RoofApolloUnder Construction3p · 2 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction
Work includes per filed plans remove/replace cracked stone coping, repair stone panels/copings, sealant joint restoration, replace damaged veneer anchors, repair stucco wall finish, brick replacement, brick stitching repair, brick corner reconstruction.
On file for this project
3 documents · 1 drawing sheet
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 9,10,11,41,42, Construction Floors: 8,9,10,40,41. No change to use, egress or occupancy.
On file for this project
21 documents · 1 drawing sheet
BulkheadSuspended scaffold for facade restoration and inspectionUnder Construction1p · 1 filing · 10 docs
Structural
Suspended Scaffold for Facade Restoration & Inspection as Shown on Plans
On file for this project
10 documents · 1 drawing sheet
Floor 50Solow Building Company LLC13p · 2 filings · 13 docs
MechanicalStructural
Issued Permit Scope
Mechanical Systems · Structural
STRUCTURAL MODIFICATIONS TAKING PLACE ON 50TH FL CONSTRUCTION (51ST MARKETING) AS PER PLANS FILED HEREWITH. MECHANICAL FLOOR, NO OCCUPANCY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON 50TH FLOOR CONSTRUCTION (51ST MARKETING) AS PER PLANS FILED HEREWITH. MECHANICAL FLOOR NO OCCUPANCY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Floor 49K-5990 Tech School, Benefit Street Partners, Marketing floorUnder Construction15p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
GENERAL CONSTRUCTION TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
PLUMBING MODIFICATIONS TAKING PLACE ON 49TH FLOOR CONSTRUCTON (50TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
SPRINKLER MODIFICATIONS TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
Latest 3 of 5 filings on this floor.
Floor 48Marketing floor 4918p · 5 filings · 20 docs
ArchitectureDMFire ProtectionGeneral
Issued Permit Scope
General Construction · Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON 48TH FLOOR CONSTRUCTION (49TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 48TH FLOOR CONSTRUCTION (49TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
INTERIOR DEMOLITION OF NON-STRUCTURAL ELEMENTS ON THE 48TH FLOOR AS PER THE DESIGN DRAWINGS
On file for this project
14 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 47Standard Industries, 40 North Industries, Marketing floor 48Under Construction53p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
SPRINKLER MODIFICATIONS TAKING PLACE ON 47TH FLOOR CONSTRUCTION (48TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
GENERAL CONSTRUCTION TAKING PLACE ON 47TH FLOOR CONSTRUCTION (48TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Structural modifications including concrete on metal deck infill at existing stair opening. No change in use, egress or occupancy.
On file for this project
24 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 4640 North Industries, Standard Industries64p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification of sprinkler system
On file for this project
23 documents · 10 drawing sheets
Modification to sprinkler system as shown on plans
On file for this project
3 documents · 2 drawing sheets
Modification of plumbing system as shown on plans
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 45Tikehau Capital, Mousse Partners115p · 17 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
STANDPIPE MODIFICATIONS TAKING PLACE ON 45TH FLOOR CONSTRUCTION (46TH MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
PLUMBING MODIFICATIONS TAKING PLACE ON 45TH FL CONSTRUCTION (46TH MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
GENERAL CONSTRUCTION TAKING PLACE ON 45TH FL CONSTRUCTION (46TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 17 filings on this floor.
Floor 44Chanel, Mousse Partners, Marketing floor 45Under Construction46p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON 44TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
GENERAL CONSTRUCTION TAKING PLACE ON 44TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
MECHANICAL MODIFICATIONS TAKING PLACE ON 44TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Latest 3 of 11 filings on this floor.
