← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
90 FLATBUSH AVENUE
BROOKLYN · BIN 3429537
💬 Discuss this project
2021Year Built
44Stories
RMBuilding Class
C6-9Zoning
320,099 sfGross Floor Area
442Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 378 Schermerhorn Street · 12,603 sf lot · 25.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsAlloy Development15 filings
RoofHanging rig installation1 filing
Floor 44Elicc Americas CORP1 filing
Floor 43Elicc Americas CORP1 filing
Floor 42Elicc Americas CORP1 filing
Floor 41Elicc Americas CORP3p · 1 filing
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24Alloy Development1p · 1 filing
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15B0 Flatbush Avenue, LLC1 filing
Floor 14B0 Flatbush Avenue, LLC1 filing
Floor 13Alloy Development1p · 2 filings
Floor 12
Floor 11
Floor 10Alloy Development1p · 1 filing
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Chase Bank16p · 6 filings · 20 docs
MezzanineAlloy Development2p · 1 filing
CellarAlloy Development4p · 3 filings
Sub-CellarAlloy Development1p · 1 filing
Site & exteriorChase Bank7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Alloy Development5807/08/2026
80 Flatbush Avenue1203/22/2026
Titan Industrial Services704/09/2026
100 Flatbush Developer203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold1107/08/2026
TT MechanicalPlumbing707/08/2026
Urban Atelier GroupGeneral Contractor507/08/2026
Titan Industrial ServiceScaffold404/09/2026
A F Fire ProtectionPlumbing403/22/2026
TTM GroupFire Protection307/08/2026
Elicc AmericasScaffold207/08/2026
Vericon Construction CoGeneral Contractor207/08/2026
Eagle 1 MechanicalPlumbing207/08/2026
A & F Fire Protection CoFire Protection107/08/2026
V. Vass ElectricElectrical103/22/2026
M&T Plumbing and Heating CoPlumbing107/08/2026
TT MechanicalGeneral Contractor103/22/2026
National MaintenanceSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Milrose Consultants2003511/04/2025
Special Testing & Consulting16881804/30/2025
Leo Y Lee Associates2481212/28/2022
Valjato Engineering2486107/14/2022
Building Lifecycle
All (231)Filed (63)Permit Issued (36)Signed Off (34)Violation (13)Inspection (25)Objection (30)Special Inspection (30)
02/17/2026
Violation issued (FDNY_ORDER, closed)
01/08/2026
Violation issued (FDNY_ORDER, closed)
12/08/2025
Objection raised — Admin
12/08/2025
Objection raised — Fire_Protection
12/08/2025
Objection raised — Other
12/08/2025
Objection raised — Fire_Protection
12/04/2025
Filed — No Work
B01326471-I1
12/03/2025
Signed off — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-S2
12/02/2025
Signed off — Alteration
Install Chase sign.
B01250720-I1
11/26/2025
Special inspection requirement — Final
JERE MURDOCH
11/24/2025
Filed — Alteration
Install Chase sign.
B01250720-P1
11/18/2025
Signed off — Alteration
B00647320-I1
11/18/2025
Signed off — Alteration
B00647318-I1
11/18/2025
Signed off — Alteration
B00173988-I1
11/18/2025
Signed off — Alteration
B00690206-I1
11/18/2025
Signed off — Alteration
Application for material platform filed herein. No change in egress, use, or occupancy.
B00687748-I1
11/13/2025
Objection resolved — Addressed
11/12/2025
Signed off — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-S1
11/10/2025
Objection raised — Other
11/07/2025
Filed — No Work
B01314238-I1
11/07/2025
Signed off — Alteration
Application for the installation and operation of monorail system and suspended scaffold system. No change in egress, use, or occupancy.
B08037095-I1
11/07/2025
Signed off — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-I1
11/06/2025
Signed off — Alteration
Plumbing work in conjunction w/NB #321595145. NYCECC Compliance provided under NB as energy model.
