← Back
BuildNYC
Primarily 2 family with 1 store or office
9008 5TH AVENUE
BROOKLYN · Bay Ridge · BIN 3154586
💬 Discuss this project
1925Year Built
3Stories
S2Building Class
C8-2Zoning
2,970 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: ED-No-JO Realty · 1,949 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSidewalk shed erection1p · 1 filing · 2 docs
Floor 3Ednojo Realty CorpUnder Construction1 filing · 18 docs
Floor 2Ednojo Realty CorpUnder Construction1 filing · 18 docs
Floor 1Ednojo Realty CorpUnder Construction9p · 4 filings · 20 docs
CellarEdnojo Realty CorpUnder Construction1p · 1 filing · 18 docs
Site & exteriorEdnojo Realty CORP5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ednojo Realty2010/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dmytro Chornobryvets Architect309/21/2026
Anthony Bonsignore, RA405/18/2026
Syed Engineering203/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting203/21/2026
New Amsterdam Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bayridge ConstructionGeneral Contractor407/08/2026
JascoScaffold303/21/2026
Planet RenovationsGeneral Contractor210/06/2026
Dunrite Design GroupGeneral Contractor206/28/2026
K.H. Werber Plumbing CoPlumbing107/08/2026
Triton ElectricElectrical103/21/2026
Altair Plumbing and HeatingPlumbing110/09/2026
Roger de Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gony Architect & Plnner P3629209/21/2026
Jaj Engineering930405/18/2026
Building Lifecycle
All (65)Filed (9)Permit Issued (9)Signed Off (4)Violation (4)Inspection (3)Objection (6)Special Inspection (30)
10/08/2026
Permit issued — Plumbing
B01452331-S1-PL
10/05/2026
Permit issued — General Construction
B01452331-I1-GC
10/05/2026
Permit issued — Mechanical Systems
B01452331-S2-MS
09/21/2026
Filed — Alteration
Mechanical work in conjunction with interior renovation at existing Ground Floor Commercial Space. No change in use, occupancy and egress.
B01452331-S1
09/21/2026
Filed — Alteration
Mechanical work in conjunction with interior renovation at existing Ground Floor Commercial Space. No change in use, occupancy and egress.
B01452331-S2
09/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vitaly Ganopolsky
09/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Vitaly Ganopolsky
09/19/2026
Special inspection requirement — Final
DMYTRO CHORNOBRYVETS
09/19/2026
Special inspection requirement — Mechanical Systems
Vitaly Ganopolsky
09/14/2026
Filed — Alteration
Mechanical work in conjunction with interior renovation at existing Ground Floor Commercial Space. No change in use, occupancy and egress.
B01452331-I1
08/27/2026
Special inspection requirement — Interior lighting power
Vitaly Ganopolsky
08/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Vitaly Ganopolsky
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vitaly Ganopolsky
08/27/2026
Special inspection requirement — Lighting controls
Vitaly Ganopolsky
08/27/2026
Special inspection requirement — Fire-Resistance Rated Construction
Vitaly Ganopolsky
08/24/2026
Signed off — Alteration CO
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION ON 1ST FLOOR & CELLAR INCONJUNCTION WITH 1ST FLOOR CHANGE OF USE FROM DRESS FACTORY TO OFFICES. LEGALIZE EXISTING ONE-STORY 1ST FLOOR ADDITION AT REAR. OBTAIN AMENDED CERTIFICATE OF OCCUPANCY.
B01299874-I1
07/29/2026
Signed off — Alteration
REMOVE AND RELOCATE/REPLACE 1-LAV, 1-WC, ALL ON THE 1ST FLOOR
B01309967-I1
06/26/2026
Permit issued — Mechanical Systems
B01299874-I1-GC-CX
06/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
06/25/2026
Special inspection requirement — Interior lighting power
Joseph Jabour
06/25/2026
Special inspection requirement — Maintenance information
Joseph Jabour
06/25/2026
Special inspection requirement — Lighting controls
Joseph Jabour
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Jabour
06/25/2026
Special inspection requirement — Mechanical Systems
Joseph Jabour
06/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Jabour
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
06/25/2026
Special inspection requirement — Final
Joseph Jabour
06/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Jabour
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
06/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
06/05/2026
Objection resolved — Addressed
06/03/2026
Objection raised — Other
05/18/2026
Filed — Alteration CO
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION ON 1ST FLOOR & CELLAR INCONJUNCTION WITH 1ST FLOOR CHANGE OF USE FROM DRESS FACTORY TO OFFICES. LEGALIZE EXISTING ONE-STORY 1ST FLOOR ADDITION AT REAR. OBTAIN AMENDED CERTIFICATE OF OCCUPANCY.
B01299874-P1
05/18/2026
Filed — Alteration
REMOVE AND RELOCATE/REPLACE 1-LAV, 1-WC, ALL ON THE 1ST FLOOR
B01309967-P1
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
05/18/2026
Special inspection requirement — Mechanical Systems
Joseph Jabour
05/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
05/18/2026
Special inspection requirement — Final
Joseph Jabour
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Jabour
05/18/2026
Special inspection requirement — Lighting controls
Joseph Jabour
05/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2026
Permit issued — Plumbing
B01309967-I1-PL
04/21/2026
Permit issued — Mechanical Systems
B01299874-I1-GC-CX
04/06/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
11/28/2025
Objection raised — Zoning
11/28/2025
Objection raised — Admin
11/05/2025
Filed — Alteration CO
PERFORM MINOR INTERIOR PARTITION DEMOLITION & CONSTRUCTION ON 1ST FLOOR & CELLAR INCONJUNCTION WITH 1ST FLOOR CHANGE OF USE FROM DRESS FACTORY TO OFFICES. LEGALIZE EXISTING ONE-STORY 1ST FLOOR ADDITION AT REAR. OBTAIN AMENDED CERTIFICATE OF OCCUPANCY.
