| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01423115 ↗ | 790 EAST 34 STREET BROOKLYN | Alteration | Permit Issued | 07/08/2026 | 07/10/2026 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | RECONSTRUCTION OF FRONT RETAINING WALL |
| B01195725 ↗ | 796 EAST 34 STREET BROOKLYN | Alteration | Permit Issued | 04/16/2025 | 07/08/2026 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | PLUMBING WORK ASSOCIATED WITH REAR TWO-STORY EXTENSION |
| Q01373082 ↗ | 90-10 69 AVENUE QUEENS | Alteration | Signed-off | 03/23/2026 | 06/29/2026 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | NEW CELLAR ENTRANCE, ATTIC DORMER, AND REAR YARD ENHANCEMENTS |
| Q01359525 ↗ | 91-15 VANDERVEER STREET QUEENS | Alteration | Permit Issued | 03/17/2026 | 06/25/2026 | Design MEDINA ENERGY GROUP, LLC Contractor PLUMB-IT MECHANICAL INC | REMODEL OF CELLAR THREE THREE-FIXTURE BATHROOM, AND FIRST-FLOOR KITCHEN |
| Q00850383 ↗ | 86-15 257 STREET QUEENS | Alteration | Permit Issued | 06/30/2023 | 04/20/2026 | Design SHENKER ARCHITECT, PC Contractor CUSTOMBUILT HOMES INC | STRUCTURAL WORK ASSOCIATED WITH VERTICAL EXTENSION |
| Q01269161 ↗ | 45-19 UNION STREET QUEENS | Alteration CO | Permit Issued | 10/14/2025 | 04/17/2026 | Design MEDINA ENERGY GROUP, LLC Contractor PLUMB-IT MECHANICAL INC | PLUMBING WORK ASSOCIATED WITH CONVERSION FROM SINGLE TO TWO-FAMILY |
| Name | Projects together | Most recent |
|---|---|---|
| MEDINA ENERGY GROUP, LLC | 49 | 09/02/2026 |
| SHENKER ARCHITECT, PC | 2 | 12/30/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| MEDINA DESIGN & DEV GROUP | 13 | 09/02/2026 |
| RK BEST CONSTRUCTION INC | 7 | 09/26/2024 |
| PLUMB-IT MECHANICAL INC | 4 | 09/02/2026 |
| CHANDRABALI RAMANAND | 3 | 03/25/2025 |
| ELITE ILLUSION CONSTRUCT | 3 | 03/25/2025 |
| JMR CONSTRUCTION MANAGEME | 3 | 08/28/2024 |
| GOHAR CONSTRUCTION CORP | 2 | 06/18/2026 |
| S.GOOLCHARAN CONSTRUCTION | 2 | 10/10/2025 |
| ALL PRO PLBG & HTG INC | 1 | 01/23/2024 |
| AMM GEN'L CONTRACTING INC | 1 | 12/24/2024 |
| CITY TOP CONSTRUCTION | 1 | 05/02/2024 |
| CUSTOMBUILT HOMES INC | 1 | 12/30/2025 |
| DA CONSTRUCTION INC | 1 | 11/13/2025 |
| EDEN GENERAL CONSTR INC | 1 | 03/02/2024 |
| ENA PLUMBING CORP | 1 | 04/15/2024 |
| FANTASTIC RENOVATIONS & | 1 | 12/30/2025 |
| FIVE BOROUGH NYC LLC | 1 | 01/13/2024 |
| GDO RESTORATIONS INC | 1 | 05/07/2024 |
| GREENBUILD CONST GRP INC | 1 | 04/15/2024 |
| JOHNNY'S P&H CONTRAC INC | 1 | 11/07/2025 |
| M & M PIPING AND HEATING | 1 | 04/10/2026 |
| MILESTONE RESTORATION INC | 1 | 01/04/2024 |
| MOKEN HOME IMPROVEMENT | 1 | 11/07/2025 |
| NEW ERA DEVELOPMENT GROUP | 1 | 07/06/2023 |
| NEXT GENERATION RESTORATI | 1 | 12/24/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| GOHAR CONSTRUCTION CORP. | 3 | 08/12/2026 |
| KINGSTON TROPICAL BAKERY INC | 2 | 09/26/2024 |
| 8924 REALITY LLC | 1 | 05/02/2024 |
| AGILE IMPALA LLC | 1 | 12/24/2024 |
| MUNYC ARCHITECTURE PLLC | 1 | 11/13/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| ND ARCHITECTURE AND DESIGN | 2 | 12/30/2025 |
| BOYD CONSULTING, INC | 1 | 11/13/2025 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B01423115 ↗ | 790 EAST 34 STREET BROOKLYN | Alteration | Permit Issued | 07/08/2026 | 07/10/2026 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | RECONSTRUCTION OF FRONT RETAINING WALL |
