Back
Tenant
BTDS
Tenant
BROOKLYN · 2
1 building
2
Total Filings
2
Projects on File
1
Buildings Worked
0
Projects w/ Open Permits
Tenant
Primary Trade
Activity
Not enough dated projects to chart.
Portfolio status
Browse projects →
Signed off2100%
By project type
Alteration2
Most active buildings
All buildings →
9 METROTECH CENTERBROOKLYN · latest 04/12/2023
2 projects
Key relationships
Everyone →
Filing representatives
1 projects
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B008367829 METROTECH CENTER
BROOKLYN
AlterationSigned-off03/22/202304/12/2023
Contractor CONCEPTCONSRUCTION SERVICES INC
Modification of existing ductwork work to include new insulation and remove branch ductwork to VAV back to main, new HVAC ductwork, piping a…
B008367759 METROTECH CENTER
BROOKLYN
AlterationSigned-off03/20/202303/24/2023Interior demo and installation of partitions on 6th floor BTDS as per plans. No change in use, egress or occupancy.
Counts cover all 2 projects (2 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Bala Consulting Engineers103/22/2023
Michelle Drollette Architect103/20/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Concept Construction Service103/20/2023
Conceptconsruction Services103/22/2023
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
Jam Consultants103/22/2023
2 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 2Signed off 2
2 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B008367829 METROTECH CENTER
BROOKLYN
AlterationSigned-off03/22/202304/12/2023
Contractor CONCEPTCONSRUCTION SERVICES INC
Modification of existing ductwork work to include new insulation and remove branch ductwork to VAV back to main, new HVAC ductwork, piping a…
B008367759 METROTECH CENTER
BROOKLYN
AlterationSigned-off03/20/202303/24/2023Interior demo and installation of partitions on 6th floor BTDS as per plans. No change in use, egress or occupancy.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
9 METROTECH CENTER ↗203/22/2023
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00836775-I1 · 9 METROTECH CENTEROpen ↗
08/27/2026B00836782-I1 · 9 METROTECH CENTEROpen ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00836782-I1 · 9 METROTECH CENTEROpen ↗
08/28/2026B00836782-I1 · 9 METROTECH CENTEROpen ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00836782-I1 · 9 METROTECH CENTEROpen ↗