Floor 43Solow Realty & Development CO.4p · 1 filing · 12 docs
ArchitectureDMFire ProtectionPlumbingOther
Issued Permit Scope
General Construction
INTERIOR DEMOLITION OF 43RD FLOOR INCLUDING BUT NOT LIMITED TO NON-LOAD BEARING PARTITIONS, DOORS, FLOORING, CEILING, EQUIPMENT, WIRING, FINISHES, LIGHTS, SUPPORTS, TOILETS, LAVATORIES, & SHOWERS PER DESIGN DRAWINGS
On file for this project
12 documents · 4 drawing sheets
Floor 42Mousse Partners, Apollo205p · 14 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
SPRINKLER MODIFICATIONS TAKING PLACE ON 42ND FLOOR CONSTRUCTION (43RD MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON 42ND FLOOR CONSTRUCTION (43RD MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents · 3 drawing sheets
STANDPIPE MODIFICATIONS TAKING PLACE ON 42ND FLOOR CONSTRUCTION (43RD MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 14 filings on this floor.
Floor 41Apollo64p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 9,10,11,41,42, Construction Floors: 8,9,10,40,41. No change to use, egress or occupancy.
On file for this project
21 documents · 5 drawing sheets
Filing herewith Structural work as per plans filed herewith. Marketing Floors:10,11,41,42, Construction Floors:9,10,40,41. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Filing herewith interior renovation of the 10, 11, 41 and 42 FLS. as per plans filed herewith. Construction Floors 9,10,40,41. Marketing Floors 10,11,41,42. No change to use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 40Sculptor Capital42p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification/additions to existing sprinkler system on the 39th & 40th Floors. Installation of new pre-action sprinkler system on the 40th Floor as shown on drawings. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modification to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
8 documents · 3 drawing sheets
Minor interior revisions to office space, removal of stair and expansion to men's restroom as show on drawings. No change in use, egress or occupancy.
On file for this project
6 documents · 8 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 39Jain Global, Sculptor Capital63p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal and installation of interior non bearing partitions and related finishes as per drawings. No change to use, egress or occupancy.
On file for this project
22 documents · 11 drawing sheets
Modification/additions to existing sprinkler system on the 39th & 40th Floors. Installation of new pre-action sprinkler system on the 40th Floor as shown on drawings. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modification to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 38Artisan Partners73p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
REMOVAL OF EXISTING PRIMARY AIR DUCTS, SECONDARY WATER RETURN RISERS, PERIMETER INDUCTION UNITS, SUPPLY AIR MAIN & DUCT; INSTALLATION OF VARIOUS EQUIPMENTS, DUCTS, LINES, FANS, UNITS, PIPING AS PER DESIGN DRAWINGS
On file for this project
27 documents · 10 drawing sheets
Modifications to the existing Standpipe System: Installation of one (1) new Fire Hose Cabinet and associated Standpipe piping on the 38th Floor as per plans (Artisan Partners.) No change to use, egress or occupancy.
On file for this project
12 documents
Modifications to the existing Sprinkler System: Installation of sixty-three (63) new sprinkler heads and associated sprinkler piping on the 38th Floor as per plans (Artisan Partners - Interior renovations.) No change to use, egress or occupancy,
On file for this project
9 documents
Latest 3 of 9 filings on this floor.
Floor 37Qatar Investment Authority Qia Advisory (usa), Kinetic PartnUnder Construction240p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.
On file for this project
36 documents · 15 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON 37TH FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
GENERAL CONSTRUCTION TAKING PLACE ON 37TH FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
Floor 36D1 Capital4p · 1 filing · 3 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 35
Floor 34Tiger Global Management, Blue Ridge Capital Ventures & G9 Ve87p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 4 drawing sheets
Modification to existing plumbing systems and installation of plumbing fixtures. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 33Partial 33rd floor renovation13p · 3 filings · 11 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
PLUMBING MODIFICATIONS TAKING PLACE AT 33RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 33RD FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 3 drawing sheets
MECHANICAL MODIFICATIONS TAKING PLACE AT 33RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Floor 32Meritas, Veritas Capital20p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe · Structural
Partial 31st floor office renovation and new convenience stair to the 32nd floor as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents
STRUCTURAL REFRAMING OF FLOOR TO ACCOMMODATE NEW CONVENIENCE STAIR OPENING AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
FILING FOR STRUCTURAL FRAMING. WELDING RELATED TO BUILD-OUT FOR THE 32ND FL. INTERIOR MODIFICATIONS AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
Latest 3 of 6 filings on this floor.
