← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
904 PACIFIC STREET
BROOKLYN · BIN 3027695
💬 Discuss this project
2008Year Built
7Stories
RMBuilding Class
R6AZoning
24,293 sfGross Floor Area
33Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 8,650 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
Architecture
Roof2p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
904 PACIFIC ST CONDOMINIU103/22/2026
BROOKLYN HOME MANAGEMENT103/22/2026
SUPREME BUILDERS & DEVELO603/22/2026
ELI KARP SUPREME BUILDERS503/22/2026
FMC103/22/2026
SUPREME 904 PACIFIC1703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.202/16/2024
LPE ENGINEERING, PC111/15/2023
NAOR SUZUMORI ARCHITECTURE D.P.C.305/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING403/21/2026
FRAMEWORK CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M&E CONSTRUCTION CORPGeneral Contractor807/08/2026
A & J CONTRACTORS CO INCGeneral Contractor303/21/2026
MR. AIR NYC CORPGeneral Contractor107/08/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781202/16/2024
CNS INSPECTION SERVICES7566111/15/2023
LPE ENGINEERING PC3102111/15/2023
CROSSCHECK INSPECTION SER544305/04/2022
Building Lifecycle
All (108)Filed (6)Permit Issued (7)Signed Off (3)Facade (FISP) (6)Violation (43)Inspection (3)Objection (10)Special Inspection (30)
02/27/2024
Signed off — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT SUITE #101 OF EXISTING 7-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00975663-I1
02/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTIAN LOZADA
02/20/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
02/20/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
02/20/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/20/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
02/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/20/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/16/2024
Filed — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT SUITE #101 OF EXISTING 7-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00975663-P1
02/15/2024
Cycle 9 facade report submitted
02/13/2024
Cycle 9 facade report signed — SWARMP
02/13/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/13/2024
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
02/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTIAN LOZADA
02/13/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
02/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
02/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/13/2024
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/13/2024
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
01/26/2024
Permit issued — Mechanical Systems
B00975663-I1-MS
01/24/2024
Cycle 9 facade inspection completed
12/28/2023
Filed — Alteration
INSTALL NEW SPLIT A.C. SYSTEM AT SUITE #101 OF EXISTING 7-STORY BUILDING WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00975663-I1
12/20/2023
Permit issued — General Construction
B00959752-I1-GC-CX
12/01/2023
Objection resolved — Addressed
11/30/2023
Objection resolved — Addressed
11/30/2023
Objection resolved — Addressed
11/30/2023
Objection resolved — Addressed
11/30/2023
Objection resolved — Addressed
11/21/2023
Objection raised — Other
11/21/2023
Objection raised — Zoning
11/21/2023
Objection raised — Other
11/21/2023
Objection raised — Admin
11/21/2023
Objection raised — Other
11/15/2023
Filed — Alteration
EXTERIOR FACADE REPAIRS TO INLCUDE CONCRETE PATCHING; STUCCO REPAIRS, GUARDRAIL REPAIR/ REINFORCEMENT AS PER PLANS FILED. THERE IS NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION
B00959752-I1
11/08/2023
Special inspection requirement — Structural Steel - Welding
John Nucatola
11/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
Roberta Levine
11/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Roberta Levine
11/08/2023
Special inspection requirement — Structural Steel - Details
John Nucatola
11/08/2023
Special inspection requirement — Final
Roberta Levine
11/08/2023
Special inspection requirement — Post-installed Anchors
John Nucatola
02/21/2023
Signed off — Alteration
PLUMBING WORK RELATED TO MINOR INTERIOR RENOVATION OF DUPLEX APT. 101. FLRS 1 & 2. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00561947-I1
02/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/17/2022
Signed off — Alteration
B00560708-I1
10/27/2022
Permit issued — General Construction
B00560708-I1-GC
08/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
Idan Naor
05/06/2022
Special inspection requirement — Energy Code Compliance Inspections
Idan Naor
05/06/2022
Special inspection requirement — Final
Idan Naor
05/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
05/04/2022
Filed — Alteration
B00560708-P1
04/18/2022
Permit issued — General Construction
B00560708-I1-GC
02/14/2022
Permit issued — General Construction
B00560708-I1-GC
02/04/2022
Violation issued (ECB, closed)
Boilers
02/03/2022
Violation issued (ECB, closed)
Boilers
12/21/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMR. AIR NYC CORP01/26/2024
DOB NOWGeneral ConstructionPermit IssuedA & J CONTRACTORS CO INC12/20/2023
DOB NOWGeneral ConstructionSigned-offM&E CONSTRUCTION CORP10/27/2022
DOB NOWGeneral ConstructionSigned-offM&E CONSTRUCTION CORP04/18/2022
DOB NOWGeneral ConstructionSigned-offM&E CONSTRUCTION CORP02/14/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING11/23/2021
DOB NOWGeneral ConstructionSigned-offM&E CONSTRUCTION CORP10/30/2021
BISPLISSUEDDEMAR PLUMBING CORP10/11/2011
BISEQISSUEDCORMICAN CONSTRUCTION INC03/29/2011
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE10/07/2010
