9 METROTECH CENTER
BROOKLYN · BIN 3058187
💬 Discuss this project
1996Year Built
8Stories
O3Building Class
C6-1AZoning
407,400 sfGross Floor Area
1Units
LL97 Covered3 Active Violations 2 unresolved · 1 paperwork only 4 likely answered 1 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Office only, 7-19 stories · Owner of record: Brooklyn NY I SGF · 45,056 sf lot · 9.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNewmark GroupUnder Construction6p · 2 filings · 7 docs
BulkheadSuspended scaffold for facade workUnder Construction1p · 2 filings · 6 docs
PenthouseFirst New York Partners9p · 2 filings · 2 docs
Floor 9First New York Partners1p · 1 filing · 2 docs
Floor 8Newmark GroupUnder Construction6p · 2 filings · 9 docs
Floor 7NewmarkUnder Construction16p · 5 filings · 14 docs
Floor 6BTDSUnder Construction24p · 5 filings · 13 docs
Floor 5FDNY, FDNY Restacking - CadetsUnder Construction25p · 5 filings · 11 docs
Floor 4BitsUnder Construction19p · 4 filings · 16 docs
Floor 3Newmark GroupUnder Construction12p · 3 filings · 8 docs
Floor 2Newmark GroupUnder Construction7p · 2 filings · 8 docs
Floor 1Brookfield Properties3p · 3 filings · 7 docs
MezzanineFirst New York Partners7p · 1 filing · 2 docs
CellarNewmark6p · 2 filings · 16 docs
Sub-CellarBrookfield Properties4p · 1 filing · 14 docs
Site & exteriorTemporary sidewalk shed for overhead protection8p · 3 filings · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FC Flatbush Associate II12703/21/2026
Brookfield Properties2707/08/2026
First New York Partners1107/08/2026
NYC Economic Development803/21/2026
Brooklyn NY I SGF303/22/2026
New York City Econimic Development303/21/2026
F.c.flatbush Ave Assoc.l.l.p203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates4003/21/2026
Preemptive Solutions & Consulting403/21/2026
AE Design Solution403/21/2026
Integrated C O Milrose Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1107/25/2026
Brennan OperatingGeneral Contractor807/08/2026
Concept Construction ServiceGeneral Contractor403/21/2026
A&A PlumbingPlumbing307/08/2026
Structure ToneGeneral Contractor203/21/2026
The Martin Group New YorkGeneral Contractor203/21/2026
H. & L. ElectricElectrical203/21/2026
DNA ContractingGeneral Contractor104/09/2026
Fresh Meadow Mechanicalspecialty_contractor104/08/2026
JT Magen & CompanyGeneral Contractor107/08/2026
Spring Scaffoldingspecialty_contractor104/09/2026
The Venetian GroupGeneral Contractor107/08/2026
Trane U.SGeneral Contractor107/08/2026
Viking Restoration Svcespecialty_contractor107/08/2026
Par Plumbing CoPlumbing107/08/2026
Preferred Sprinkler and MechanicalFire Protection107/08/2026
Corporate Electric GroupElectrical103/22/2026
Tristate Plumbing ServicesPlumbing107/08/2026
Difalzo Electric NYElectrical103/22/2026
Difazio Electric NYElectrical103/22/2026
E-J Electric Installation CoElectrical103/22/2026
Inner City Electrical ContractorsElectrical103/21/2026
All Ways Electric Corp.wElectrical103/21/2026
TF ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Soni Engineering Consulting9819111/13/2025
Vincent J. Liotta P. E1974110/01/2025
Mohammad Ahead - Professi9286107/02/2025
Metric Consulting and Ins1803304/10/2025
Catalpa Special Inspectio2004702/13/2025
Autographic Co1579206/21/2021
MEP Inspections1102103/31/2020
Building Lifecycle
All (199)Filed (27)Permit Issued (33)Signed Off (18)Facade (FISP) (20)Violation (60)Inspection (9)Objection (2)Special Inspection (30)
07/23/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01405286-I1
07/23/2026
Permit issued — Sidewalk Shed
B01405286-I1-SH
01/30/2026
Signed off — Alteration
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES ON 4TH & 6TH FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08024627-I1