Floor 31Veritas Capital, Sycamore Partners13p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Filing for sprinkler work to accommodate the Veritas - 31st Floor Expansion as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 6 drawing sheets
Partial 31st floor office renovation and new convenience stair to the 32nd floor as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents
Filing for plumbing work to accommodate the Veritas - 31st Floor Expansion as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 5 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 3030th Floor Glass and GlazingUnder Construction3p · 1 filing · 4 docs
Architecture
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON 30TH FL CONSTRUCTION (31ST MARKETING)AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 3 drawing sheets
Floor 29Halle Capital, Hess Corporation, Marketing floor 30 +1Under Construction105p · 20 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Project M01468121Permit Issued · 10/19/2026
GENERAL CONSTRUCTION TAKING PLACE ON 29TH FLOOR CONSTRUCTION (30TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Project M01468450Permit Issued · 10/19/2026
MECHANICAL MODIFICATIONS TAKING PLACE ON 29TH FLOOR CONSTRUCTION (30TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
Project M01468454Permit Issued · 10/19/2026
PLUMBING MODIFICATIONS TAKING PLACE ON 29TH FLOOR CONSTRUCTON (30TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Latest 3 of 20 filings on this floor.
Floor 28Davidson Kempner101p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 3 drawing sheets
Modification to existing Plumbing fixtures, Sprinkler system, and Standpipe system as per plans filed herewith
On file for this project
12 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Latest 3 of 7 filings on this floor.
Floor 27Davidson Kempner13p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. ADDITION OF ASSEMBLY OCCUPANCY, AND INCREASE IN FLOOR CAPACITY ON THE 27TH FLOOR.
On file for this project
8 documents · 2 drawing sheets
Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 7 drawing sheets
Modification to existing Plumbing fixtures, Sprinkler System, and Standpipe system as per plans filed herewith
On file for this project
12 documents · 3 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 26Coatue Management, Davidson Kempner, Marketing floor 2773p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
GENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) FOR CHANGE OF USE - OFFICE WITH ACCESSORY EXERCISE ROOM AND COMMERCIAL KITCHEN
On file for this project
10 documents · 1 drawing sheet
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. ADDITION OF ASSEMBLY OCCUPANCY, AND INCREASE IN FLOOR CAPACITY ON THE 27TH FLOOR.
On file for this project
8 documents
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FL CONSTRUCTION (27TH FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 25Coatue Management, Marketing floor 26118p · 10 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
GENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) FOR CHANGE OF USE - OFFICE WITH ACCESSORY EXERCISE ROOM AND COMMERCIAL KITCHEN
On file for this project
10 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON 25TH FL CONSTRUCTION (26TH FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 10 filings on this floor.
Floor 24Davidson Kempner14p · 3 filings · 16 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Sprinklers · Structural
Support of slab opening for new feature stair, and support of mechanical equipment .Approximate Linear footage: 280 ft.
On file for this project
3 documents · 1 drawing sheet
STRUCTURUAL INFILL OF EXISTING SLAB OPENING ON 24TH FLOOR AS PER DESIGN DRAWINGS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION
On file for this project
6 documents · 1 drawing sheet
TEMP LOOP WORK AS PER ATTACHED PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
On file for this project
7 documents · 2 drawing sheets
Floor 23Davidson Kempner81p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 3 drawing sheets
Modification to existing Plumbing fixtures, Sprinkler system, and Standpipe system as per plans filed herewith
On file for this project
12 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Floor 22Apollo91p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
SPRINKLER MODIFICATIONS TAKING PLACE ON 22ND FL CONSTRUCTION (23RD FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON 22ND FL CONSTRUCTION (23RD FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
18 documents
PLUMBING MODIFICATIONS TAKING PLACE ON 22ND FL CONSTRUCTION (23RD MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 9 filings on this floor.
