Office with commercial, 1-6 stories
90 LUDLOW STREET
MANHATTAN · BIN 1082501
💬 Discuss this project
1920Year Built
5Stories
O5Building Class
C6-1Zoning
18,319 sfGross Floor Area
7Units
1 Open Violation ▸
Office with commercial, 1-6 stories · Owner of record: 90 LUDLOW REAL ESTATE LLC · 4,170 sf lot · 4.39 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Floor 524p · 2 filings · 20 docs
Floor 425p · 2 filings · 20 docs
Floor 332p · 2 filings · 20 docs
Floor 223p · 2 filings · 20 docs
Floor 123p · 2 filings · 20 docs
Cellar22p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
90 LUDLOW REAL ESTATE5407/08/2026
HALSTEAD MANAGEMENT303/22/2026
S L LUDLOW REALTY1403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/06/2024$8.5M—S&L LUDLOW REALTY INC. → 90 LUDLOW REAL ESTATE LLC$464/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S M TAM ARCHITECT, PLLC512/22/2025
BARRY DONALDSON ARCHITECTS1004/21/2025
ALL CITY ENGINEERING P.C.204/16/2025
SALVATOR A. CARADONNA JR.112/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M TAM ARCHITECT1003/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
IBUILD CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MODERN DESIGN GEN CONTRGeneral Contractor1107/08/2026
PRIMROSE SERVICE INCGeneral Contractor303/21/2026
TRUEBLUE CONSTRUCTION LLCGeneral Contractor303/21/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
JEONG YUNGElectrical103/21/2026
TJ SIGNS UNLIMITEDScaffold107/08/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection107/08/2026
CROSSFIELD PLBG HTGPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GLOBAL ARCH DESIGN & BUIL33971412/22/2025
YANG ENGINEERING LLC8376101/17/2025
Building Lifecycle
All (115)Filed (17)Permit Issued (10)Signed Off (8)Violation (23)Inspection (15)Objection (12)Special Inspection (30)
02/10/2026
Signed off — Alteration CO
Minor partition work at 5th floor as per plan. Storefront work at 1st floor. Proposed change of use & occupancy. Obtain new Certificate of Occupancy
M01091472-I1
01/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
NITHIN JOHN
01/01/2026
Special inspection requirement — Interior lighting power
NITHIN JOHN
01/01/2026
Special inspection requirement — Fenestration areas
NITHIN JOHN
01/01/2026
Special inspection requirement — Lighting controls
NITHIN JOHN
01/01/2026
Special inspection requirement — Air barrier - visual inspection
NITHIN JOHN
01/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
NITHIN JOHN
01/01/2026
Special inspection requirement — Fenestration air leakage
NITHIN JOHN
01/01/2026
Special inspection requirement — Energy Code Compliance Inspections
NITHIN JOHN
01/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NITHIN JOHN
12/22/2025
Filed — Alteration CO
Minor partition work at 5th floor as per plan. Storefront work at 1st floor. Proposed change of use & occupancy. Obtain new Certificate of Occupancy
M01091472-P5
12/22/2025
Special inspection requirement — Fenestration air leakage
NITHIN JOHN
12/22/2025
Special inspection requirement — Lighting controls
NITHIN JOHN
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
NITHIN JOHN
12/22/2025
Special inspection requirement — Interior lighting power
NITHIN JOHN
12/22/2025
Special inspection requirement — Air barrier - visual inspection
NITHIN JOHN
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NITHIN JOHN
12/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
NITHIN JOHN
12/22/2025
Special inspection requirement — Fenestration areas
NITHIN JOHN
12/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NITHIN JOHN
11/26/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/05/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2025
Filed — Alteration CO
Minor partition work at 5th floor as per plan. Storefront work at 1st floor. Proposed change of use & occupancy. Obtain new Certificate of Occupancy
M01091472-P4
08/08/2025
Special inspection requirement — Fenestration air leakage
NITHIN JOHN
08/08/2025
Special inspection requirement — Air barrier - visual inspection
NITHIN JOHN
08/08/2025
Special inspection requirement — Lighting controls
NITHIN JOHN
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NITHIN JOHN
08/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NITHIN JOHN
08/08/2025
Special inspection requirement — Fenestration areas
NITHIN JOHN
08/08/2025
Special inspection requirement — Energy Code Compliance Inspections
NITHIN JOHN
08/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
NITHIN JOHN
08/08/2025
Special inspection requirement — Interior lighting power
NITHIN JOHN
07/28/2025
Signed off — Alteration
REMOVAL OF NON-LOAD BEARING PARTITION IN EXISTING COMMERCIAL BUILDING AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01026641-I1
07/25/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/12/2025
Signed off — Alteration
Proposed mechanical work at floors 001 to Roof as per plans. No change in use, egress, or occupancy.