B00238661-I1
11/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/04/2025
Filed — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-P2
11/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/29/2025
Special inspection requirement — Final
Christopher Drutjons
10/29/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
10/29/2025
Special inspection requirement — Mechanical Systems
Christopher Drutjons
10/29/2025
Special inspection requirement — Shutoff dampers
Christopher Drutjons
10/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher Drutjons
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher Drutjons
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher Drutjons
10/29/2025
Special inspection requirement — Maintenance information
Christopher Drutjons
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
10/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/28/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/28/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10/23/2025
Signed off — Alteration
B08003313-I1
10/23/2025
Signed off — Alteration
B08002886-I1
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
10/15/2025
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
10/14/2025
Filed — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-P1
10/02/2025
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
10/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/08/2025
Permit issued — Sign
B01250720-I1-SG
07/10/2025
Filed — Alteration
Install Chase sign.
B01250720-I1
06/24/2025
Permit issued — Sprinklers
B01198569-S2-EW-SP
06/24/2025
Permit issued — Plumbing
B01198569-S2-PL
05/13/2025
Permit issued — General Construction
B01198569-I1-GC
05/13/2025
Permit issued — Mechanical Systems
B01198569-S1-MS
05/05/2025
Special inspection requirement — HVAC and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
05/05/2025
Special inspection requirement — HVAC and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
04/30/2025
Filed — Alteration
Plumbing work in conjunction w/NB #321595145. NYCECC Compliance provided under NB as energy model.
B00238661-P2
04/13/2025
Filed — Alteration
Install HVAC unit and associated equipment for Chase Bank.
B01198569-S2
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNational Maintenance08/08/2025
DOB NOWSprinklersSigned-offAdvanced Automatic Sprinkler Co06/24/2025
DOB NOWPlumbingSigned-offM&T Plumbing and Heating Co06/24/2025
DOB NOWGeneral ConstructionSigned-offVericon Construction Co05/13/2025
DOB NOWMechanical SystemsSigned-offVericon Construction Co05/13/2025
DOB NOWConstruction FenceSigned-offCore Scaffold Systems06/03/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems04/09/2024
DOB NOWPlumbingSigned-offTT Mechanical03/28/2024
DOB NOWSprinklersSigned-offTTM Group01/19/2024
DOB NOWGeneral ConstructionSigned-offUrban Atelier Group01/08/2024
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz11/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems11/15/2023
DOB NOWMechanical SystemsSigned-offUrban Atelier Group09/14/2023
DOB NOWStandpipeSigned-offTT Mechanical09/12/2023
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz08/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offElicc Americas08/07/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/17/2023
DOB NOWBoiler EquipmentSigned-offStuart N Schwartz07/06/2023
DOB NOWConstruction FenceSigned-offCore Scaffold Systems06/12/2023
DOB NOWProtection and Mechanical MethodsSigned-offElicc Americas04/26/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems04/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems04/06/2023
DOB NOWPlumbingSigned-offTT Mechanical03/13/2023
DOB NOWSprinklersSigned-offTTM Group02/03/2023
DOB NOWStandpipeSigned-offTT Mechanical01/03/2023
DOB NOWSprinklersSigned-offTTM Group10/13/2022
DOB NOWStandpipeSigned-offTT Mechanical10/12/2022
DOB NOWPlumbingSigned-offEagle 1 Mechanical09/23/2022
DOB NOWStructuralSigned-offUrban Atelier Group08/15/2022
DOB NOWPlumbingSigned-offTT Mechanical04/12/2022
DOB NOWStandpipeSigned-offTT Mechanical01/27/2022
DOB NOWPlumbingSigned-offEagle 1 Mechanical10/30/2021
DOB NOWConstruction FenceSigned-offTitan Industrial Service01/21/2021
DOB NOWConstruction FenceSigned-offTitan Industrial Service02/12/2020
DOB NOWConstruction FenceSigned-offTitan Industrial Service11/27/2019
DOB NOWConstruction FenceSigned-offTitan Industrial Service06/12/2019
BIS—ISSUEDUrban Atelier Group02/09/2026
BIS—ISSUEDUrban Atelier Group12/11/2024
BIS—ISSUEDUrban Atelier Group11/08/2024
BIS—ISSUEDUrban Atelier Group09/05/2024
+ 15 more permits on file
12 projects · most recent 09/04/2025
General Wiring
FiledStatusContractorScope
09/04/2025Permit IssuedTF ElectricalGeneral Wiring
06/10/2025CompleteUnity Electric Co—
06/10/2025Permit IssuedUnity Electric CoGeneral Wiring
06/14/2024CompleteHorsepower ElectricGeneral Wiring
08/21/2022CompleteJam Electrical—
08/18/2022CompleteJam Electrical—
07/28/2022CompleteSolas Electrical—
07/28/2022CompleteSolas Electrical—
05/05/2022CompleteV. Vass Electric—
04/13/2022CompleteV. Vass Electric—
