RoofUnder Construction5p · 3 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
Mechanical Systems
Removal of mechanical duct work, kitchen hood and related kitchen exhaust on the 40th floor and roof as indicated on drawings.
On file for this project
5 documents · 2 drawing sheets
General construction to replace roof of MER bulkheads and window washing runway as indicated on drawings.
On file for this project
5 documents · 1 drawing sheet
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
On file for this project
13 documents · 1 drawing sheet
Floor 421p · 1 filing · 5 docs
Architecture
General construction to replace roof of MER bulkheads and window washing runway as indicated on drawings.
On file for this project
5 documents · 1 drawing sheet
Floor 41
Floor 40Under Construction16p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Plumbing changes on the 40th floor as indicated on drawings.
On file for this project
4 documents · 1 drawing sheet
Sprinkler changes on the 40th floor as indicated on drawings.
On file for this project
4 documents · 1 drawing sheet
Mechanical changes on the 40th floor as indicated on drawings.
On file for this project
6 documents
Latest 3 of 7 filings on this floor.
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 349p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Hound Partners - Plumbing work on the 34th floor as indicated on drawings.
On file for this project
3 documents · 2 drawing sheets
Hound Partners - Structural work on the 34th floor as indicated on drawings. All related architectural work filed under M00989664.
On file for this project
3 documents · 1 drawing sheet
Hound Partners - Sprinkler work on the 34th floor as indicated on drawings.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 33
Floor 327p · 2 filings · 12 docs
ArchitectureMechanical
Minor Mechanical work on part of the 32nd Floor as indicated on drawings.
On file for this project
4 documents · 4 drawing sheets
Minor architectural work on part of 32nd floor as indicated on drawings
On file for this project
8 documents · 3 drawing sheets
Floor 31Under Construction30p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Mechanical work on the 31st floors as indicated on drawings.
On file for this project
6 documents
Sprinkler work on the 31st floor as indicated on drawings.
On file for this project
4 documents
Plumbing work on the 31st floor as indicated on drawings.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 30
Floor 291p · 1 filing · 4 docs
Landscape
Removal of sprinkler heads and installation of temporary sprinkler loop on the 34th floor as indicated on drawings.
On file for this project
4 documents · 1 drawing sheet
Floor 288p · 4 filings · 16 docs
ArchitectureDMFire ProtectionGeneralPlumbing
Sprinkler changes on the 28th floor as indicated on drawings.
On file for this project
4 documents · 1 drawing sheet
Plumbing changes on the 28th floor as indicated on drawings.
On file for this project
3 documents · 1 drawing sheet
Architectural changes on the 28th floor as indicated on drawings.
On file for this project
5 documents · 7 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 274p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Locust Wood Capital - Sprinkler work on the 27th floor as indicated on drawings.
On file for this project
3 documents · 1 drawing sheet
Locust Wood Capital - Construction work on the 27th floor as indicated on drawings.
On file for this project
5 documents · 1 drawing sheet
Locust Wood Capital - Mechanical work on the 27th floor as indicated on drawings.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 26
Floor 25Under Construction1p · 3 filings · 13 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers
The Siegfried Group - Sprinkler work on the 25th floor as indicated on drawings.
On file for this project
3 documents
The Sigfried Group - Mechanical work on the 25th floor as indicated on drawings.
On file for this project
5 documents
Demolition of non load bearing partitions on the 25th floor as indicated on drawings.
On file for this project
5 documents · 1 drawing sheet
Floor 244p · 1 filing · 4 docs
Mechanical
Mechanical work on part of the 24th floor as indicated on drawings.
On file for this project
4 documents · 4 drawing sheets
Floor 23
Floor 2213p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Plumbing changes on the 22nd floor as indicated on drawings.
On file for this project
3 documents · 1 drawing sheet
Sprinkler changes on the 22nd floor as indicated on drawings.
On file for this project
8 documents · 3 drawing sheets
Structural changes (slab fill) on the 22nd floor as indicated on drawings.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 21Under Construction57p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
ICG Capital / Robeco Turnkey - Construction work on the 21st floor as indicated on drawings.
On file for this project
11 documents · 9 drawing sheets
ICG Capital / Robeco Turnkey - Plumbing work on the 21st floor as indicated on drawings.
On file for this project
9 documents · 2 drawing sheets
ICG Capital / Robeco Trunkey - Mechanical work on the 21st floor as indicated on drawings.
