11/2025Structural Cold-Formed SteelSHAHIN BADALYspecial
02/11/2025Structural Stability – Alterations of existing buildingsSHAHIN BADALYspecial
02/11/2025Structural Steel - DetailsSHAHIN BADALYspecial
09/16/2024Shutoff dampersSHAHIN BADALYenergy_progress
09/16/2024Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
09/16/2024Energy Code Compliance InspectionsSHAHIN BADALYprogress
09/16/2024HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
09/16/2024HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
09/16/2024Duct leakage testing, insulation and designSHAHIN BADALYenergy_progress
09/16/2024HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
09/16/2024Maintenance informationSHAHIN BADALYenergy_progress
08/23/2024Insulation placement and R valuesSaro Gumusyanenergy_progress
08/23/2024Fenestration and door U-factor and product ratingsSaro Gumusyanenergy_progress
Latest 25 of 32.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026M00972800-I1Request digital key ↗
08/25/2026M01163841-I1Request digital key ↗
08/18/2026M01041163-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits14
▸DOB NOWLPC Approval/Permit8
08/18/2026M01041163-P3Open ↗
08/13/2026M01041163-S3Open ↗
08/13/2026M01041163-S1Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
09/28/2011120821815Open ↗
09/13/2011120702506Open ↗
09/09/2011120702506Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
03/22/2012120821815Open ↗
08/15/2011120702506Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026M01041163-P2Open ↗
08/13/2026M01041163-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
09/05/2026M01041163-P3Open ↗
08/31/2026M01041163-I1Open ↗
08/31/2026M01041163-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026M00972800-I1Open ↗
08/25/2026M01163841-I1Open ↗
08/18/2026M01041163-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/05/2026M01041163-P3Open ↗
08/31/2026M01041163-I1Open ↗
08/31/2026M01041163-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/26/2011120702506Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
09/13/2011120702506Open ↗
09/09/2011120702506Open ↗
05/26/2011120702506Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026M01041163-I1Open ↗
08/13/2026M01041163-P2Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
02/23/2012120702506Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/28/2026M00972800-I1Open ↗
08/18/2026M01041163-S1Open ↗
08/18/2026M01041163-P3Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/28/2011120821815Open ↗
05/26/2011120702506Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/18/2026M01041163-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY3
07/25/2011120702506Open ↗
07/25/2011120702506Open ↗
05/26/2011120702506Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
09/28/2011120821815Open ↗
05/26/2011120702506Open ↗
▸BISLANDMARKS APPROVAL1
08/10/2011120702506Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/28/2011120821815Open ↗
05/26/2011120702506Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
10/19/2011120702506Open ↗
09/13/2011120702506Open ↗
09/09/2011120702506Open ↗
▸BISEFILING COVER SHEET2
09/28/2011120821815Open ↗
05/26/2011120702506Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026M01041163-P2Open ↗
08/13/2026M01041163-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M01041163-I1Open ↗
08/13/2026M01041163-P2Open ↗
▸DOB NOWPlot Diagram2
08/13/2026M01041163-P2Open ↗
08/13/2026M01041163-I1Open ↗