M01059700-I1
06/10/2025
Signed off — Alteration
Proposed mechanical work at floors 001 to Roof as per plans. No change in use, egress, or occupancy.
M01059700-S4
06/10/2025
Signed off — Alteration CO
Minor partition work at 5th floor as per plan. Storefront work at 1st floor. Proposed change of use & occupancy. Obtain new Certificate of Occupancy
M01091472-S3
05/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2025
Filed — Alteration CO
Minor partition work at 5th floor as per plan. Storefront work at 1st floor. Proposed change of use & occupancy. Obtain new Certificate of Occupancy
M01091472-P3
05/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/09/2025
Special inspection requirement — Fenestration areas
NITHIN JOHN
05/09/2025
Special inspection requirement — Fenestration air leakage
NITHIN JOHN
05/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NITHIN JOHN
05/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/07/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/29/2025
Objection resolved — Addressed
04/28/2025
Objection raised — Scope
04/24/2025
Signed off — Alteration
Proposed mechanical work at floors 001 to Roof as per plans. No change in use, egress, or occupancy.
M01059700-S2
04/21/2025
Filed — Alteration
Proposed mechanical work at floors 001 to Roof as per plans. No change in use, egress, or occupancy.
M01059700-P4
04/18/2025
Signed off — Alteration
Proposed mechanical work at floors 001 to Roof as per plans. No change in use, egress, or occupancy.
M01059700-S1
04/16/2025
Filed — Alteration
Proposed mechanical work at floors 001 to Roof as per plans. No change in use, egress, or occupancy.
M01059700-P3
04/16/2025
Filed — Alteration CO
Minor partition work at 5th floor as per plan. Storefront work at 1st floor. Proposed change of use & occupancy. Obtain new Certificate of Occupancy
M01091472-P2
03/20/2025
Permit issued — Sprinklers
M01091472-S3-EW-SP
03/14/2025
Filed — Alteration CO
Minor partition work at 5th floor as per plan. Storefront work at 1st floor. Proposed change of use & occupancy. Obtain new Certificate of Occupancy
M01091472-P1
03/14/2025
Filed — Alteration
Proposed mechanical work at floors 001 to Roof as per plans. No change in use, egress, or occupancy.
M01059700-P2
03/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2025
Filed — Alteration
Proposed mechanical work at floors 001 to Roof as per plans. No change in use, egress, or occupancy.