B01299874-I1
11/05/2025
Filed — Alteration
REMOVE AND RELOCATE/REPLACE 1-LAV, 1-WC, ALL ON THE 1ST FLOOR
B01309967-I1
07/12/2021
Signed off — Alteration
B00491643-I1
07/12/2021
Signed off — Alteration
B00488352-I1
05/26/2021
Permit issued — General Construction
B00491643-I1-GC
04/23/2021
Permit issued — General Construction
B00491643-I1-GC
03/25/2021
Filed — Alteration
B00491643-I1
03/19/2021
Permit issued — Sidewalk Shed
B00488352-I1-SH
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAltair Plumbing and Heating10/08/2026
DOB NOWGeneral ConstructionPermit IssuedPlanet Renovations10/05/2026
DOB NOWMechanical SystemsPermit IssuedPlanet Renovations10/05/2026
DOB NOWMechanical SystemsPermit IssuedDunrite Design Group06/26/2026
DOB NOWPlumbingSigned-offK.H. Werber Plumbing Co04/29/2026
DOB NOWMechanical SystemsPermit IssuedDunrite Design Group04/21/2026
DOB NOWGeneral ConstructionSigned-offBayridge Construction05/26/2021
DOB NOWGeneral ConstructionSigned-offBayridge Construction04/23/2021
DOB NOWSidewalk ShedSigned-offJasco03/19/2021
BISEQISSUEDS.P.S. NY Construction Co07/27/2010
2 projects · most recent 09/21/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/21/2026Permit IssuedPlanet RenovationsAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM48NLHZ 48,000 BTU · Condensing Unit ×1
05/18/2026Permit IssuedDunrite Design GroupAir Conditioning Systems
Cooling
National Comfort NCPE-424-3010 2 tons · Heat Pump Outdoor ×2
2 projects · most recent 09/21/2026
Water/Sanitary
FiledStatusContractorScope
09/21/2026Permit IssuedAltair Plumbing and HeatingWater/Sanitary
05/18/2026Signed-offK.H. Werber Plumbing CoWater/Sanitary
2 projects · most recent 05/11/2026
General Wiring
FiledStatusContractorScope
05/11/2026CompleteRoger de Electric CoGeneral Wiring
02/28/2025CompleteTriton ElectricGeneral Wiring
1 project · most recent 05/18/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
05/18/2026Permit IssuedDunrite Design GroupTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
09/20/2026HVAC-R and service water heating equipmentVitaly Ganopolskyenergy_progress
09/20/2026Energy Code Compliance InspectionsVitaly Ganopolskyprogress
09/19/2026FinalDMYTRO CHORNOBRYVETSprogress
09/19/2026Mechanical SystemsVitaly Ganopolskyspecial
08/27/2026Interior lighting powerVitaly Ganopolskyenergy_progress
08/27/2026Energy Code Compliance InspectionsVitaly Ganopolskyprogress
08/27/2026Fire-Resistant Penetrations and JointsVitaly Ganopolskyspecial
08/27/2026Lighting controlsVitaly Ganopolskyenergy_progress
08/27/2026Fire-Resistance Rated ConstructionVitaly Ganopolskyprogress
06/25/2026HVAC-R and service water piping design and insulationJoseph Jabourenergy_progress
06/25/2026Interior lighting powerJoseph Jabourenergy_progress
06/25/2026Maintenance informationJoseph Jabourenergy_progress
06/25/2026Lighting controlsJoseph Jabourenergy_progress
06/25/2026HVAC-R and service water heating system controlsJoseph Jabourenergy_progress
06/25/2026Mechanical SystemsJoseph Jabourspecial
06/25/2026Tenant Protection Plan ComplianceJoseph Jabourspecial
06/25/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
06/25/2026Energy Code Compliance InspectionsJoseph Jabourprogress
06/25/2026FinalJoseph Jabourprogress
06/25/2026HVAC-R and service water heating equipmentJoseph Jabourenergy_progress
06/11/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
06/11/2026Energy Code Compliance InspectionsJoseph Jabourprogress
06/11/2026HVAC-R and service water piping design and insulationJoseph Jabourenergy_progress
05/18/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
05/18/2026Mechanical SystemsJoseph Jabourspecial
Latest 25 of 37.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
10/04/2026B01452331-S1Request digital key ↗
10/04/2026B01452331-S2Request digital key ↗
10/04/2026B01452331-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/22/2010320190066Open ↗
▸BISWORK PERMIT APPLICATION1
07/27/2010320190066Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01299874-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWProgress Inspector Seal & Signature12
10/04/2026B01452331-I1Open ↗
10/04/2026B01452331-I1Open ↗
10/04/2026B01452331-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
10/04/2026B01452331-S1Open ↗
10/04/2026B01452331-S2Open ↗
10/04/2026B01452331-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/04/2026B01452331-S2Open ↗
10/04/2026B01452331-I1Open ↗
09/23/2026B01299874-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/22/2010320190066Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/22/2010320190066Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/22/2010320190066Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026B01299874-P1Open ↗
08/13/2026B01299874-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
10/04/2026B01452331-S1Open ↗
10/04/2026B01452331-I1Open ↗
10/04/2026B01452331-S2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/22/2010320190066Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
07/22/2010320190066Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/22/2010320190066Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/15/2026B01299874-P1Open ↗
08/13/2026B01299874-I1Open ↗