| B01195725 ↗ | 796 EAST 34 STREET BROOKLYN | Alteration | Permit Issued | 04/16/2025 | 07/08/2026 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | PLUMBING WORK ASSOCIATED WITH REAR TWO-STORY EXTENSION |
| Q01373082 ↗ | 90-10 69 AVENUE QUEENS | Alteration | Signed-off | 03/23/2026 | 06/29/2026 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | NEW CELLAR ENTRANCE, ATTIC DORMER, AND REAR YARD ENHANCEMENTS |
| Q01359525 ↗ | 91-15 VANDERVEER STREET QUEENS | Alteration | Permit Issued | 03/17/2026 | 06/25/2026 | Design MEDINA ENERGY GROUP, LLC Contractor PLUMB-IT MECHANICAL INC | REMODEL OF CELLAR THREE THREE-FIXTURE BATHROOM, AND FIRST-FLOOR KITCHEN |
| Q00850383 ↗ | 86-15 257 STREET QUEENS | Alteration | Permit Issued | 06/30/2023 | 04/20/2026 | Design SHENKER ARCHITECT, PC Contractor CUSTOMBUILT HOMES INC | STRUCTURAL WORK ASSOCIATED WITH VERTICAL EXTENSION |
| Q01269161 ↗ | 45-19 UNION STREET QUEENS | Alteration CO | Permit Issued | 10/14/2025 | 04/17/2026 | Design MEDINA ENERGY GROUP, LLC Contractor PLUMB-IT MECHANICAL INC | PLUMBING WORK ASSOCIATED WITH CONVERSION FROM SINGLE TO TWO-FAMILY |
| B01346686 ↗ | 569 HART STREET BROOKLYN | Alteration | Signed-off | 01/30/2026 | 04/14/2026 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | FRONT BRICK FACADE REHABILITATION AT THE PARAPET WALL, INCLUDING LINTEL REPLACEMENT. |
| S01141989 ↗ | 788 FOREST AVENUE STATEN ISLAND | New Building | Permit Issued | 12/11/2024 | 04/03/2026 | Design MEDINA ENERGY GROUP, LLC Owner GOHAR CONSTRUCTION CORP. Contractor GOHAR CONSTRUCTION CORP | STRUCTURAL WORK ASSOCIATED WITH BUILDING RECONSTRUCTION |
| B01319415 ↗ | 363 AMBOY STREET BROOKLYN | Alteration | Signed-off | 12/08/2025 | 03/17/2026 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | THE SCOPE OF WORK INCLUDES THE INSTALLATION OF DECORATIVE WOOD SLAT FINISHES ONINTERIOR WALLS AND CEILINGS TO ENHANCE THE ARCHITECTURAL CHAR… |
| Q01269158 ↗ | 45-19 UNION STREET QUEENS | Alteration | Signed-off | 08/14/2025 | 03/09/2026 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | REPLACEMENT OF DEFICIENT MAIN BEAM |
| Q01225821 ↗ | 134-12 JAMAICA AVENUE QUEENS | Alteration | Permit Issued | 10/10/2025 | 02/20/2026 | Design MEDINA ENERGY GROUP, LLC Contractor S.GOOLCHARAN CONSTRUCTION | Structural Repairs, Fireproofing Restoration, and Electrical Upgrades on 1st |
| Q00425123 ↗ | 71-22 LOUBET STREET QUEENS | Alteration | Signed-off | 11/16/2020 | 01/29/2026 | Design MEDINA ENERGY GROUP, LLC Owner MUNYC ARCHITECTURE PLLC Contractor DA CONSTRUCTION INC Filer BOYD CONSULTING, INC | Filing foundation work in conjunction with structural Q00425123 and General construction application Job No: 440412849 for the Renovation of… |
| Q01126150 ↗ | 162-03 142 AVENUE QUEENS | Alteration | Permit Issued | 01/22/2025 | 11/12/2025 | Design MEDINA ENERGY GROUP, LLC Contractor OASIS PLOMO CORP | REHABILITATION OF EXISTING BUILDING DUE TO FIRE DAMAGE & VERTICAL ENLARGEMENT |
| B00955152 ↗ | 1 PAERDEGAT 12 STREET BROOKLYN | Alteration | Signed-off | 11/03/2023 | 11/10/2025 | Design SHENKER ARCHITECT, PC Contractor MEDINA DESIGN & DEV GROUP | No changes to use, occupancy and/or egress, repair brick of facade to address related violation 39096201Z. |
