← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
100 Flatbush Tower Condominium
100 FLATBUSH AVENUE · BIN 3429537
💬 Discuss this project
2021Year Built
44Stories
RMBuilding Class
C6-9Zoning
320,099 sfGross Floor Area
442Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 378 SCHERMERHORN STREET LLC · 12,603 sf lot · 25.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof7p · 3 filings · 20 docs
Bulkhead4p · 3 filings · 20 docs
Floor 446p · 3 filings · 20 docs
Floor 435p · 2 filings · 20 docs
Floor 426p · 3 filings · 20 docs
Floor 418p · 4 filings · 20 docs
Floor 404p · 3 filings · 20 docs
Floor 392p · 2 filings · 20 docs
Floor 382p · 2 filings · 20 docs
Floor 373p · 2 filings · 20 docs
Floor 364p · 3 filings · 20 docs
Floor 357p · 3 filings · 20 docs
Floor 343p · 2 filings · 20 docs
Floor 333p · 2 filings · 20 docs
Floor 323p · 2 filings · 20 docs
Floor 313p · 2 filings · 20 docs
Floor 304p · 3 filings · 20 docs
Floor 293p · 2 filings · 20 docs
Floor 283p · 2 filings · 20 docs
Floor 273p · 2 filings · 20 docs
Floor 264p · 3 filings · 20 docs
Floor 255p · 3 filings · 20 docs
Floor 245p · 4 filings · 20 docs
Floor 232p · 2 filings · 20 docs
Floor 222p · 2 filings · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 202p · 2 filings · 20 docs
Floor 192p · 2 filings · 20 docs
Floor 182p · 2 filings · 20 docs
Floor 172p · 2 filings · 20 docs
Floor 164p · 4 filings · 20 docs
Floor 154p · 4 filings · 20 docs
Floor 149p · 4 filings · 20 docs
Floor 137p · 5 filings · 20 docs
Floor 128p · 7 filings · 20 docs
Floor 118p · 6 filings · 20 docs
Floor 104p · 4 filings · 20 docs
Floor 94p · 4 filings · 20 docs
Floor 83p · 3 filings · 20 docs
Floor 73p · 3 filings · 20 docs
Floor 65p · 4 filings · 20 docs
Floor 59p · 5 filings · 20 docs
Floor 49p · 6 filings · 20 docs
Floor 38p · 6 filings · 20 docs
Floor 29p · 8 filings · 20 docs
Floor 119p · 6 filings · 20 docs
Mezzanine5p · 3 filings · 20 docs
Cellar8p · 6 filings · 20 docs
Sub-Cellar6p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1807/08/2026
ALLOY DEVELOPMENT5807/08/2026
TITAN INDUSTRIAL SERVICES704/09/2026
FLATBUSH THREE LLC203/22/2026
URBAN ATELIER GROUP203/22/2026
TRI BOROUGH SCAFFOLDING303/22/2026
80 FLATBUSH AVENUE1203/22/2026
100 FLATBUSH DEVELOPER203/21/2026
DORIA403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor1107/08/2026
TT MECHANICAL CORPPlumbing707/08/2026
URBAN ATELIER GROUP LLCGeneral Contractor507/08/2026
A F FIRE PROTECTIONPlumbing403/22/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor404/09/2026
TTM GROUP CORPFire Protection307/08/2026
VERICON CONSTRUCTION COGeneral Contractor207/08/2026
EAGLE 1 MECHANICAL, INCPlumbing207/08/2026
ELICC AMERICAS CORPORATIONGeneral Contractor207/08/2026
NATIONAL SIGN LIGHTINGScaffold107/08/2026
A & F FIRE PROTECTION COFire Protection107/08/2026
TT MECHANICALGeneral Contractor103/22/2026
M&T PLBG AND HTG CO., INCPlumbing107/08/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003511/04/2025
SPECIAL TESTING & CONSULT16881804/30/2025
LEO Y LEE ASSOCIATES2481212/28/2022
VALJATO ENGINEERING PC2486107/14/2022
Building Lifecycle
All (231)Filed (63)Permit Issued (36)Signed Off (34)Violation (13)Inspection (25)Objection (30)Special Inspection (30)
02/17/2026
Violation issued (FDNY_ORDER, closed)
01/08/2026
Violation issued (FDNY_ORDER, closed)
12/08/2025
Objection raised — Admin
12/08/2025
Objection raised — Fire_Protection
12/08/2025
Objection raised — Other
12/08/2025
Objection raised — Fire_Protection
12/04/2025
Filed — No Work
B01326471-I1
12/03/2025
Signed off — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-S2
12/02/2025
Signed off — Alteration
Install Chase sign.
