Miscellaneous two family
9 SAINT FELIX STREET
BROOKLYN · Fort Greene · BIN 3058704
💬 Discuss this project
1901Year Built
3Stories
B9Building Class
R6BZoning
3,280 sfGross Floor Area
2Units
1 Active Violation ▸FDNY Report ↗
Miscellaneous two family · Owner of record: 9 Saint Felix Street · 1,343 sf lot · 2.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofInterior renovation of existing 1st floor to roof14p · 2 filings · 20 docs
Floor 3Interior renovation of existing 1st floor to roof21p · 2 filings · 20 docs
Floor 2Interior renovation of existing 1st floor to roof20p · 2 filings · 20 docs
Floor 1Interior renovation of existing 1st floor to roof25p · 4 filings · 20 docs
CellarInterior renovation of existing 1st floor to roof11p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/05/2020$2.7M—Private party → Private party$823/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Evan Chan Architect1402/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Evan Chan Architect P2803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Matic ConstructionGeneral Contractor1007/08/2026
AAA Total PlumbingPlumbing707/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Evan Chan Architect5605702/16/2023
Building Lifecycle
All (74)Filed (14)Permit Issued (8)Signed Off (4)Violation (1)Inspection (9)Objection (14)Special Inspection (24)
04/18/2023
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FL TO ROOF. GENERAL CONSTRUCTION WORK TYPE. EXISTING 2 FAMILY DWELLING TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00572641-I1
04/18/2023
Signed off — Alteration
plumbing work type for existing 2 family dwelling, work on 1st floor to 3rd floor only. Existing 2 family dwellings to remain, no change to use, egress and occupancy
B00573540-I1
02/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Evan Chan
02/24/2023
Objection resolved — Addressed
02/22/2023
Signed off — Alteration
B00519156-I1
02/16/2023
Filed — Alteration
plumbing work type for existing 2 family dwelling, work on 1st floor to 3rd floor only. Existing 2 family dwellings to remain, no change to use, egress and occupancy
B00573540-P4
02/16/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/16/2023
Objection raised — Scope
02/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Evan Chan
02/10/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/02/2023
Permit issued — Plumbing
B00573540-I1-PL
01/14/2023
Signed off — Alteration
Installation of one (1) new sink and one (1) washer at cellar floor. replacement and relocation of kitchen and powder room plumbing fixtures at garden floor level
B00524151-I1
12/08/2022
Objection resolved — Addressed
12/08/2022
Objection resolved — Addressed
12/08/2022
Special inspection requirement — Permanent certificate
Evan Chan
12/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
Evan Chan
12/08/2022
Special inspection requirement — Energy Code Compliance Inspections
Evan Chan
12/08/2022
Special inspection requirement — Fenestration air leakage
Evan Chan
12/08/2022
Special inspection requirement — Lighting controls
Evan Chan
12/08/2022
Special inspection requirement — Maintenance information
Evan Chan
12/08/2022
Special inspection requirement — Lighting in dwelling units
Evan Chan
12/08/2022
Special inspection requirement — Fenestration areas
Evan Chan
12/08/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Evan Chan
12/08/2022
Special inspection requirement — Interior lighting power
Evan Chan
12/06/2022
Filed — Alteration
Installation of one (1) new sink and one (1) washer at cellar floor. replacement and relocation of kitchen and powder room plumbing fixtures at garden floor level
B00524151-P4
12/06/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FL TO ROOF. GENERAL CONSTRUCTION WORK TYPE. EXISTING 2 FAMILY DWELLING TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00572641-P2
12/05/2022
Objection raised — Scope
11/21/2022
Permit issued — Plumbing
B00524151-I1-PL
11/10/2022
Objection raised — Scope
11/07/2022
Objection resolved — Addressed
11/07/2022
Objection resolved — Addressed
11/03/2022
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 1ST FL TO ROOF. GENERAL CONSTRUCTION WORK TYPE. EXISTING 2 FAMILY DWELLING TO REMAIN. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00572641-P1
11/03/2022
Special inspection requirement — Fenestration air leakage
Evan Chan
11/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
Evan Chan
11/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Evan Chan
11/03/2022
Special inspection requirement — Maintenance information
Evan Chan
11/03/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Evan Chan
11/03/2022