| B01284367 ↗ | 3704 FARRAGUT ROAD BROOKLYN | Alteration | Permit Issued | 09/20/2025 | 10/21/2025 | Design MEDINA ENERGY GROUP, LLC Contractor M & M PIPING AND HEATING | TWO (2) BATHROOM REMODEL AND LAUNDRY ADDITION |
| Q01083316 ↗ | 220-05 135 AVENUE QUEENS | Alteration CO | Permit Issued | 10/24/2024 | 10/01/2025 | Design MEDINA ENERGY GROUP, LLC Contractor JVR PLBG AND HEATING INC | NEW FULL BATHROOM ON THE SECOND-FLOOR AND DRAINAGE SYSTEM. |
| Q01268988 ↗ | 66-46 HULL AVENUE QUEENS | Alteration | Filed — no permit on record | 09/23/2025 | — | Design MEDINA ENERGY GROUP, LLC | — |
| B01058395 ↗ | 16A DUNNE PLACE BROOKLYN | Full Demolition | Permit Issued | 05/29/2024 | 07/24/2025 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | FULL DEMOLITION OF REMAINING STRUCTURE |
| Q01018102 ↗ | 22-41 WHITESTONE EXPWY QUEENS | Alteration | Permit Issued | 04/15/2024 | 07/24/2025 | Design MEDINA ENERGY GROUP, LLC Contractor GREENBUILD CONST GRP INC | PLUMBING WORK FOR ALTERATIONS THROUGHOUT THE FIRST - THIRD FLOOR. |
| Q01198956 ↗ | 238-15 149 AVENUE QUEENS | Alteration | Signed-off | 03/21/2025 | 07/17/2025 | Design MEDINA ENERGY GROUP, LLC Contractor MEDINA DESIGN & DEV GROUP | NEW ROOF OVER EXISTING BALCONY |
| S00977291 ↗ | 791 JEWETT AVENUE STATEN ISLAND | Alteration | Permit Issued | 12/15/2023 | 06/24/2025 | Design MEDINA ENERGY GROUP, LLC Contractor RISING SUN CONSTRUCTION* | CELLAR ENTRANCE, SAW CUTTING FOUNDATION WALL AT EXISTING WINDOW TO ACCOMMODATE NEW DOOR, AND UNDERPINNING. TWO-FIXTURE BATHROOM ADDITION AND… |
| S00928967 ↗ | 788 FOREST AVENUE STATEN ISLAND | New Building | Permit Issued | 11/07/2023 | 06/09/2025 | Design MEDINA ENERGY GROUP, LLC Owner GOHAR CONSTRUCTION CORP. Contractor SUPERIOR PLUMBING & HEATI | PLUMBING WORK ASSOCIATED WITH NEW BUILDING |
| M01085917 ↗ | 122 WEST 97 STREET MANHATTAN | Alteration | Permit Issued | 12/24/2024 | 01/28/2025 | Design MEDINA ENERGY GROUP, LLC Owner AGILE IMPALA LLC Contractor NEXT GENERATION RESTORATI | TWO (2) THREE-FIXTURE BATHROOM, ONE (1) WET BAR AREA (2-FIXTURE) AND LAUNDRY ROOM |
| B01116927 ↗ | 689 BUSHWICK AVENUE BROOKLYN | Alteration | Signed-off | 11/19/2024 | 01/02/2025 | Design MEDINA ENERGY GROUP, LLC Contractor CHANDRABALI RAMANAND | MAIN BEAM REPLACEMENT |
| Q00977618 ↗ | 164-04 119 AVENUE QUEENS | Alteration CO | Permit Issued | 01/23/2024 | 01/02/2025 | Design MEDINA ENERGY GROUP, LLC Contractor ELITE ILLUSION CONSTRUCT | CELLAR: REPLACE BRICK CHIMNEY WITH STEEL, FINISH WITH BATHROOM, STORAGE, UTILITY ROOMS. FIRST FLOOR: REMOVE LAUNDRY, EXPAND BATHROOM, ADD BE… |
| Q00977620 ↗ | 164-04 119 AVENUE QUEENS | Alteration | Permit Issued | 01/23/2024 | 11/06/2024 | Design MEDINA ENERGY GROUP, LLC Contractor ALL PRO PLBG & HTG INC | PLUMBING WORK ASSOCIATED WITH INTERIOR ALTERATIONS OF THE CELLAR, FIRST- AND SECOND-FLOOR, AND ATTIC. |
| B01101337 ↗ | 668 EAST 43 STREET BROOKLYN | Alteration | Signed-off | 08/27/2024 | 11/01/2024 | Design MEDINA ENERGY GROUP, LLC Contractor JMR CONSTRUCTION MANAGEME | REPLACEMENT OF REAR RETAINING WALL |
| B01101344 ↗ | 665 EAST 42 STREET BROOKLYN | Alteration | Signed-off | 08/28/2024 | 11/01/2024 | Design MEDINA ENERGY GROUP, LLC Contractor JMR CONSTRUCTION MANAGEME | REPLACE REAR RETAINING WALL |