On file for this project
12 documents · 5 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 20
Floor 191p · 1 filing · 4 docs
Mechanical
NO WORK - Application filed to obtain Certificate of Compliance for HVAC units previously installed under BIS Job# 123812543 but for which no Equipment Use Permits were pulled. No proposed new work; no proposed change in building use, egress, or occupancy
On file for this project
4 documents · 1 drawing sheet
Floor 186p · 1 filing · 4 docs
Mechanical
NO WORK - Application filed to obtain Certificate of Compliance for HVAC units previously installed under BIS Job# 123812543 but for which no Equipment Use Permits were pulled. No proposed new work; no proposed change in building use, egress, or occupancy
On file for this project
4 documents · 6 drawing sheets
Floor 172p · 1 filing · 4 docs
Mechanical
NO WORK - Application filed to obtain Certificate of Compliance for HVAC units previously installed under BIS Job# 123812543 but for which no Equipment Use Permits were pulled. No proposed new work; no proposed change in building use, egress, or occupancy
On file for this project
4 documents · 2 drawing sheets
Floor 164p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Installation of glass doors and connect to building security and install new network wire in office and relocate an outlet on 16th floor as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Plumbing alterations for tenant fit-out on the 16th floor (FT Partners) and related work as per plans.
On file for this project
3 documents · 1 drawing sheet
Sprinkler alterations for tenant fit-out on the 16th floor (FT Partners) and related work as per plans.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 15
Floor 14
Floor 13
Floor 12
Floor 118p · 2 filings · 7 docs
ArchitectureDMFire ProtectionGeneralStructural
Relocation and addition of sprinkler heads. No change in use and occupancy.
On file for this project
4 documents · 1 drawing sheet
SCOPE OF WORK INCLUDES THE ADDITION OF RECEPTION AREA, EXECUTIVEASSISTANTS AREA, AND TWO OFFICES.
On file for this project
3 documents · 7 drawing sheets
Floor 109p · 1 filing · 4 docs
Architecture
Issued Permit Scope
General Construction
Installation of interior non-bearing partitions as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
4 documents · 4 drawing sheets
Floor 913p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
MECHANICAL MODIFICATIONS (OUTFRONT MEDIA) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
INTERIOR RENOVATION (OUTFRONT MEDIA) WORK TO INCLUDE PARTITION,CEILING, DOOR MODIFICATIONS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 7 drawing sheets
PLUMBING DEMO (OUTFRONT MEDIA) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.)
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 86p · 4 filings · 18 docs
ArchitectureDMMechanicalPlumbing
MECHANICAL MODIFICATIONS (OUTFRONT MEDIA) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
INTERIOR RENOVATION (OUTFRONT MEDIA) WORK TO INCLUDE PARTITION,CEILING, DOOR MODIFICATIONS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
PLUMBING DEMO (OUTFRONT MEDIA) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.)
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 76p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbing
Plumbing changes on the 7th floor (PWC) as indicated on drawings.
On file for this project
4 documents · 2 drawing sheets
Sprinkler changes on the 7th floor (PWC) as indicated on drawings.
On file for this project
5 documents · 1 drawing sheet
Mechanical changes on the 7th floor (PWC) as indicated on drawings.
On file for this project
18 documents · 3 drawing sheets
Floor 68p · 1 filing · 12 docs
ArchitectureDM
Architectural changes on the 6th floor as indicated on drawings.
On file for this project
12 documents · 8 drawing sheets
Floor 5Under Construction18p · 7 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Standpipe
Plumbing changes on the 5th floor as indicated on drawings.
On file for this project
4 documents · 1 drawing sheet
Sprinkler changes on the 5th floor as indicated on drawings.
On file for this project
4 documents · 2 drawing sheets
Standpipe changes on the 5th floor as indicated on drawings.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 47p · 2 filings · 10 docs
Fire ProtectionMechanicalPlumbing
modifications to existing plumbing fixtures and sprinkler system as per plans filed herewith. no change in use, egress or occupancy under this application.
On file for this project
7 documents · 6 drawing sheets
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 1 drawing sheet
Floor 3
Floor 2
Floor 13p · 2 filings · 20 docs
MechanicalPlumbing
Proposing to renovation existing retail space - new soffit, new finishes, casework, equipment, minor mechanical work, wall treatments, furniture and graphics. All work as per plans submitted.
On file for this project
22 documents · 2 drawing sheets
REPLACE TWO 36,300 BTUH SELF CONTAINED AIR COO;ED PACKAGE UNITS CONNECTING TO EXISTING DUCTWORK, CONDENEDSATE , POWER AND CONTROL WIRING.
On file for this project
9 documents · 1 drawing sheet
Cellar4p · 2 filings · 20 docs
ArchitectureFire ProtectionStructural
GARAGE REPAIRS AND SIDEWALK SECTION REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
29 documents · 2 drawing sheets
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON THE FIRST AND CELLAR FLOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
Sub-Cellar3p · 1 filing · 20 docs
Structural
GARAGE REPAIRS AND SIDEWALK SECTION REPLACEMENT AS PER PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
29 documents · 3 drawing sheets