B01250720-I1
11/26/2025
Special inspection requirement — Final
JERE MURDOCH
11/24/2025
Filed — Alteration
Install Chase sign.
B01250720-P1
11/18/2025
Signed off — Alteration
B00647318-I1
11/18/2025
Signed off — Alteration
B00173988-I1
11/18/2025
Signed off — Alteration
B00690206-I1
11/18/2025
Signed off — Alteration
Application for material platform filed herein. No change in egress, use, or occupancy.
B00687748-I1
11/18/2025
Signed off — Alteration
B00647320-I1
11/13/2025
Objection resolved — Addressed
11/12/2025
Signed off — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-S1
11/10/2025
Objection raised — Other
11/07/2025
Filed — No Work
B01314238-I1
11/07/2025
Signed off — Alteration
Application for the installation and operation of monorail system and suspended scaffold system. No change in egress, use, or occupancy.
B08037095-I1
11/07/2025
Signed off — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-I1
11/06/2025
Signed off — Alteration
Plumbing work in conjunction w/NB #321595145. NYCECC Compliance provided under NB as energy model.
B00238661-I1
11/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/04/2025
Filed — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-P2
11/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
10/29/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
10/29/2025
Special inspection requirement — Final
Christopher Drutjons
10/29/2025
Special inspection requirement — Shutoff dampers
Christopher Drutjons
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
10/29/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
10/29/2025
Special inspection requirement — Mechanical Systems
Christopher Drutjons
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
10/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/28/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10/23/2025
Signed off — Alteration
B08002886-I1
10/23/2025
Signed off — Alteration
B08003313-I1
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
10/15/2025
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
10/14/2025
Filed — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-P1
10/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/02/2025
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
09/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/08/2025
Permit issued — Sign
B01250720-I1-SG
07/10/2025
Filed — Alteration
Install Chase sign.
B01250720-I1
06/24/2025
Permit issued — Sprinklers
B01198569-S2-EW-SP
06/24/2025
Permit issued — Plumbing
B01198569-S2-PL
05/13/2025
Permit issued — General Construction
B01198569-I1-GC
05/13/2025
Permit issued — Mechanical Systems
B01198569-S1-MS
05/05/2025
Special inspection requirement — HVAC and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2025
Special inspection requirement — HVAC and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
04/30/2025
Filed — Alteration
Plumbing work in conjunction w/NB #321595145. NYCECC Compliance provided under NB as energy model.
B00238661-P2
04/13/2025
Filed — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-S2
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC08/08/2025
DOB NOWSprinklersSigned-offADVANCED AUTO SPR.CO.,INC06/24/2025
DOB NOWPlumbingSigned-offM&T PLBG AND HTG CO., INC06/24/2025
DOB NOWGeneral ConstructionSigned-offVERICON CONSTRUCTION CO05/13/2025
DOB NOWMechanical SystemsSigned-offVERICON CONSTRUCTION CO05/13/2025
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC06/03/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/09/2024
DOB NOWPlumbingSigned-offTT MECHANICAL CORP03/28/2024
DOB NOWStandpipeSigned-offTTM GROUP CORP01/19/2024
DOB NOWGeneral ConstructionSigned-offURBAN ATELIER GROUP LLC01/08/2024
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ11/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC11/15/2023
DOB NOWMechanical SystemsSigned-offURBAN ATELIER GROUP LLC09/14/2023
DOB NOWStandpipeSigned-offTT MECHANICAL CORP09/12/2023
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ08/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offELICC AMERICAS CORPORATIO08/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/17/2023
DOB NOWBoiler EquipmentSigned-offSTUART N SCHWARTZ07/06/2023