03/28/2022CompleteJam Electrical—
05/30/2019CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
11/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/28/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/28/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
09/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
01/17/2024Pass-Final General Construction Non-Directive 14PassView ↗
12/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/18/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
12/12/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/19/2023Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
08/24/2023Pass-Final SD - Fire PumpPassView ↗
08/16/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/13/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/07/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/08/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 103
DateRequirementInspectorRole
11/26/2025FinalJERE MURDOCHprogress
11/04/2025Tenant Protection Plan Compliance—special
10/29/2025Post-installed AnchorsChristopher Drutjonsspecial
10/29/2025FinalChristopher Drutjonsprogress
10/29/2025HVAC-R and service water piping design and insulationChristopher Drutjonsenergy_progress
10/29/2025Shutoff dampersChristopher Drutjonsenergy_progress
10/29/2025HVAC-R and service water heating system controlsChristopher Drutjonsenergy_progress
10/29/2025HVAC-R and service water heating equipmentChristopher Drutjonsenergy_progress
10/29/2025Maintenance informationChristopher Drutjonsenergy_progress
10/29/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
10/29/2025Mechanical SystemsChristopher Drutjonsspecial
10/15/2025Sprinkler SystemsChristopher Drutjonsspecial
10/15/2025Tenant Protection Plan ComplianceChristopher Drutjonsspecial
10/02/2025Tenant Protection Plan Compliance—special
10/02/2025Sprinkler SystemsChristopher Drutjonsspecial
05/05/2025HVAC and service water heating equipment SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
05/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBASTIAN SETTEDUCATE JR., P.Especial
05/05/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
05/05/2025HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
03/31/2025Tenant Protection Plan ComplianceChristopher Drutjonsspecial
03/20/2025FinalChristopher Drutjonsprogress
08/05/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSEBASTIAN SETTEDUCATE JR., P.Especial
08/05/2024HVAC and service water heating equipment SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/05/2024HVAC and service water heating system controls SEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
08/05/2024Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
Latest 25 of 103.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Chase BankBank / Financial branchFloor 1
Project B01250720 Alteration · LOC Issued · 07/10/2025
Project B01198569 Alteration · LOC Issued · 04/10/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 427 on file (BIS + DOB NOW)
▸Plans & Drawings63
▸DOB NOWPlans/Sketch49
09/01/2026B00544999-I1Request digital key ↗
09/01/2026B00544999-P2Request digital key ↗
09/01/2026B00544999-P1Request digital key ↗
Showing 3 of 49 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026B00238661-P1Request digital key ↗
08/25/2026B00238661-I1Request digital key ↗
08/25/2026B00238661-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural3
08/29/2026B00240589-P1Request digital key ↗
08/29/2026B00240589-P2Request digital key ↗
08/29/2026B00240589-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00238659-P2Request digital key ↗
09/02/2026B00238659-P1Request digital key ↗
09/02/2026B00238659-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/15/2026B01314238-I1Request digital key ↗
08/15/2026B01326471-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00173988-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00173968-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00173974-I1Request digital key ↗
▸Applications & Permits47
▸BISPLAN / WORK APPROVAL APPLICATION27
09/08/2025321595145Open ↗
03/26/2025321595145Open ↗
08/22/2024321595145Open ↗
Showing 3 of 27 on file for this type
▸BISWORK PERMIT APPLICATION20
02/10/2026321595145Open ↗
09/13/2024321595145Open ↗
08/30/2024321595145Open ↗
Showing 3 of 20 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM3
09/19/2024321595145Open ↗
08/18/2021321595145Open ↗
Showing 2 of 3 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT V: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
04/09/2024321595145Open ↗
▸Seals & Professional Certifications117
▸DOB NOWDPL-1: Design Professional Seal & Signature63
09/02/2026B00173968-I1Open ↗
09/02/2026B00173974-I1Open ↗
09/01/2026B00544999-P2Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/23/2026B08046752-I1Open ↗
09/23/2026B00952611-I1Open ↗
09/23/2026B00802913-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026B08046752-I1Open ↗
09/01/2026B01198569-I1Open ↗
08/31/2026B01250720-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/18/2021321595145Open ↗
06/18/2021321595145Open ↗