01/23/2026
Cycle 9 facade report signed — UNSAFE
01/05/2026
Signed off — Alteration
B01245927-I1
12/30/2025
Cycle 9 facade report submitted
12/23/2025
Cycle 9 facade inspection completed
12/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/21/2025
Permit issued — Suspended Scaffold
B01317925-I1-SC
11/20/2025
Signed off — Alteration
B08024604-I1
11/13/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
B01317925-I1
11/12/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
11/12/2025
Special inspection requirement — Post-installed Anchors
nayan soni
11/10/2025
Permit issued — General Construction
B01172472-I1-GC
10/02/2025
Permit issued — Mechanical Systems
B01238145-I1-MS
10/01/2025
Filed — Alteration
REPLACEMENT OF 4 PACKAGED UNIT WITH A TOTAL CAPACITY OF 10.5 TONS ON THE GROUND FLOOR, FLOOR 007, FLOOR 008. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
B01238145-I1
07/22/2025
Permit issued — Sidewalk Shed
B00777212-I1-SH
07/09/2025
Permit issued — Suspended Scaffold
B01245927-I1-SC
07/08/2025
Objection resolved — Addressed
07/02/2025
Filed — Alteration
B01245927-I1
06/09/2025
Special inspection requirement — Mechanical Systems
Vincent Liotta
06/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
06/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
06/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
06/09/2025
Special inspection requirement — Maintenance information
Vincent Liotta
06/09/2025
Special inspection requirement — Final
Vincent Liotta
05/07/2025
Signed off — Alteration
INSTALLATION OF NEW VRF SYSTEM FOR ELEVATOR MOTOR ROOM
B01169726-I1
05/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2025
Objection raised — Cost
04/10/2025
Filed — Alteration
FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01172472-I1
04/08/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
04/08/2025
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
04/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
03/19/2025
Signed off — Alteration
Installation of supported scaffolding as indicated on the attached drawings. There are no changes in use, egress or occupancy.
B00777384-I1
02/21/2025
Permit issued — Mechanical Systems
B01169726-I1-MS
02/13/2025
Filed — Alteration
INSTALLATION OF NEW VRF SYSTEM FOR ELEVATOR MOTOR ROOM
B01169726-I1
01/27/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
01/16/2025
Cycle 9 facade report signed — UNSAFE
01/07/2025
Cycle 9 facade report submitted
01/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/06/2025
Cycle 9 facade inspection completed
12/19/2024
Permit issued — Plumbing
B01133982-I1-PL
12/03/2024
Filed — Alteration
INSTALLATION OF GREASE TRAPS ON CELLAR & 7TH FLOORS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01133982-I1
10/29/2024
Special inspection requirement — Post-installed Anchors
ERIC BERLENT
10/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
10/01/2024
Violation issued (ECB, open)
Construction
07/22/2024
Permit issued — Sidewalk Shed
B00777212-I1-SH
02/22/2024
Violation issued (ECB, open)
Local Law
02/15/2024
Cycle 9 facade report submitted
02/13/2024
Cycle 9 facade report signed — UNSAFE
01/30/2024
Cycle 9 facade inspection completed
10/29/2023
Violation issued (FDNY_ORDER, closed)
10/29/2023
Violation issued (FDNY_NOV, closed)
10/29/2023
Violation issued (FDNY_NOV, closed)
10/29/2023
Violation issued (FDNY_ORDER, closed)
09/26/2023
Signed off — Alteration
REMOVAL AND CAP EXISTING HW PIPING AND GAS DISTRIBUTION, BACK TO VALVES AND PUMP, NEW HW TO RECONNECT TO EXISTING DISTRIBUTION RISER PROVIDE NEW SHUTOFF VALVE AT RISER, CONNECT NEW WATER HEATER GAS FEED TO EXISTING EMERGENCY GENERATOR.