BIS—ISSUEDNEW LINE STRUCTURES INC08/31/2010
BISEQISSUEDNEW LINE STRUCTURES INC08/31/2010
BIS—ISSUEDSUPREME BUILDERS & DEVELOPERS08/06/2009
BISPLISSUEDG.J.K. MECHANICAL INC01/29/2009
BISSDISSUEDG.J.K. MECHANICAL INC12/19/2008
BIS—ISSUEDSUPREME BUILDERS & DEVELOPERS11/28/2008
BIS—ISSUEDSUPREME BUILDERS & DEVELOPERS08/27/2008
BISSPISSUEDGJK MRCHANICAL INC04/10/2008
BISPLISSUEDGJK MECHANICAL INC01/14/2008
BIS—ISSUEDSUPREME BUILDERS & DEVELOPERS11/21/2007
BISEQISSUEDSUPREME BUILDERS & DEVELOPERS11/21/2007
BIS—ISSUEDSUPREME BUILDERS & DEVELOPERS05/21/2007
BISPLISSUEDC JAMES PLBG & HTG INC01/05/2007
BISEQISSUEDSUPREME BUILDERS & DEVELOPERS11/13/2006
BIS—ISSUEDSUPREME BUILDERS & DEVELOPERS08/28/2006
BISEQISSUEDSUPREME BUILDERS & DEVELOPERS08/28/2006
BISEQISSUEDSUPREME BUILDERS & DEVELOPERS08/25/2006
BISEQISSUEDFRANK MICELI JR CONTR INC06/19/2006
2 projects · most recent 01/04/2024
HVAC Wiring General Wiring
FiledStatusContractorScope
01/04/2024CompleteINTELOGIC ELECTRIC, INC.HVAC Wiring
09/06/2022CompleteFUSED ELECTRIC CONTNG CORGeneral Wiring
1 project · most recent 11/15/2023
Steel
FiledStatusContractorScope
11/15/2023Permit IssuedA & J CONTRACTORS CO INCSteel
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/21/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
02/20/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/20/2024Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
02/20/2024Mechanical SystemsCHRISTIAN LOZADAspecial
02/20/2024FinalCHRISTIAN LOZADAprogress
02/20/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/20/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
02/20/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/20/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/20/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/20/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
02/13/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/13/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/13/2024Mechanical SystemsCHRISTIAN LOZADAspecial
02/13/2024Tenant Protection Plan ComplianceCHRISTIAN LOZADAspecial
02/13/2024FinalCHRISTIAN LOZADAprogress
02/13/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/13/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/13/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/13/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
02/13/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
11/08/2023Structural Steel - WeldingJohn Nucatolaspecial
11/08/2023Tenant Protection Plan ComplianceRoberta Levinespecial
11/08/2023Structural Stability – Alterations of existing buildingsRoberta Levinespecial
11/08/2023Structural Steel - DetailsJohn Nucatolaspecial
11/08/2023FinalRoberta Levineprogress
Latest 25 of 36.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00560708-P1Request digital key ↗
09/01/2026B00560708-I1Request digital key ↗
09/01/2026B00561947-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION8
05/15/2012320477792Open ↗
02/06/2012310117254Open ↗
03/30/2011320288201Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
03/30/2011320288201Open ↗
10/08/2010320225831Open ↗
12/19/2008310117254Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED2
05/15/2012320477792Open ↗
11/16/2010320240627Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B00959752-I1Open ↗
08/28/2026B00560708-P1Open ↗
08/28/2026B00560708-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
03/09/2012310117254Open ↗
03/09/2012310117254Open ↗
11/16/2011320288201Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00959752-I1Open ↗
09/01/2026B00959752-I1Open ↗
09/01/2026B00959752-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00560708-I1Open ↗
09/01/2026B00560708-P1Open ↗
09/01/2026B00561947-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/15/2012320477792Open ↗
03/30/2011320288201Open ↗
11/16/2010320240627Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
05/15/2012320477792Open ↗
03/30/2011320288201Open ↗
11/16/2010320240627Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE3
06/17/2009310117254Open ↗
06/11/2009310117254Open ↗
06/10/2009310117254Open ↗
▸BISSCHEDULE B - PLUMBING3
02/06/2012310117254Open ↗
03/05/2009310117254Open ↗
04/07/2008310117254Open ↗
▸BISRPZ/DDCV TEST REPORT : GEN215B2
06/17/2009310117254Open ↗
06/17/2009310117254Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
06/12/2009310117254Open ↗
▸BISWATER METER PERMIT : DEP-METER1
06/17/2009310117254Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
06/11/2009310117254Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
05/15/2012320477792Open ↗
03/30/2011320288201Open ↗
11/16/2010320240627Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00560708-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸BISADMINISTRATIVE OBJECTIONS6
05/15/2012320477792Open ↗
03/30/2011320288201Open ↗
11/16/2010320240627Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
03/09/2012310117254Open ↗
03/07/2012310117254Open ↗
11/16/2011320288201Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/02/2010310162882Open ↗
02/02/2010310162882Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
06/17/2009310117254Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/07/2012310117254Open ↗
02/02/2010310162882Open ↗
04/10/2008310117254Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET5
05/15/2012320477792Open ↗
03/30/2011320288201Open ↗
11/16/2010320240627Open ↗
Showing 3 of 5 on file for this type
▸Other Documents3
▸BISDRY PIPE VALVE TEST : FP-102
06/11/2009310117254Open ↗
06/11/2009310117254Open ↗
▸BISSD/SP FIRE PUMP TEST : FP-861
06/12/2009310117254Open ↗