| B01101339 ↗ | 667 EAST 42 STREET BROOKLYN | Alteration | Signed-off | 08/26/2024 | 10/30/2024 | Design MEDINA ENERGY GROUP, LLC Contractor JMR CONSTRUCTION MANAGEME | REPLACEMENT OF REAR RETAINING WALL |
| Q01080529 ↗ | 168-13 CRYDERS LANE QUEENS | Alteration | Signed-off | 08/06/2024 | 10/30/2024 | Design MEDINA ENERGY GROUP, LLC Contractor CHANDRABALI RAMANAND | REMOVAL OF REAR EXTENSION |
| X01117395 ↗ | 4000 WHITE PLAINS ROAD BRONX | Alteration | Signed-off | 09/26/2024 | 10/01/2024 | Design MEDINA ENERGY GROUP, LLC Contractor RK BEST CONSTRUCTION INC | INSTALLATION OF MINI-SPLIT HEATING & COOLING SYSTEM ON THE FIRST-FLOOR. |
| X01064440 ↗ | 4000 WHITE PLAINS ROAD BRONX | Alteration | Signed-off | 07/02/2024 | 08/08/2024 | Design MEDINA ENERGY GROUP, LLC Contractor RK BEST CONSTRUCTION INC | NEW MINI-SPLIT SYSTEM INSTALLATION |
| B01039287 ↗ | 8924 FLATLANDS AVENUE BROOKLYN | Alteration | Signed-off | 05/02/2024 | 07/08/2024 | Design MEDINA ENERGY GROUP, LLC Owner 8924 REALITY LLC Contractor CITY TOP CONSTRUCTION | INTERIOR PARTITION OF EXISTING STORE |
| Q01046971 ↗ | 134-12 JAMAICA AVENUE QUEENS | Alteration | Signed-off | 05/15/2024 | 06/24/2024 | Design MEDINA ENERGY GROUP, LLC Contractor S.GOOLCHARAN CONSTRUCTION | MISCELLANEOUS ALTERATIONS TO CLEAR VACATE ORDER |
| B01056928 ↗ | 15A MESEREAU COURT BROOKLYN | Full Demolition | Filed — no permit on record | 05/29/2024 | — | Design MEDINA ENERGY GROUP, LLC | — |
| B01021749 ↗ | 16A DUNNE PLACE BROOKLYN | New Building | Filed — no permit on record | 05/20/2024 | — | Design MEDINA ENERGY GROUP, LLC | — |
| B01021664 ↗ | 16A DUNNE PLACE BROOKLYN | Full Demolition | Filed — no permit on record | 04/03/2024 | — | Design MEDINA ENERGY GROUP, LLC | — |
| Q00998554 ↗ | 2241 HARMAN STREET QUEENS | Alteration | Signed-off | 03/02/2024 | 03/19/2024 | Design MEDINA ENERGY GROUP, LLC Contractor EDEN GENERAL CONSTR INC | LINTEL REPLACEMENT ON FACADE WALLS, INCLUDING GARAGE. |
| Q00944686 ↗ | 107-52 VAN WYCK EXP QUEENS | Alteration | Signed-off | 01/04/2024 | 02/16/2024 | Design MEDINA ENERGY GROUP, LLC Contractor MILESTONE RESTORATION INC | REPLACEMENT OF DEFICIENT PARAPET WALL AND SECOND-FLOOR WINDOW LINTELS |
| S00928948 ↗ | 788 FOREST AVENUE STATEN ISLAND | Full Demolition | Signed-off | 11/02/2023 | 01/02/2024 | Design MEDINA ENERGY GROUP, LLC Owner GOHAR CONSTRUCTION CORP. Contractor GOHAR CONSTRUCTION CORP | DEMOLITION OF EXISTING BUILDING, INCLUDING THE FOUNDATION. |
| Q00555434 ↗ | 92-49 214 STREET QUEENS | Alteration | Permit Issued | 08/30/2021 | 12/08/2023 | Design MEDINA ENERGY GROUP, LLC Contractor TIER 1 MAINTENANCE LLC | Improvements & Alterations of Exterior, Cellar, First-, and Second-Floor |
| B00910206 ↗ | 19 VERMONT STREET BROOKLYN | Alteration | Signed-off | 08/14/2023 | 10/20/2023 | Design MEDINA ENERGY GROUP, LLC Contractor ELITE ILLUSION CONSTRUCT | MAIN BEAM REPLACEMENT |
| B00894668 ↗ | 652 LAFAYETTE AVENUE BROOKLYN | Alteration | Signed-off | 07/06/2023 | 09/21/2023 | Design MEDINA ENERGY GROUP, LLC Contractor NEW ERA DEVELOPMENT GROUP | CELLAR: REPLACEMENT OF EXISTING TIMBER BEAM WITH STEEL I-BEAM. ADDITION OF STEEL BEAM TO SUPPORT STAIRS. DEMOLITION OF CONCRETE SLAB, EXCAVA… |