Floor 21Apollo38p · 4 filings · 19 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe · Structural
Filing herewith Structural work on the 21st FL. and 22nd FL. (Construction FL.20, 21 Marketing FL.21, 22) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Filing herewith modification to an existing sprinkler and standpipe system on the 21st FL. (Construction FL.20, Marketing FL.21) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
5 documents
Filing herewith interior renovation of the 21st FL. (Construction FL.20, Marketing FL.21) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 20Loews Hotels, Apollo72p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler and standpipe work in conjunction with an interior fit-out. No change to use, egress, or occupancy.
On file for this project
12 documents · 2 drawing sheets
Filing herewith plumbing work as per plans filed herewith (Construction FL.19 and 20, Marketing FL.20 and 21) . No change to use, egress or occupancy.
On file for this project
8 documents
Installation of Core Restroom, Wellness, and Pantry piping and fixtures on the 19th & 20th floors. No change to use, egress, or occupancy.
On file for this project
6 documents
Latest 3 of 7 filings on this floor.
Floor 19Loews Hotels, Apollo71p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler and standpipe work in conjunction with an interior fit-out. No change to use, egress, or occupancy.
On file for this project
12 documents · 2 drawing sheets
Filing herewith plumbing work as per plans filed herewith (Construction FL.19 and 20, Marketing FL.20 and 21) . No change to use, egress or occupancy.
On file for this project
8 documents
Installation of Core Restroom, Wellness, and Pantry piping and fixtures on the 19th & 20th floors. No change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 18Summit Rock Advisors13p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Modification to existing Sprinkler system & Additions / modifications to existing plumbing system as plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents · 6 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 17Summit Rock Advisors, Veritas Capital104p · 19 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
WORK UNDER THIS APPLICATION IS LIMITED TO THE RENOVATION OF PARTIAL 17THFLOOR INVOLVING WIRING MECHANICAL UNITS.
On file for this project
15 documents · 6 drawing sheets
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
14 documents
Latest 3 of 19 filings on this floor.
Floor 16Apollo64p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith plumbing work as per plans filed herewith (Construction FL.14,15, Marketing FL.15,16). No change to use, egress or occupancy.
On file for this project
16 documents
Filing herewith mechanical work as per plans filed herewith (Construction FL. 13,14,15, Marketing FL.14,15,16). No change to use, egress or occupancy.
On file for this project
19 documents · 7 drawing sheets
Filing herewith Structural work as per plans filed herewith. Construction FL.:13,14,15, Marketing FL.:14,15,16. No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 15Apollo61p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith plumbing work as per plans filed herewith (Construction FL.14,15, Marketing FL.15,16). No change to use, egress or occupancy.
On file for this project
16 documents
Filing herewith mechanical work as per plans filed herewith (Construction FL. 13,14,15, Marketing FL.14,15,16). No change to use, egress or occupancy.
On file for this project
19 documents · 4 drawing sheets
Filing herewith Structural work as per plans filed herewith. Construction FL.:13,14,15, Marketing FL.:14,15,16. No change to use, egress or occupancy.
On file for this project
5 documents
Floor 14Apollo107p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith plumbing work as per plans filed herewith (Construction FL.14,15, Marketing FL.15,16). No change to use, egress or occupancy.
On file for this project
16 documents · 1 drawing sheet
Filing herewith mechanical work as per plans filed herewith (Construction FL. 13,14,15, Marketing FL.14,15,16). No change to use, egress or occupancy.
On file for this project
19 documents · 5 drawing sheets
Filing herewith Structural work as per plans filed herewith. Construction FL.:13,14,15, Marketing FL.:14,15,16. No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 11 filings on this floor.
Floor 13Apollo52p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith interior renovation to existing spaces as per plans filed herewith. Marketing Floors: 11, 12, 13, 14. Construction Floors: 10, 11, 12, 13. No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Filing herewith plumbing demo. work on the 13th FL.. as per plans filed herewith. Construction Floor:12, Marketing Floor:13. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Filing herewith modification to the sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 11,13,14. Construction Floors: 10,12,13. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 12Apollo80p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith interior renovation to existing spaces as per plans filed herewith. Marketing Floors: 11, 12, 13, 14. Construction Floors: 10, 11, 12, 13. No change to use, egress or occupancy.
