← Back
One story retail building
90-02 ROCKAWAY BEACH BLVD
QUEENS · Rockaway Beach-Arverne-Edgemere · BIN 4448992
💬 Discuss this project
1930Year Built
1Stories
K1Building Class
R5BZoning
2,500 sfGross Floor Area
3Units
2 Open Violations ▸FDNY Report ↗
One story retail building · Owner of record: BEACH 90TH STREET REALTY CORP · 5,000 sf lot · 0.5 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbing
Floor 111p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO LLC1903/22/2026
BEACH 90TH STREET REALTY CORP1503/22/2026
KTC DESIGN GROUP103/22/2026
TIN SHING REALTY103/22/2026
GOLD REALTY AND MANAGEMENT INC403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIAN YANG101/09/2025
JIMENEZ BUILDING CONSULTING LLC809/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE1603/21/2026
SD DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WINWAY DEVELOPMENT LLCGeneral Contractor903/21/2026
SPLEN CONSTRUCTION INCGeneral Contractor303/21/2026
A.C. MORGAN ELECTRICElectrical103/22/2026
COBOT PLUMBING AND HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376801/09/2025
JIMENEZ BUILDING CONSULTI7944112/23/2021
Building Lifecycle
All (76)Filed (9)Permit Issued (5)Signed Off (3)Violation (17)Inspection (6)Objection (6)Special Inspection (30)
01/23/2025
Permit issued — General Construction
Q01163993-I1-GC
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection resolved — Addressed
01/21/2025
Objection resolved — Addressed
01/15/2025
Objection raised — Scope
01/15/2025
Objection raised — Admin
01/14/2025
Objection raised — Scope
01/09/2025
Filed — Alteration
Q01163993-I1
01/10/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. CEILING, FLOORING, PARTITION & STORE FRONT WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00488147-I1
01/10/2023
Signed off — Alteration
APPLICATION FILE TO REMOVE ONE (1) ILLUMINATED SIGNS AT OSP. REMEDY TO CURE THE ECB VIOLATIONS: #35325549K. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00532154-I1
01/10/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER JOB #:Q00488147. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00612673-I1
11/01/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/06/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/23/2022
Special inspection requirement — Fenestration areas
Jian Yang
09/23/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
09/23/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Jian Yang
09/23/2022
Special inspection requirement — Interior lighting power
Jian Yang
09/23/2022
Special inspection requirement — Maintenance information
Jian Yang
09/23/2022
Special inspection requirement — Air barrier - visual inspection
Jian Yang
09/23/2022
Special inspection requirement — Fenestration air leakage
Jian Yang
09/23/2022
Special inspection requirement — Lighting controls
Jian Yang
09/23/2022
Special inspection requirement — Exterior lighting power
Jian Yang
09/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
09/15/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. CEILING, FLOORING, PARTITION & STORE FRONT WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00488147-P2
09/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
09/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
09/14/2022
Special inspection requirement — Exterior lighting power
Jian Yang
09/14/2022
Special inspection requirement — Maintenance information
Jian Yang
09/14/2022
Special inspection requirement — Lighting controls
Jian Yang
09/14/2022
Special inspection requirement — Fenestration air leakage
Jian Yang
09/14/2022
Special inspection requirement — Interior lighting power
Jian Yang
09/14/2022
Special inspection requirement — Air barrier - visual inspection
Jian Yang
09/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Jian Yang
09/14/2022
Special inspection requirement — Fenestration areas
Jian Yang
09/02/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER JOB #:Q00488147. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00612673-P2
09/02/2022
Filed — Alteration
APPLICATION FILE TO REMOVE ONE (1) ILLUMINATED SIGNS AT OSP. REMEDY TO CURE THE ECB VIOLATIONS: #35325549K. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00532154-P1
09/02/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. CEILING, FLOORING, PARTITION & STORE FRONT WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00488147-P1