DOB NOWConstruction FenceSigned-offCORE SCAFFOLD SYSTEMS INC06/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offELICC AMERICAS CORPORATIO04/26/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC04/06/2023
DOB NOWPlumbingSigned-offTT MECHANICAL CORP03/13/2023
DOB NOWSprinklersSigned-offTTM GROUP CORP02/03/2023
DOB NOWStandpipeSigned-offTT MECHANICAL CORP01/03/2023
DOB NOWStandpipeSigned-offTTM GROUP CORP10/13/2022
DOB NOWStandpipeSigned-offTT MECHANICAL CORP10/12/2022
DOB NOWPlumbingSigned-offEAGLE 1 MECHANICAL, INC09/23/2022
DOB NOWStructuralSigned-offURBAN ATELIER GROUP LLC08/15/2022
DOB NOWPlumbingSigned-offTT MECHANICAL CORP04/12/2022
DOB NOWStandpipeSigned-offTT MECHANICAL CORP01/27/2022
DOB NOWPlumbingSigned-offEAGLE 1 MECHANICAL, INC10/30/2021
DOB NOWConstruction FenceSigned-offTITAN INDUSTRIAL SVC CORP01/21/2021
DOB NOWConstruction FenceSigned-offTITAN INDUSTRIAL SVC CORP02/12/2020
DOB NOWConstruction FenceSigned-offTITAN INDUSTRIAL SVC CORP11/27/2019
DOB NOWConstruction FenceSigned-offTITAN INDUSTRIAL SVC CORP06/12/2019
BIS—ISSUEDURBAN ATELIER GROUP LLC02/09/2026
BIS—ISSUEDURBAN ATELIER GROUP LLC12/11/2024
BIS—ISSUEDURBAN ATELIER GROUP LLC11/08/2024
BIS—ISSUEDURBAN ATELIER GROUP LLC09/05/2024
+ 15 more permits on file
12 projects · most recent 09/04/2025
General Wiring
FiledStatusContractorScope
09/04/2025Permit IssuedTF ELECTRICAL CORPGeneral Wiring
06/10/2025Permit IssuedUNITY ELECTRIC CO. INCGeneral Wiring
06/10/2025CompleteUNITY ELECTRIC CO. INC—
06/14/2024CompleteHORSEPOWER ELECTRIC.&General Wiring
08/21/2022CompleteJAM ELECTRICAL CORP—
08/18/2022CompleteJAM ELECTRICAL CORP—
07/28/2022CompleteSOLAS ELECTRICAL CORP—
07/28/2022CompleteSOLAS ELECTRICAL CORP—
05/05/2022CompleteV. VASS ELECTRIC CORP—
04/13/2022CompleteV. VASS ELECTRIC CORP—
03/28/2022CompleteJAM ELECTRICAL CORP—
05/30/2019CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
11/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/28/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
09/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/17/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/18/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
12/12/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/19/2023Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
08/24/2023Pass-Final SD - Fire PumpPassView ↗
08/16/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/13/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/07/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/08/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 103
DateRequirementInspectorRole
11/26/2025FinalJERE MURDOCHprogress
11/04/2025Tenant Protection Plan Compliance—special
10/29/2025Shutoff dampersChristopher Drutjonsenergy_progress
10/29/2025Maintenance informationChristopher Drutjonsenergy_progress
10/29/2025HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
10/29/2025HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
10/29/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
10/29/2025Mechanical SystemsChristopher Drutjonsspecial
10/29/2025Post-installed AnchorsChristopher Drutjonsspecial
10/29/2025FinalChristopher Drutjonsprogress
10/29/2025HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
10/15/2025Tenant Protection Plan ComplianceChristopher Drutjonsspecial
10/15/2025Sprinkler SystemsChristopher Drutjonsspecial
10/02/2025Sprinkler SystemsChristopher Drutjonsspecial
10/02/2025Tenant Protection Plan Compliance—special
05/05/2025HVAC and service water heating equipment SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/05/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/05/2025HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBASTIAN SETTEDUCATE JR., P.Especial
03/31/2025Tenant Protection Plan ComplianceChristopher Drutjonsspecial
03/20/2025FinalChristopher Drutjonsprogress
08/05/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBASTIAN SETTEDUCATE JR., P.Especial
08/05/2024HVAC and service water heating equipment SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/05/2024HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/05/2024Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
Latest 25 of 103.
