← Back
Two family converted from one family
90-10 69 AVENUE
QUEENS · BIN 4076741
💬 Discuss this project
1930Year Built
2.5Stories
B3Building Class
R3AZoning
1,648 sfGross Floor Area
2Units
Two family converted from one family · 2,600 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof2p · 1 filing · 11 docs
Floor 11p · 1 filing · 11 docs
Cellar1p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEDINA DESIGN & DEVELOPMENT GROUP103/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEDINA DESIGN & DEV GROUPGeneral Contractor107/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEDINA-YAN ENGINEERING CO8637103/23/2026
Building Lifecycle
All (20)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (17)
06/30/2026
Signed off — Alteration
NEW CELLAR ENTRANCE, ATTIC DORMER, AND REAR YARD ENHANCEMENTS
Q01373082-I1
06/29/2026
Permit issued — Structural
Q01373082-I1-GC-CX
03/23/2026
Filed — Alteration
NEW CELLAR ENTRANCE, ATTIC DORMER, AND REAR YARD ENHANCEMENTS
Q01373082-I1
03/16/2026
Special inspection requirement — Wood – Seismic Resistance
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Designated Seismic System
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Concrete - Cast-In-Place
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Demolition
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Final
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Preliminary
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Structural Wood Frame
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Fenestration areas
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Maintenance information
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Fenestration air leakage
JUAN MEDINA YAN
03/16/2026
Special inspection requirement — Permanent certificate
JUAN MEDINA YAN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMEDINA DESIGN & DEV GROUP06/29/2026
1 project · most recent 03/23/2026
Concrete Wood
FiledStatusContractorScope
03/23/2026Signed-offMEDINA DESIGN & DEV GROUPConcrete, Wood
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
03/16/2026Wood – Seismic ResistanceJUAN MEDINA YANspecial
03/16/2026Designated Seismic SystemJUAN MEDINA YANspecial
03/16/2026Structural Stability – Alterations of existing buildingsJUAN MEDINA YANspecial
03/16/2026Concrete - Cast-In-PlaceJUAN MEDINA YANspecial
03/16/2026Construction Operations Influencing Adjacent StructuresJUAN MEDINA YANspecial
03/16/2026DemolitionJUAN MEDINA YANspecial
03/16/2026Fire-Resistant Penetrations and JointsJUAN MEDINA YANspecial
03/16/2026FinalJUAN MEDINA YANprogress
03/16/2026Energy Code Compliance InspectionsJUAN MEDINA YANprogress
03/16/2026Fire-Resistance Rated ConstructionJUAN MEDINA YANprogress
03/16/2026PreliminaryJUAN MEDINA YANprogress
03/16/2026Structural Wood FrameJUAN MEDINA YANprogress
03/16/2026Fenestration and door U-factor and product ratingsJUAN MEDINA YANenergy_progress
03/16/2026Fenestration areasJUAN MEDINA YANenergy_progress
03/16/2026Maintenance informationJUAN MEDINA YANenergy_progress
03/16/2026Fenestration air leakageJUAN MEDINA YANenergy_progress
03/16/2026Permanent certificateJUAN MEDINA YANenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01373082-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01373082-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01373082-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/13/2026Q01373082-I1Open ↗
09/13/2026Q01373082-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/13/2026Q01373082-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01373082-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01373082-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01373082-I1Open ↗
▸DOB NOWPlot Diagram1
08/17/2026Q01373082-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026Q01373082-I1Open ↗