| Q00924538 ↗ | 91-34 118 STREET QUEENS | Alteration | Signed-off | 09/11/2023 | 09/14/2023 | Design MEDINA ENERGY GROUP, LLC Contractor RK BEST CONSTRUCTION INC | FILLING TO CLEAR PARTIAL VACATE ORDER ISSUED AFTER A TREE STRUCK THE STRUCTURE DURING HURRICANE SANDY. THE WORK INCLUDES PARTIAL DAMAGE TO F… |
| S00905470 ↗ | 791 JEWETT AVENUE STATEN ISLAND | Alteration | Filed — no permit on record | 08/09/2023 | — | Design MEDINA ENERGY GROUP, LLC | — |
| Q00874663 ↗ | 91-34 118 STREET QUEENS | Alteration | Signed-off | 05/16/2023 | 06/20/2023 | Design MEDINA ENERGY GROUP, LLC Contractor RK BEST CONSTRUCTION INC | FILLING TO CLEAR PARTIAL VACATE ORDER ISSUED AFTER A TREE STRUCK THE STRUCTURE DURING HURRICANE SANDY. THE WORK INCLUDES PARTIAL DAMAGE TO F… |
| Q08049097 ↗ | 208-05 100 AVENUE QUEENS | Alteration | Signed-off | 03/30/2023 | 06/09/2023 | Design MEDINA ENERGY GROUP, LLC Contractor ELITE ILLUSION CONSTRUCT | REAR SHED DORMER AT ATTIC AND HEADER REPLACEMENT AT FIRST-FLOOR |
| Q00843760 ↗ | 135-21 220 PLACE QUEENS | Alteration | Signed-off | 03/28/2023 | 04/03/2023 | Design MEDINA ENERGY GROUP, LLC Contractor RK BEST CONSTRUCTION INC | REMOVAL OF CHIMNEY AND RESTORATION WITH 8-INCH STEEL FLUE IN THE CELLAR, FIRST-FLOOR, SECOND-FLOOR, ATTIC & ROOF. REMOVAL OF LOAD-BEARING WA… |
| Q00831753 ↗ | 97-22 134 ROAD QUEENS | Alteration | Signed-off | 02/28/2023 | 03/07/2023 | Design MEDINA ENERGY GROUP, LLC Contractor RK BEST CONSTRUCTION INC | REMOVAL OF LOAD-BEARING WALL & HEADER REPLACEMENT |
| Q08003536 ↗ | 90-28 218 STREET QUEENS | Alteration | Signed-off | 11/19/2022 | 11/29/2022 | Design MEDINA ENERGY GROUP, LLC Contractor RK BEST CONSTRUCTION INC | REAR EXTENSION, INCLUDING THREE-FIXTURE BATHROOM. |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/31/2026 | Maintenance information | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Electric vehicle service equipment requirements | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Lighting controls | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Air barrier — testing | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Interior lighting power | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Air barrier - visual inspection | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Metering | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Insulation placement and R values | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Fenestration areas | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Exterior lighting power | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Fenestration air leakage | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Permanent certificate | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Fenestration and door U-factor and product ratings | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/31/2026 | Fire-Resistance Rated Construction | 788 FOREST AVENUE | JUAN MEDINA YAN | progress |
| 08/31/2026 | Energy Code Compliance Inspections | 788 FOREST AVENUE | JUAN MEDINA YAN | progress |