B08032723-I1
08/16/2023
Signed off — Alteration
Modification of existing ductwork work to include new insulation and remove branch ductwork to VAV back to main, new HVAC ductwork, piping and equipment and new condenser water piping as per plans. All work associated with this renovation is interior.
B00836782-I1
08/04/2023
Signed off — Alteration
B00836775-I1
07/19/2023
Permit issued — Supported Scaffold
B00777384-I1-SF
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding07/23/2026
DOB NOWSuspended ScaffoldPermit IssuedDNA Contracting11/21/2025
DOB NOWGeneral ConstructionPermit IssuedPaul Charlton11/10/2025
DOB NOWMechanical SystemsPermit IssuedFresh Meadow Mechanical10/02/2025
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding07/22/2025
DOB NOWSuspended ScaffoldSigned-offLawrence Exterior Rest Co07/09/2025
DOB NOWMechanical SystemsSigned-offTrane U.S02/21/2025
DOB NOWPlumbingSigned-offPar Plumbing Co12/19/2024
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding07/22/2024
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding07/19/2023
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding07/19/2023
DOB NOWGeneral ConstructionSigned-offBrennan Operating07/14/2023
DOB NOWPlumbingSigned-offA&A Plumbing06/26/2023
DOB NOWGeneral ConstructionSigned-offBrennan Operating06/20/2023
DOB NOWMechanical SystemsSigned-offConceptconsruction Services04/12/2023
DOB NOWGeneral ConstructionSigned-offConcept Construction Service03/24/2023
DOB NOWMechanical SystemsPermit IssuedConcept Construction Service01/10/2023
DOB NOWPlumbingSigned-offTristate Plumbing Services01/06/2023
DOB NOWGeneral ConstructionSigned-offBrennan Operating09/23/2022
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding07/21/2022
DOB NOWSidewalk ShedPermit IssuedSpring Scaffolding07/19/2022
DOB NOWGeneral ConstructionSigned-offBrennan Operating12/06/2021
DOB NOWGeneral ConstructionSigned-offThe Martin Group New York11/17/2021
DOB NOWPlumbingSigned-offA&A Plumbing11/03/2021
DOB NOWGeneral ConstructionSigned-offBrennan Operating10/22/2021
DOB NOWPlumbingSigned-offA&A Plumbing07/28/2021
DOB NOWGeneral ConstructionSigned-offBrennan Operating07/27/2021
DOB NOWGeneral ConstructionSigned-offBrennan Operating07/12/2021
DOB NOWMechanical SystemsSigned-offStructure Tone03/12/2021
DOB NOWMechanical SystemsSigned-offJT Magen & Company07/10/2020
DOB NOWStructuralPermit IssuedViking Restoration Svce05/15/2020
DOB NOWSprinklersSigned-offPreferred Sprinkler and Mechanical05/09/2020
DOB NOWMechanical SystemsSigned-offThe Venetian Group11/25/2019
BISOTISSUEDStructure Tone12/30/2020
BISOTISSUEDStructure Tone10/27/2020
BISOTISSUEDViking Restoration Svce07/15/2020
BISOTISSUEDJT Magen & Company11/19/2019
BISOTISSUEDThe Venetian Group10/25/2019
BISMHISSUEDFresh Meadow Mechanical07/09/2019
BISOTISSUEDJGM Construction Development05/09/2019
+ 43 more permits on file
1 project · most recent 10/01/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/01/2025Permit IssuedFresh Meadow MechanicalAir Conditioning Systems
Cooling
Liebert PX018UG1A809KN 5 tons · Crac Unit ×4
21 projects · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedH. & L. Electric3 meters
11/28/2025CompleteTF ElectricalGeneral Wiring
10/14/2025Permit IssuedDifazio Electric NYGeneral Wiring
09/16/2025CompleteH. & L. Electric—
07/29/2025CompleteDifazio Electric NYGeneral Wiring
07/29/2025CompleteDifazio Electric NYGeneral Wiring
07/29/2025CompleteDifazio Electric NYGeneral Wiring
07/16/2025CompleteH. & L. ElectricGeneral Wiring
10/01/2024CompleteH. & L. Electric3 meters
09/19/2023CompleteH. & L. Electric2 meters
07/19/2023CompleteH. & L. Electric3 meters
07/10/2023CompleteOff Shore ElectricGeneral Wiring
03/10/2023CompleteH. & L. ElectricGeneral Wiring
04/11/2022Permit IssuedCorporate Electric Group—