M01059700-P1
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP03/20/2025
DOB NOWGeneral ConstructionSigned-offMODERN DESIGN GEN CONTR02/12/2025
DOB NOWGeneral ConstructionPermit IssuedMODERN DESIGN GEN CONTR01/09/2025
DOB NOWGeneral ConstructionSigned-offMODERN DESIGN GEN CONTR01/07/2025
DOB NOWGeneral ConstructionSigned-offMODERN DESIGN GEN CONTR01/06/2025
DOB NOWMechanical SystemsSigned-offMODERN DESIGN GEN CONTR11/14/2024
DOB NOWPlumbingSigned-offDW PLUMBING INC09/06/2024
DOB NOWGeneral ConstructionSigned-offTRUEBLUE CONSTRUCTION LLC06/10/2024
DOB NOWGeneral ConstructionSigned-offPRIMROSE SERVICE INC04/04/2024
DOB NOWSignSigned-offAMERICAN SIGN & ELECL CON12/30/2019
BISOTISSUEDALBA SERVICES INC01/08/2018
BISPLISSUEDK & BH PLUMBING & HTG INC08/19/2010
BISPLISSUEDS & L PLUMBING INC06/03/2010
BISOTISSUEDSIX STAR 159 INC05/07/2010
BISPLISSUEDK & BH PLUMBING & HTG INC11/22/2005
BIS—ISSUEDNEW HANG DAR CONSTRUCTION11/17/2005
BISEQISSUEDNEW HANG DAR CONSTRUCTION11/17/2005
BISMHISSUEDLICO AIR COND07/13/2005
BISMHISSUEDLICO AIRCONDIDITIONING06/28/2005
BISOTISSUEDGREAT WILL CONSTRUCTION INC.05/20/2005
BISMHISSUEDJDS CONSTRUCTION INC08/14/2002
BISBLISSUEDPLUMBING & HTG DOCTOR INC03/15/2000
BISPLISSUEDPLUMBING & HTG DOCTOR INC03/14/2000
BISOTISSUEDDORIEL SCAFFOLDING INC02/25/2000
BISPLISSUEDAMOK INC09/15/1999
BISOTISSUEDWKL CONSTRUCTION09/15/1999
BISEQISSUEDLEE MAN GENRL CONTRACTOR INC.03/29/1999
BISOTISSUEDLEE MAN GENRL CONTRACTOR INC.03/29/1999
BISPLISSUEDAMOK INC02/25/1999
BISOTISSUEDLEE MAN GENERAL CONTRACTOR INC02/10/1999
BISCCISSUEDC C A CONSTRUCT. CONSULT. ASSOC03/08/1994
1 project · most recent 04/21/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/21/2025Signed-offMODERN DESIGN GEN CONTRHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ-U 48,000 BTU · Condensing Unit ×11
MSZ-GS06NA-U 6,000 BTU · Split System ×12
MSZ-GS09NA-U 9,000 BTU · Split System ×8
PEAD-A24AA8 24,000 BTU · Fan Coil Indoor ×8
MSZ-GS12NA-U 12,000 BTU · Split System ×6
PKFY-P24NKMU-E 18,000 BTU · Vrf Indoor ×6
SEZ-KD12NA4R1 11,500 BTU · Vrf Indoor ×6
MSZ-GS24NA-U 24,400 BTU · Split System ×4
PKFY-P12NLMU-E 12,000 BTU · Vrf Indoor ×4
PKFY-P18NLMU-E 24,000 BTU · Vrf Indoor ×4
PKFY-P06NLMU-E 6,000 BTU · Vrf Indoor ×2
PKFY-P08NLMU-E 8,000 BTU · Vrf Indoor ×2
MXZ-SM48NAMHZ2 48,000 BTU · Condensing Unit ×8
Daikin FTX24UVJU 24,000 BTU · Split System ×4
FTX18UVJU 18,000 BTU · Split System ×2
RXL24WMVJU9, RXL18UMVJUA 48,000 BTU · Condensing Unit ×3
2 projects · most recent 12/22/2025
Sprinkler System
FiledStatusContractorScope
12/22/2025Signed-offCROSSFIELD PLBG.&HTG.CORPSprinkler System
04/21/2025———
1 project · most recent 04/21/2025
Water/Sanitary
FiledStatusContractorScope
04/21/2025Signed-offTRI STATE PLBG & HTG INCWater/Sanitary
2 projects · most recent 10/06/2025
General Wiring
FiledStatusContractorScope
10/06/2025CompleteINTELOGIC ELECTRIC, INC.General Wiring
08/07/2024CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
11/26/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/05/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/25/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/07/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
03/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/05/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
01/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
01/01/2026Fenestration and door U-factor and product ratingsNITHIN JOHNenergy_progress
01/01/2026Lighting controlsNITHIN JOHNenergy_progress
01/01/2026Interior lighting powerNITHIN JOHNenergy_progress
01/01/2026Fenestration areasNITHIN JOHNenergy_progress
01/01/2026Fenestration air leakageNITHIN JOHNenergy_progress
01/01/2026Air barrier - visual inspectionNITHIN JOHNenergy_progress
01/01/2026Fire-Resistant Penetrations and JointsNITHIN JOHNspecial
01/01/2026Fire-Resistance Rated ConstructionNITHIN JOHNprogress
01/01/2026Energy Code Compliance InspectionsNITHIN JOHNprogress
12/22/2025Fire-Resistance Rated ConstructionNITHIN JOHNprogress
12/22/2025Fire-Resistant Penetrations and JointsNITHIN JOHNspecial