On file for this project
6 documents · 4 drawing sheets
Filing herewith plumbing work as per plans filed herewith. Marketing FL.12 and 22, Construction FL.11 and 21. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. (Construction FL. 11, 21, Marketing FL. 12, 22). No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 11Apollo90p · 12 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith interior renovation to existing spaces as per plans filed herewith. Marketing Floors: 11, 12, 13, 14. Construction Floors: 10, 11, 12, 13. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 9,10,11,41,42, Construction Floors: 8,9,10,40,41. No change to use, egress or occupancy.
On file for this project
21 documents · 4 drawing sheets
Filing herewith modification to the sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 11,13,14. Construction Floors: 10,12,13. No change to use, egress or occupancy.
On file for this project
8 documents
Latest 3 of 12 filings on this floor.
Floor 10Apollo100p · 13 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith modification to the existing standpipe system as per plans filed herewith. (Construction FL.9, Marketing FL.10.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Filing herewith Plumbing and Sprinkler work on the 10th FL. (Construction FL.:9, Marketing FL:10) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
9 documents
Filing herewith mechanical work on the 10th FL. (Construction FL.:9, Marketing FL:10) as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
13 documents · 3 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 9ApolloUnder Construction65p · 7 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
Filing herewith interior demolition and renovation as per plan filed herewith (8th FL. Construction, 9th FL. Marketing). No change to use, egress or occupancy.
On file for this project
9 documents · 2 drawing sheets
GENERAL CONSTRUCTION TAKING PLACE ON CELLAR FOR CHANGE OF USE AND INCREASE IN POPULATION
On file for this project
14 documents
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Latest 3 of 7 filings on this floor.
Floor 8Apollo59p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith interior demolition and renovation as per plans filed herewith. (Construction FL.7, Marketing FL.8) No change to use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Filing herewith modification to the existing Sprinkler System as per plans filed herewith (Construction FL.7, Marketing FL.8). No change to use, egress or occupancy.
On file for this project
3 documents
Filing herewith mechanical work as per plans filed herewith (Construction FL.7, Marketing FL.8). No change to use, egress or occupancy.
On file for this project
9 documents
Latest 3 of 7 filings on this floor.
Floor 7Apollo69p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Filing herewith modification to the existing Sprinkler System on the 7th FL. (Construction FL.6, Marketing FL.7) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Filing herewith mechanical work on the 7th FL. (Construction FL.:6, Marketing FL:7) as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents · 10 drawing sheets
TEMPORARY SHORING INSTALLATION FOR PARKING GARAGE ON PLAZA LEVEL, CELLAR RAMP LEVELS 0-7, SUBCELLAR B2 & SUBCELLAR B3 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 6Apollo37p · 3 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
TEMPORARY SHORING INSTALLATION FOR PARKING GARAGE ON PLAZA LEVEL, CELLAR RAMP LEVELS 0-7, SUBCELLAR B2 & SUBCELLAR B3 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 3 drawing sheets
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE/ ADDITION OF ACCESSORY COMMERCIAL KITCHEN (F-2) TO THE OFFICE ON THE 26TH FLOOR
On file for this project
30 documents
STRUCTURAL MODIFICATIONS AS PER PLANS FILED HEREWITH.