06/18/2021321595145Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/08/2023340903295Open ↗
Showing 1 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/11/2024340903295Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/02/2025321595145Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
06/14/2021321595145Open ↗
Showing 1 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
09/27/2022340746081Open ↗
▸BISSTREET TREE SIGNOFF1
04/07/2025321595145Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/14/2021321595145Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
06/02/2023321595145Open ↗
▸Environmental & Asbestos15
▸DOB NOWOER: Notice of Satisfaction4
08/13/2026B01198569-S2Open ↗
08/13/2026B01198569-I1Open ↗
08/13/2026B01198569-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed4
08/13/2026B01198569-S1Open ↗
08/13/2026B01198569-I1Open ↗
08/13/2026B00238661-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
06/03/2025340746081Open ↗
07/10/2024340903295Open ↗
05/03/2024321595145Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER1
06/14/2021321595145Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026B00173974-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/08/2023340903295Open ↗
08/24/2023321595145Open ↗
05/25/2021321595145Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/07/2025321595145Open ↗
06/26/2024340903295Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B08046752-I1Open ↗
08/13/2026B00238659-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/10/2024321595145Open ↗
▸BISFENESTRATION AREAS1
07/10/2024321595145Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
07/10/2024321595145Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
07/10/2024321595145Open ↗
▸BISLIGHTING IN DWELLING UNITS1
07/10/2024321595145Open ↗
▸BISLIGHTING CONTROLS1
07/10/2024321595145Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/18/2021321595145Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00238661-I1Open ↗
▸Inspections & Test Reports45
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER16
05/22/2024321595145Open ↗
05/22/2024321595145Open ↗
05/22/2024321595145Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX11
08/06/2022321595145Open ↗
08/05/2022321595145Open ↗
07/29/2022321595145Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
12/08/2023340903295Open ↗
04/04/2022321595145Open ↗
06/14/2021321595145Open ↗
Showing 3 of 7 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
04/21/2022321595145Open ↗
04/11/2022321595145Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT2
05/22/2024321595145Open ↗
05/22/2024321595145Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/10/2024321595145Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/19/2023321595145Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
11/25/2024321595145Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
01/10/2024321595145Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/01/2023321595145Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs29
▸BISSCHEDULE A - OCCUPANCY / USE12
03/26/2025321595145Open ↗
08/22/2024321595145Open ↗
04/03/2024321595145Open ↗
Showing 3 of 12 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION6
06/30/2021321595145Open ↗
06/30/2021321595145Open ↗
06/14/2021321595145Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/11/2024340903295Open ↗
09/12/2022321595145Open ↗
06/18/2021321595145Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER5
09/13/2024321595145Open ↗
08/30/2024321595145Open ↗
08/22/2022321595145Open ↗
Showing 3 of 5 on file for this type
▸BISBSA/CPC APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE3
09/13/2024321595145Open ↗
01/11/2023321595145Open ↗
06/18/2021321595145Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/18/2021321595145Open ↗
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION22
10/07/2025321595145Open ↗
04/02/2025321595145Open ↗
09/19/2024321595145Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM7
02/10/2026321595145Open ↗
08/22/2022321595145Open ↗
07/29/2022321595145Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/11/2024340903295Open ↗
Showing 1 of 2 on file for this type
▸BISEFILING COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents22
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
06/11/2024321595145Open ↗
06/05/2023321595145Open ↗
06/14/2021321595145Open ↗
Showing 3 of 8 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
09/25/2023340746081Open ↗
09/25/2023340746081Open ↗
09/25/2023340746081Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStructural Peer Review Report3
08/13/2026B00240589-P2Open ↗
08/13/2026B00240589-P1Open ↗
08/13/2026B00240589-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
09/25/2023340746081Open ↗
▸BISVESTIBULES1
07/10/2024321595145Open ↗
▸BISBPP-PARKS: REMOVE MATURE TREE1
09/25/2023340746081Open ↗
▸BISBPP-DOT: RELOCATE STREET LIGHT1
07/18/2025340746081Open ↗
▸BISBPP-DOT: SIDEWALK ENCROACHMENT1
09/25/2023340746081Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
07/10/2024321595145Open ↗
▸BISAIR BARRIER CONTINUITY PLAN1
07/10/2024321595145Open ↗