| 08/31/2026 | Construction Operations Influencing Adjacent Structures | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 08/31/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 08/31/2026 | Structural Stability – Alterations of existing buildings | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 08/31/2026 | Subgrade Inspections | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 08/31/2026 | Fire-Resistant Penetrations and Joints | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 08/31/2026 | Wood – Seismic Resistance | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 08/28/2026 | HVAC-R and service water heating system controls | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/28/2026 | HVAC-R and service water piping design and insulation | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/28/2026 | Metering | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/28/2026 | Permanent certificate | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/28/2026 | HVAC-R and service water heating equipment | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/28/2026 | Maintenance information | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 08/28/2026 | Energy Code Compliance Inspections | 788 FOREST AVENUE | JUAN MEDINA YAN | progress |
| 08/28/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 08/28/2026 | Fire-Resistant Penetrations and Joints | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 08/05/2026 | HVAC-R and service water piping design and insulation | 45-19 UNION STREET | JUAN MEDINA YAN | energy_progress |
| 08/05/2026 | HVAC-R and service water heating system controls | 45-19 UNION STREET | JUAN MEDINA YAN | energy_progress |
| 08/05/2026 | HVAC-R and service water heating equipment | 45-19 UNION STREET | JUAN MEDINA YAN | energy_progress |
| 08/05/2026 | Energy Code Compliance Inspections | 45-19 UNION STREET | JUAN MEDINA YAN | progress |
| 08/05/2026 | Tenant Protection Plan Compliance | 45-19 UNION STREET | JUAN MEDINA YAN | special |
| 08/05/2026 | Fire-Resistant Penetrations and Joints | 45-19 UNION STREET | JUAN MEDINA YAN | special |
| 07/21/2026 | HVAC-R and service water heating equipment | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 07/21/2026 | Metering | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 07/21/2026 | HVAC-R and service water heating system controls | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 07/21/2026 | HVAC-R and service water piping design and insulation | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 07/21/2026 | Permanent certificate | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 07/21/2026 | Maintenance information | 788 FOREST AVENUE | JUAN MEDINA YAN | energy_progress |
| 07/21/2026 | Energy Code Compliance Inspections | 788 FOREST AVENUE | JUAN MEDINA YAN | progress |
| 07/21/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | 788 FOREST AVENUE | JUAN MEDINA YAN | special |
| 06/26/2026 | Mechanical Systems | 796 EAST 34 STREET | JUAN MEDINA YAN | special |
| 06/26/2026 | Fire-Resistant Penetrations and Joints | 796 EAST 34 STREET | JUAN MEDINA YAN | special |
| 06/26/2026 | Final | 796 EAST 34 STREET | JUAN MEDINA YAN | progress |
| 06/26/2026 | Preliminary | 796 EAST 34 STREET | JUAN MEDINA YAN | progress |
| 06/26/2026 | Masonry | 790 EAST 34 STREET | JUAN MEDINA YAN | special |