On file for this project
31 documents
Floor 5Solow Realty & Development Company, LLCUnder Construction13p · 3 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction
MECHANICAL MODIFICATIONS TAKING PLACE ON CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
TEMPORARY SHORING INSTALLATION FOR PARKING GARAGE ON PLAZA LEVEL, CELLAR RAMP LEVELS 0-7, SUBCELLAR B2 & SUBCELLAR B3 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE/ ADDITION OF ACCESSORY COMMERCIAL KITCHEN (F-2) TO THE OFFICE ON THE 26TH FLOOR
On file for this project
30 documents
Floor 4Solow Realty & Development Company, LLC30p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems
TEMPORARY SHORING INSTALLATION FOR PARKING GARAGE ON PLAZA LEVEL, CELLAR RAMP LEVELS 0-7, SUBCELLAR B2 & SUBCELLAR B3 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE/ ADDITION OF ACCESSORY COMMERCIAL KITCHEN (F-2) TO THE OFFICE ON THE 26TH FLOOR
On file for this project
30 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON CELLAR AND 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 3Solow Realty & Development Company, LLC28p · 2 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction
TEMPORARY SHORING INSTALLATION FOR PARKING GARAGE ON PLAZA LEVEL, CELLAR RAMP LEVELS 0-7, SUBCELLAR B2 & SUBCELLAR B3 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE/ ADDITION OF ACCESSORY COMMERCIAL KITCHEN (F-2) TO THE OFFICE ON THE 26TH FLOOR
On file for this project
30 documents
Floor 2Chanel47p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE/ ADDITION OF ACCESSORY COMMERCIAL KITCHEN (F-2) TO THE OFFICE ON THE 26TH FLOOR
On file for this project
30 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON CELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
21 documents · 1 drawing sheet
Plumbing work to include Installation of new water heater, plumbing roughing to new lavatory and new water closet. Sprinkler work to include minor modifications to the existing system. No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 5 filings on this floor.
Floor 1Solow Realty & Development Company, LLC13p · 14 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
SPRINKLER MODIFICATIONS TAKING PLACE ON SC#2 (3B MKT), SC#1 (2B MKT), CEL (1B MKT) & 1ST Fl AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 3 drawing sheets
GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 14 filings on this floor.
MezzanineSolow Realty & Development Company, LLC26p · 1 filing · 20 docs
Architecture
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE/ ADDITION OF ACCESSORY COMMERCIAL KITCHEN (F-2) TO THE OFFICE ON THE 26TH FLOOR
On file for this project
30 documents
CellarCoatue Management, Davidson KempnerUnder Construction198p · 31 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
SPRINKLER MODIFICATIONS TAKING PLACE ON CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) FOR CHANGE OF USE - OFFICE WITH ACCESSORY EXERCISE ROOM AND COMMERCIAL KITCHEN
On file for this project
10 documents
GENERAL CONSTRUCTION TAKING PLACE ON CELLAR AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 25 filings on this floor.
Sub-CellarChanelUnder Construction144p · 16 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
SPRINKLER MODIFICATIONS TAKING PLACE AT CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
MECHANICAL MODIFICATIONS TAKING PLACE ON SUB-CELLAR #1 (MARKETING B-2) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
GENERAL CONSTRUCTION TAKING PLACE ON SUB-CELLAR #1 (B-2 MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
14 documents
Latest 3 of 16 filings on this floor.
BasementSolow Realty & Development Company, LLC1p · 1 filing · 8 docs
Architecture
GENERAL CONSTRUCTION TAKING PLACE AT CELLAR, SUB-CELLAR, AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Sub-BasementSolow Management Corporation34p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON CELLAR, SUB-CELLAR, AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
28 documents
INCLUDING BUT NOT LIMITED TO ADDITION OF NEW WATER & SANITARY LINES AND HOT WATER HEATER PER DESIGN DRAWINGS
On file for this project
8 documents
Renovation of locker room in Basement 1 as per design drawings
On file for this project
5 documents
Latest 3 of 5 filings on this floor.
Site & exteriorSoloviev GroupUnder Construction49p · 7 filings · 19 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 12 drawing sheets
Work includes per filed plans remove/replace cracked stone coping, repair stone panels/copings, sealant joint restoration, replace damaged veneer anchors, repair stucco wall finish, brick replacement, brick stitching repair, brick corner reconstruction.
On file for this project
3 documents · 3 drawing sheets
INSTALLATION OF PYLWOOD FENCE AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 4 drawing sheets