12/22/2025Air barrier - visual inspectionNITHIN JOHNenergy_progress
12/22/2025Fenestration air leakageNITHIN JOHNenergy_progress
12/22/2025Interior lighting powerNITHIN JOHNenergy_progress
12/22/2025Lighting controlsNITHIN JOHNenergy_progress
12/22/2025Fenestration and door U-factor and product ratingsNITHIN JOHNenergy_progress
12/22/2025Fenestration areasNITHIN JOHNenergy_progress
12/22/2025Energy Code Compliance InspectionsNITHIN JOHNprogress
08/08/2025Fire-Resistant Penetrations and JointsNITHIN JOHNspecial
08/08/2025Fire-Resistance Rated ConstructionNITHIN JOHNprogress
08/08/2025Interior lighting powerNITHIN JOHNenergy_progress
08/08/2025Fenestration areasNITHIN JOHNenergy_progress
08/08/2025Lighting controlsNITHIN JOHNenergy_progress
08/08/2025Fenestration air leakageNITHIN JOHNenergy_progress
08/08/2025Air barrier - visual inspectionNITHIN JOHNenergy_progress
Latest 25 of 70.
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch17
08/27/2026M01026641-I1Request digital key ↗
08/25/2026M01091472-S3Request digital key ↗
08/25/2026M01091472-P5Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00275975-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
07/30/2025123129408Open ↗
07/28/2025123225045Open ↗
03/20/2018123225045Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
01/09/2018123129408Open ↗
06/07/2010120328350Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWRestrictive Declaration/Easement 17
08/25/2026M01091472-P4Open ↗
08/25/2026M01091472-P3Open ↗
08/25/2026M01091472-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp5
08/25/2026M01091472-P4Open ↗
08/25/2026M01091472-P3Open ↗
08/25/2026M01091472-P1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications59
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/05/2026M00275975-I1Open ↗
08/25/2026M01091472-P1Open ↗
08/25/2026M01091472-P4Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026M01059700-P1Open ↗
09/02/2026M01059700-P1Open ↗
09/02/2026M01059700-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/29/2026M01059700-S4Open ↗
09/29/2026M01059700-S4Open ↗
09/29/2026M01059700-S4Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/09/2018123129408Open ↗
12/27/2017123129408Open ↗
08/29/2011120328350Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
12/27/2017123129408Open ↗
05/06/2010120328350Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/06/2010120328350Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/27/2017123129408Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
05/06/2010120328350Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/25/2026M01091472-P4Open ↗
08/25/2026M01091472-P3Open ↗
08/25/2026M01091472-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes1
03/20/2018123225045Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/25/2026M01091472-P4Open ↗
08/25/2026M01091472-P3Open ↗
08/25/2026M01091472-P1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/08/2018123129408Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/06/2010120328350Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/20/2018123225045Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/01/2025123129408Open ↗
08/01/2025123129408Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
03/20/2018123225045Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/04/2025123129408Open ↗
08/29/2011120328350Open ↗
▸BISFINAL1
08/01/2025123129408Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/06/2010120328350Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
03/20/2018123225045Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/27/2017123129408Open ↗
08/29/2011120328350Open ↗
05/06/2010120328350Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/01/2025123129408Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
03/20/2018123225045Open ↗
12/27/2017123129408Open ↗
05/06/2010120328350Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification5
08/25/2026M01091472-P4Open ↗
08/25/2026M01091472-P3Open ↗
08/25/2026M01091472-P1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/29/2011120328350Open ↗
▸DOB NOWFinal Survey1
08/13/2026M01091472-I1Open ↗