09/02/2022
Special inspection requirement — Maintenance information
Jian Yang
09/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
09/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
09/02/2022
Special inspection requirement — Fenestration air leakage
Jian Yang
09/02/2022
Special inspection requirement — Air barrier - visual inspection
Jian Yang
09/02/2022
Special inspection requirement — Lighting controls
Jian Yang
09/02/2022
Special inspection requirement — Fenestration areas
Jian Yang
09/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Jian Yang
09/02/2022
Special inspection requirement — Exterior lighting power
Jian Yang
09/02/2022
Special inspection requirement — Interior lighting power
Jian Yang
03/23/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/23/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/05/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/23/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER JOB #:Q00488147. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00612673-P1
12/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2021
Permit issued — Plumbing
Q00612673-I1-PL
10/15/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER JOB #:Q00488147. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00612673-I1
10/08/2021
Permit issued — General Construction
Q00488147-I1-GC
08/17/2021
Permit issued — General Construction
Q00532154-I1-GC
08/17/2021
Permit issued — General Construction
Q00488147-I1-GC
06/04/2021
Filed — Alteration
APPLICATION FILE TO REMOVE ONE (1) ILLUMINATED SIGNS AT OSP. REMEDY TO CURE THE ECB VIOLATIONS: #35325549K. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00532154-I1
03/24/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON 1ST FLOOR. CEILING, FLOORING, PARTITION & STORE FRONT WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
Q00488147-I1
07/11/2020
Violation issued (ECB, closed)
Construction
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWINWAY DEVELOPMENT LLC01/23/2025
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN11/03/2021
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC10/08/2021
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC08/17/2021
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC08/17/2021
BISEQISSUEDSPLEN CONSTRUCTION INC10/04/2021
BISEQISSUEDYX CONSTRUCTION INC09/29/2020
BISEQISSUEDKTC DESIGN GROUP INC03/26/2019
BISPLISSUEDCOBOT PLUMBING AND HEATING INC08/06/2018
BISOTISSUEDKTC DESIGN GROUP INC02/27/2018
BISOTISSUEDKTC DESIGN GROUP INC02/27/2018
BISEQISSUEDKTC DESIGN GROUP INC02/14/2018
BISOTISSUEDKTC DESIGN GROUP INC12/19/2017
BISPLISSUEDS & L PLUMBING INC12/19/2017
BISOTISSUEDKTC DESIGN GROUP INC12/19/2017
BISEQISSUEDMALAK BROWNSTONE RESTORATION06/13/2014
BISEQISSUEDBALLAL HOSSAIN06/28/2013
BISPLISSUEDFINEST MECHANICAL CORP08/11/2011
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM01/14/1998
BISFPISSUEDMASTER FIRE PREVENTION03/16/1992
1 project · most recent 03/24/2022
General Wiring
FiledStatusContractorScope
03/24/2022CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/01/2022Pass-Final General Construction Non-Directive 14PassView ↗
10/06/2022Fail-Final General Construction Non-Directive 14FailView ↗
03/23/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/23/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
09/23/2022Fenestration areasJian Yangenergy_progress
09/23/2022Energy Code Compliance InspectionsJian Yangprogress
09/23/2022Fenestration and door U-factor and product ratingsJian Yangenergy_progress
09/23/2022Interior lighting powerJian Yangenergy_progress
09/23/2022Maintenance informationJian Yangenergy_progress
09/23/2022Air barrier - visual inspectionJian Yangenergy_progress
09/23/2022Fenestration air leakageJian Yangenergy_progress
09/23/2022Lighting controlsJian Yangenergy_progress
09/23/2022Exterior lighting powerJian Yangenergy_progress
09/23/2022Fire-Resistant Penetrations and JointsJian Yangspecial
09/14/2022Fire-Resistant Penetrations and JointsJian Yangspecial
09/14/2022Energy Code Compliance InspectionsJian Yangprogress
09/14/2022Exterior lighting powerJian Yangenergy_progress
09/14/2022Maintenance informationJian Yangenergy_progress
09/14/2022Lighting controlsJian Yangenergy_progress
09/14/2022Fenestration air leakageJian Yangenergy_progress