Special inspection requirement — Lighting controls
Evan Chan
11/03/2022
Special inspection requirement — Fenestration areas
Evan Chan
11/03/2022
Special inspection requirement — Interior lighting power
Evan Chan
11/03/2022
Special inspection requirement — Permanent certificate
Evan Chan
11/03/2022
Special inspection requirement — Lighting in dwelling units
Evan Chan
10/28/2022
Objection raised — Scope
10/28/2022
Objection raised — Scope
10/27/2022
Filed — Alteration
plumbing work type for existing 2 family dwelling, work on 1st floor to 3rd floor only. Existing 2 family dwellings to remain, no change to use, egress and occupancy
B00573540-P3
10/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Evan Chan
07/28/2022
Permit issued — General Construction
B00572641-I1-GC
07/28/2022
Permit issued — General Construction
B00519156-I1-GC
04/13/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/10/2022
Objection resolved — Addressed
03/01/2022
Objection raised — Other
02/25/2022
Filed — Alteration
Installation of one (1) new sink and one (1) washer at cellar floor. replacement and relocation of kitchen and powder room plumbing fixtures at garden floor level
B00524151-P3
02/25/2022
Filed — Alteration
plumbing work type for existing 2 family dwelling, work on 1st floor to 3rd floor only. Existing 2 family dwellings to remain, no change to use, egress and occupancy
B00573540-P2
02/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Evan Chan
02/17/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAAA Total Plumbing02/02/2023
DOB NOWPlumbingSigned-offAAA Total Plumbing11/21/2022
DOB NOWGeneral ConstructionSigned-offMatic Construction07/28/2022
DOB NOWGeneral ConstructionSigned-offMatic Construction07/28/2022
DOB NOWPlumbingSigned-offAAA Total Plumbing12/07/2021
DOB NOWPlumbingSigned-offAAA Total Plumbing09/27/2021
DOB NOWGeneral ConstructionSigned-offMatic Construction09/17/2021
DOB NOWGeneral ConstructionSigned-offMatic Construction09/15/2021
1 project · most recent 10/14/2022
General Wiring
FiledStatusContractorScope
10/14/2022CompleteKwong Ming ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/16/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/10/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/17/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/17/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
02/28/2023Fire-Resistant Penetrations and JointsEvan Chanspecial
02/15/2023Fire-Resistant Penetrations and JointsEvan Chanspecial
12/08/2022Permanent certificateEvan Chanenergy_progress
12/08/2022Fire-Resistance Rated ConstructionEvan Chanprogress
12/08/2022Energy Code Compliance InspectionsEvan Chanprogress
12/08/2022Fenestration air leakageEvan Chanenergy_progress
12/08/2022Lighting controlsEvan Chanenergy_progress
12/08/2022Maintenance informationEvan Chanenergy_progress
12/08/2022Lighting in dwelling unitsEvan Chanenergy_progress
12/08/2022Fenestration areasEvan Chanenergy_progress
12/08/2022Fenestration and door U-factor and product ratingsEvan Chanenergy_progress
12/08/2022Interior lighting powerEvan Chanenergy_progress
11/03/2022Fenestration air leakageEvan Chanenergy_progress
11/03/2022Fire-Resistance Rated ConstructionEvan Chanprogress
11/03/2022Energy Code Compliance InspectionsEvan Chanprogress
11/03/2022Maintenance informationEvan Chanenergy_progress
11/03/2022Fenestration and door U-factor and product ratingsEvan Chanenergy_progress
11/03/2022Lighting controlsEvan Chanenergy_progress
11/03/2022Fenestration areasEvan Chanenergy_progress
11/03/2022Interior lighting powerEvan Chanenergy_progress
11/03/2022Permanent certificateEvan Chanenergy_progress
11/03/2022Lighting in dwelling unitsEvan Chanenergy_progress
10/27/2022Fire-Resistant Penetrations and JointsEvan Chanspecial
02/25/2022Fire-Resistant Penetrations and JointsEvan Chanspecial
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/01/2026B00519156-I1Request digital key ↗
09/01/2026B00524151-P3Request digital key ↗
09/01/2026B00524151-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature20
09/27/2026B00572641-P1Open ↗
09/27/2026B00572641-P1Open ↗
09/27/2026B00572641-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00519156-I1Open ↗
09/01/2026B00524151-I1Open ↗
09/01/2026B00524151-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00573540-P2Open ↗
08/24/2026B00573540-I1Open ↗
08/24/2026B00573540-P4Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/01/2026B00519156-I1Open ↗
09/01/2026B00524151-P4Open ↗
09/01/2026B00524151-P1Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00572641-I1Open ↗
08/13/2026B00519156-I1Open ↗
08/13/2026B00573761-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00573540-P3Open ↗