03/14/2022CompleteTop Shelf Electric—
1 project · most recent 06/21/2021
Concrete
FiledStatusContractorScope
06/21/2021Permit IssuedViking Restoration SvceConcrete
2 projects · most recent 07/23/2026
Sidewalk Shed
FiledStatusContractorScope
07/23/2026Permit IssuedSpring ScaffoldingSidewalk Shed
07/19/2022Permit IssuedSpring ScaffoldingSidewalk Shed
1 project · most recent 11/13/2025
Suspended Scaffold
FiledStatusContractorScope
11/13/2025Permit IssuedDNA ContractingSuspended Scaffold
1 project · most recent 11/13/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/13/2025Permit IssuedDNA ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/19/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
11/12/2025Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
11/12/2025Post-installed Anchorsnayan sonispecial
06/09/2025Mechanical SystemsVincent Liottaspecial
06/09/2025HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
06/09/2025HVAC-R and service water heating equipmentVincent Liottaenergy_progress
06/09/2025HVAC-R and service water heating system controlsVincent Liottaenergy_progress
06/09/2025Maintenance informationVincent Liottaenergy_progress
06/09/2025FinalVincent Liottaprogress
04/08/2025MasonrySAMI HAJJAR P.Especial
04/08/2025Post-installed AnchorsSAMI HAJJAR P.Especial
04/08/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
01/27/2025FinalSAMI HAJJAR P.Eprogress
10/29/2024Post-installed AnchorsERIC BERLENTspecial
10/29/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/01/2023Maintenance informationERIC BERLENTenergy_progress
03/01/2023HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
03/01/2023HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
03/01/2023Energy Code Compliance InspectionsERIC BERLENTprogress
03/01/2023FinalERIC BERLENTprogress
03/01/2023Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/01/2023Mechanical SystemsERIC BERLENTspecial
03/01/2023HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
10/20/2022FinalERIC BERLENTprogress
10/07/2021FinalERIC BERLENTprogress
09/28/2021FinalERIC BERLENTprogress
Latest 25 of 44.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NewmarkOfficeCellar, Floor 7
Project B01133982 Alteration · Permit Entire · 12/03/2024
BTDSLaboratoryFloor 6
Project B00836782 Alteration · LOC Issued · 03/22/2023
Project B00836775 Alteration · LOC Issued · 03/20/2023
FDNYGovernment / CivicFloor 5
Project B00539693 Alteration · LOC Issued · 07/07/2021
Project B00539720 Alteration · LOC Issued · 07/07/2021
FDNY Restacking - CadetsGovernment / CivicFloor 5
Project B00262065 Alteration · LOC Issued · 03/31/2020
Project B00262418 Alteration · LOC Issued · 03/31/2020
BitsOfficeFloor 4
Project B00250713 Alteration · LOC Issued · 11/13/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 607 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch21
09/01/2026B00539720-I1Request digital key ↗
09/01/2026B00539693-I1Request digital key ↗
09/01/2026B00607735-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00250713-I1Request digital key ↗
09/02/2026B00262418-I1Request digital key ↗
09/02/2026B00410938-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/01/2026B00253188-I1Request digital key ↗
08/15/2026B00253188-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00262065-I1Request digital key ↗
▸Applications & Permits105
▸BISPLAN / WORK APPROVAL APPLICATION54
06/18/2021322002275Open ↗
06/16/2021322002275Open ↗
10/22/2020340777948Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION48
10/27/2020340777948Open ↗
11/21/2019322003103Open ↗
11/06/2019322002275Open ↗
Showing 3 of 48 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
11/29/2018321850252Open ↗
04/02/2018321058813Open ↗
03/20/2018321058813Open ↗
▸Seals & Professional Certifications195