09/14/2022Interior lighting powerJian Yangenergy_progress
09/14/2022Air barrier - visual inspectionJian Yangenergy_progress
09/14/2022Fenestration and door U-factor and product ratingsJian Yangenergy_progress
09/14/2022Fenestration areasJian Yangenergy_progress
09/02/2022Maintenance informationJian Yangenergy_progress
09/02/2022Fire-Resistant Penetrations and JointsJian Yangspecial
09/02/2022Energy Code Compliance InspectionsJian Yangprogress
09/02/2022Fenestration air leakageJian Yangenergy_progress
09/02/2022Air barrier - visual inspectionJian Yangenergy_progress
Latest 25 of 36.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00488147-P2Request digital key ↗
08/27/2026Q00488147-I1Request digital key ↗
08/27/2026Q00488147-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits36
▸BISPLAN / WORK APPROVAL APPLICATION21
12/23/2025421585911Open ↗
10/14/2025421585911Open ↗
10/09/2025421585911Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION13
10/07/2021420861188Open ↗
10/19/2020420861188Open ↗
03/28/2019420861188Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
02/18/2026421584208Open ↗
12/10/2013440110871Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00488147-P2Open ↗
08/27/2026Q00488147-P1Open ↗
08/27/2026Q00488147-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/19/2026Q00488147-P2Open ↗
09/19/2026Q00488147-P2Open ↗
08/26/2026Q00488147-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/21/2017421584208Open ↗
12/21/2017421585911Open ↗
06/29/2013420861188Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/19/2026Q00488147-P2Open ↗
08/26/2026Q00488147-P1Open ↗
08/24/2026Q00612673-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
12/21/2017421584208Open ↗
12/21/2017421585911Open ↗
06/29/2013420861188Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/21/2017421584208Open ↗
12/21/2017421585911Open ↗
11/16/2013440110871Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/16/2013440110871Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/16/2013440110871Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/29/2013420861188Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
06/01/2011420361762Open ↗
08/15/2008410152702Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/21/2017421584208Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
12/21/2017421584208Open ↗
12/21/2017421585911Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/21/2015421227176Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026Q00488147-P2Open ↗
08/27/2026Q00488147-P1Open ↗
08/27/2026Q00488147-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/21/2017421584208Open ↗
12/21/2017421585911Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/01/2011420361762Open ↗
08/15/2008410152702Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
06/29/2013420861188Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/16/2013440110871Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/21/2017421584208Open ↗
12/21/2017421585911Open ↗
06/29/2013420861188Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00488147-I1Open ↗
08/13/2026Q00612673-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/13/2025420861188Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/23/2014420652635Open ↗
11/16/2013440110871Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS4
10/21/2015421227176Open ↗
06/29/2013420861188Open ↗
06/01/2011420361762Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/24/2025421227176Open ↗
10/19/2020420861188Open ↗
06/23/2014420861188Open ↗
▸BISSUPERSEDING LETTER2
10/19/2020420861188Open ↗
09/05/2018421584208Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/14/2025420861188Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/21/2017421584208Open ↗
12/21/2017421585911Open ↗
11/16/2013440110871Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET8
12/21/2017421584208Open ↗
12/21/2017421584208Open ↗
12/21/2017421585911Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION4
10/21/2025421585911Open ↗
10/17/2018421585911Open ↗
02/08/2018420861188Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
10/19/2020420861188Open ↗
02/22/2018420861188Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/16/2013440110871Open ↗
▸Other Documents2
▸BISUnknown1
10/07/2021420861188Open ↗
▸BISPLOT DIAGRAM1
10/23/2014420652635Open ↗