▾Documents — 427 on file (BIS + DOB NOW)
▸Plans & Drawings63
▸DOB NOWPlans/Sketch49
09/01/2026B00544999-I1Request digital key ↗
09/01/2026B00544999-P2Request digital key ↗
09/01/2026B00544999-P1Request digital key ↗
Showing 3 of 49 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026B00238661-P1Request digital key ↗
08/25/2026B00238661-I1Request digital key ↗
08/25/2026B00238661-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural3
08/29/2026B00240589-P2Request digital key ↗
08/29/2026B00240589-I1Request digital key ↗
08/29/2026B00240589-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00238659-P2Request digital key ↗
09/02/2026B00238659-P1Request digital key ↗
09/02/2026B00238659-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/15/2026B01314238-I1Request digital key ↗
08/15/2026B01326471-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00173988-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00173968-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00173974-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION27
09/08/2025321595145Open ↗
03/26/2025321595145Open ↗
08/22/2024321595145Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION20
02/10/2026321595145Open ↗
09/13/2024321595145Open ↗
08/30/2024321595145Open ↗
Showing 3 of 20 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM3
09/19/2024321595145Open ↗
08/18/2021321595145Open ↗
Showing 2 of 3 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT V: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/09/2024321595145Open ↗
▸Seals & Professional Certifications117
▸DOB NOWDPL-1: Design Professional Seal & Signature63
09/02/2026B00173968-I1Open ↗
09/02/2026B00173974-I1Open ↗
09/01/2026B00544999-P2Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/23/2026B08046752-I1Open ↗
09/23/2026B00952611-I1Open ↗
09/23/2026B00802913-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026B08046752-I1Open ↗
09/01/2026B01198569-I1Open ↗
08/31/2026B01250720-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/18/2021321595145Open ↗
06/18/2021321595145Open ↗
06/18/2021321595145Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/08/2023340903295Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/11/2024340903295Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/02/2025321595145Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
06/14/2021321595145Open ↗
Showing 1 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
09/27/2022340746081Open ↗
▸BISSTREET TREE SIGNOFF1
04/07/2025321595145Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/14/2021321595145Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
06/02/2023321595145Open ↗
▸Environmental & Asbestos15
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026B01198569-S1Open ↗
08/13/2026B01198569-S2Open ↗
08/13/2026B01198569-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/13/2026B00238661-I1Open ↗
08/13/2026B01198569-S2Open ↗
08/13/2026B01198569-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
06/03/2025340746081Open ↗
07/10/2024340903295Open ↗
05/03/2024321595145Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER1
06/14/2021321595145Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026B00173974-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/08/2023340903295Open ↗
08/24/2023321595145Open ↗
05/25/2021321595145Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/07/2025321595145Open ↗
06/26/2024340903295Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B08046752-I1Open ↗
08/13/2026B00238659-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/10/2024321595145Open ↗
▸BISFENESTRATION AREAS1
07/10/2024321595145Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/10/2024321595145Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/10/2024321595145Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/10/2024321595145Open ↗
▸BISLIGHTING CONTROLS1
07/10/2024321595145Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/18/2021321595145Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00238661-I1Open ↗
▸Inspections & Test Reports45
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER16
05/22/2024321595145Open ↗
05/22/2024321595145Open ↗
05/22/2024321595145Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX11
08/06/2022321595145Open ↗
08/05/2022321595145Open ↗
07/29/2022321595145Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
12/08/2023340903295Open ↗
04/04/2022321595145Open ↗
06/14/2021321595145Open ↗
Showing 3 of 7 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
04/21/2022321595145Open ↗
04/11/2022321595145Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT2
05/22/2024321595145Open ↗
05/22/2024321595145Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/10/2024321595145Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/19/2023321595145Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
11/25/2024321595145Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
01/10/2024321595145Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/01/2023321595145Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs29
▸BISSCHEDULE A - OCCUPANCY / USE12
03/26/2025321595145Open ↗
08/22/2024321595145Open ↗
04/03/2024321595145Open ↗
Showing 3 of 12 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION6
06/30/2021321595145Open ↗
06/30/2021321595145Open ↗
06/14/2021321595145Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/11/2024340903295Open ↗
09/12/2022321595145Open ↗
06/18/2021321595145Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER5
09/13/2024321595145Open ↗
08/30/2024321595145Open ↗
08/22/2022321595145Open ↗
Showing 3 of 5 on file for this type
▸BISBSA/CPC APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE3
09/13/2024321595145Open ↗
01/11/2023321595145Open ↗
06/18/2021321595145Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/18/2021321595145Open ↗
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION22
10/07/2025321595145Open ↗
04/02/2025321595145Open ↗
09/19/2024321595145Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM7
02/10/2026321595145Open ↗
08/22/2022321595145Open ↗
07/29/2022321595145Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/11/2024340903295Open ↗
Showing 1 of 2 on file for this type
▸BISEFILING COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
06/11/2024321595145Open ↗
06/05/2023321595145Open ↗
06/14/2021321595145Open ↗
Showing 3 of 8 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
09/25/2023340746081Open ↗
09/25/2023340746081Open ↗
09/25/2023340746081Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStructural Peer Review Report3
08/13/2026B00240589-P1Open ↗
08/13/2026B00240589-P2Open ↗
08/13/2026B00240589-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
09/25/2023340746081Open ↗
▸BISVESTIBULES1
07/10/2024321595145Open ↗
▸BISBPP-PARKS: REMOVE MATURE TREE1
09/25/2023340746081Open ↗
▸BISBPP-DOT: RELOCATE STREET LIGHT1
07/18/2025340746081Open ↗
▸BISBPP-DOT: SIDEWALK ENCROACHMENT1
09/25/2023340746081Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/10/2024321595145Open ↗
▸BISAIR BARRIER CONTINUITY PLAN1
07/10/2024321595145Open ↗