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION78
11/21/2019322003103Open ↗
10/29/2019322002275Open ↗
10/18/2019322000035Open ↗
Showing 3 of 78 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT27
10/22/2020340777948Open ↗
11/21/2019322003103Open ↗
10/29/2019322002275Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/29/2026B00777384-I1Open ↗
08/28/2026B08032723-I1Open ↗
08/27/2026B00836775-I1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
07/19/2020340664748Open ↗
11/21/2019322003103Open ↗
10/29/2019322002275Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026B01238145-I1Open ↗
09/03/2026B00253188-I1Open ↗
09/03/2026B00253188-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026B01238145-I1Open ↗
09/23/2026B01238145-I1Open ↗
09/20/2026B00601825-I1Open ↗
Showing 3 of 17 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/22/2020340777948Open ↗
05/03/2019340664748Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/22/2020340777948Open ↗
05/03/2019340664748Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment22
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
12/07/2018321850252Open ↗
11/02/2018321850252Open ↗
10/31/2018321850261Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
03/06/2020321631533Open ↗
12/06/2017321082458Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
09/21/2020340664748Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
09/21/2020340664748Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
11/02/2018321850252Open ↗
10/31/2018321850261Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance50
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
11/21/2019322003103Open ↗
10/29/2019322002275Open ↗
10/18/2019322000035Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
09/03/2020322003103Open ↗
08/11/2020322000035Open ↗
05/20/2020340664748Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/22/2020340777948Open ↗
09/17/2020322003103Open ↗
09/03/2020322003103Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
10/08/2021322002275Open ↗
08/26/2021340777948Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/22/2020340777948Open ↗
05/03/2019340664748Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00539720-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY10
10/08/2021322002275Open ↗
08/26/2021340777948Open ↗
10/27/2020340777948Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs46
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
10/08/2021322002275Open ↗
08/26/2021340777948Open ↗
09/21/2020340664748Open ↗
Showing 3 of 27 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/20/2020340664748Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026B00253188-P1Open ↗
08/13/2026B00253188-I1Open ↗
08/13/2026B00250713-I1Open ↗
▸BISLANDMARKS SIGNOFF1
12/18/2017321058813Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026B01169726-I1Open ↗
▸Cost, Insurance & Ownership67
▸BISCOST AFFIDAVIT65
10/22/2020340777948Open ↗
09/03/2020322003103Open ↗
08/11/2020322000035Open ↗
Showing 3 of 65 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/08/2021322002275Open ↗
08/26/2021340777948Open ↗
▸Filing & Intake Forms76
▸BISEFILING COVER SHEET38
11/19/2019322003103Open ↗
10/30/2019322002275Open ↗
10/22/2019322000035Open ↗
Showing 3 of 38 on file for this type
▸BISADDITIONAL INFORMATION20
07/29/2021340777948Open ↗
06/18/2021322002275Open ↗
04/23/2020322003103Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM16
10/12/2019321850252Open ↗
09/28/2019321850252Open ↗
09/19/2019321573203Open ↗
Showing 3 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
10/22/2020340777948Open ↗
05/03/2019340664748Open ↗
▸Other Documents4
▸DOB NOWCalculations2
08/13/2026B01245927-I1Open ↗
08/13/2026B01317925-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B01317925-I1Open ↗
08/13/2026B01245927-I1Open ↗