Primarily 5-6 family with 1 store or office
909 MANHATTAN AVENUE
BROOKLYN · Greenpoint · BIN 3064717
💬 Discuss this project
1930Year Built
4Stories
S5Building Class
C4-3AZoning
4,704 sfGross Floor Area
7Units
Rent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · 2,100 sf lot · 2.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Floor 121p · 4 filings · 20 docs
Cellar11p · 3 filings · 20 docs
Site & exterior14p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES NY407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI702/24/2025
MSM ENGINEERING SERVICES, PLLC106/06/2024
MDG DESIGN GROUP305/23/2021
HAMANN ENGINEERING, PLLC103/11/2020
GREEN DESIGN102/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-DIS DESIGN GROUP303/21/2026
BIG ORANGE EXPEDITING203/21/2026
ECDESIGN STUDIO1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor403/22/2026
PHOENIX SUTTON STR INCGeneral Contractor307/08/2026
Z & K RENOVATION, CORPGeneral Contractor307/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing307/08/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
EXTRESS CONTRACTING INCGeneral Contractor107/08/2026
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
MNK ENTERPRISES NY INCGeneral Contractor107/08/2026
AI FANG WUElectrical103/21/2026
Z.W. PLBG & HTG CORPPlumbing107/08/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
LELIS, ARILSONElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394502/24/2025
SEAD ENGINEERING PC2665305/23/2021
Building Lifecycle
All (79)Filed (13)Permit Issued (10)Signed Off (6)Violation (16)Inspection (5)Objection (2)Special Inspection (27)
07/05/2026
Violation issued (HPD, open)
A
07/05/2026
Violation issued (HPD, open)
A
07/05/2026
Violation issued (HPD, open)
A
07/05/2026
Violation issued (HPD, open)
A
05/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/05/2025
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND PARTIAL CELLAR:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AS PER PLAN. INSTALL NEW AWNING AT STOREFRONT NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.,
B01127780-I1
03/04/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/24/2025
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND PARTIAL CELLAR:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AS PER PLAN. INSTALL NEW AWNING AT STOREFRONT NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.,
B01127780-P3
02/24/2025
Signed off — Alteration
RENOVATION OF EXISTING FIRST FLOOR AND PARTIAL CELLAR WITH PLUMBING WORK AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01127787-I1
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
02/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/24/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
02/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
01/13/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
12/16/2024
Filed — Alteration
RENOVATION OF EXISTING FIRST FLOOR AND PARTIAL CELLAR WITH PLUMBING WORK AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01127787-P2
12/16/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND PARTIAL CELLAR:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AS PER PLAN. INSTALL NEW AWNING AT STOREFRONT NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.,
B01127780-P2
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
12/16/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
12/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
12/03/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/19/2024
Permit issued — General Construction
B01127780-I1-GC
11/14/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND PARTIAL CELLAR:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AS PER PLAN. INSTALL NEW AWNING AT STOREFRONT NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.,
B01127780-P1
11/14/2024
Filed — Alteration
RENOVATION OF EXISTING FIRST FLOOR AND PARTIAL CELLAR WITH PLUMBING WORK AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01127787-P1
11/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
11/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/14/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
11/06/2024
Permit issued — Plumbing
B01127787-I1-PL
10/30/2024
Permit issued — General Construction
B01127780-I1-GC
10/25/2024
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE IN FIRST FLOOR AND PARTIAL CELLAR:INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES AS PER PLAN. INSTALL NEW AWNING AT STOREFRONT NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.,
B01127780-I1
10/25/2024
Filed — Alteration
RENOVATION OF EXISTING FIRST FLOOR AND PARTIAL CELLAR WITH PLUMBING WORK AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
B01127787-I1
09/19/2024
Violation issued (HPD, open)
B
07/05/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01062282-I1
06/06/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01062282-I1
06/06/2024
Permit issued — Sidewalk Shed
B01062282-I1-SH
04/22/2024
Signed off — Alteration
B00323877-I1
11/09/2023
Violation issued (HPD, closed)
C
11/09/2023
Violation issued (HPD, closed)
C
03/01/2022
Violation issued (HPD, closed)
A
11/10/2021
Signed off — Alteration
B00481860-I1
07/29/2021
Signed off — Alteration
HEREWITH FILE FOR TENANT-FIT OUR ALTERATION. WORK INCLUDES NEW FLOOR TILE, NEW PAINT, NEW ACC. STAIRCASE, NEW MINI-SPLIT TYPE HVAC UNIT, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00475581-I1
06/08/2021
Permit issued — Mechanical Systems
B00475581-I1-GC-CX
05/23/2021
Filed — Alteration
HEREWITH FILE FOR TENANT-FIT OUR ALTERATION. WORK INCLUDES NEW FLOOR TILE, NEW PAINT, NEW ACC. STAIRCASE, NEW MINI-SPLIT TYPE HVAC UNIT, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00475581-P1
05/10/2021
Special inspection requirement — Interior lighting power
INHWAN CHANG
05/10/2021
Special inspection requirement — Lighting controls
INHWAN CHANG
05/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
05/10/2021
Special inspection requirement — Mechanical Systems
INHWAN CHANG
05/10/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
INHWAN CHANG
05/10/2021
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
05/10/2021
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
05/10/2021
Special inspection requirement — Final
Kyumyeon Lee
05/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
05/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
05/10/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
05/10/2021
Special inspection requirement — Insulation placement and R values
INHWAN CHANG
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/19/2024
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG11/06/2024
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC10/30/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC06/06/2024
DOB NOWMechanical SystemsPermit IssuedZ K RENOVATION06/08/2021
DOB NOWPlumbingSigned-offZ.W. PLBG & HTG CORP03/31/2021
DOB NOWMechanical SystemsPermit IssuedZ K RENOVATION03/29/2021
DOB NOWConstruction FencePermit IssuedEXTRESS CONTRACTING INC03/12/2020
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC03/03/2020
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC02/28/2020
BISOTISSUEDZ & K RENOVATION, CORP12/14/2020
BISOTISSUEDEURO STRUCTURE LLC08/03/2020
BISOTISSUEDEXTRESS CONTRACTING INC04/15/2020
BISOTISSUEDEXTRESS CONTRACTING INC03/13/2020
5 projects · most recent 10/31/2024
General Wiring
FiledStatusContractorScope
10/31/2024Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
06/06/2024Permit IssuedRICHARD NEU—
04/14/2021CompleteELMAC ELECTRIC INC.General Wiring
02/24/2020Permit IssuedELPO ELECTRICAL CONTG INC—
02/14/2019CancelledWILLDAN ELECTRICAL OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
02/24/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
02/24/2025Tenant Protection Plan Compliance—special
02/24/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
02/24/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
12/18/2024Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
12/16/2024Tenant Protection Plan Compliance—special
12/16/2024Tenant Protection Plan Compliance—special
12/16/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
12/16/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
12/16/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
11/14/2024Tenant Protection Plan Compliance—special
11/14/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
11/14/2024Tenant Protection Plan Compliance—special
11/14/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
11/14/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
05/10/2021Interior lighting powerINHWAN CHANGenergy_progress
05/10/2021Lighting controlsINHWAN CHANGenergy_progress
05/10/2021Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
05/10/2021Mechanical SystemsINHWAN CHANGspecial
05/10/2021Structural Stability – Alterations of existing buildingsINHWAN CHANGspecial
05/10/2021Energy Code Compliance InspectionsINHWAN CHANGprogress
05/10/2021Fire-Resistance Rated ConstructionINHWAN CHANGprogress
05/10/2021FinalKyumyeon Leeprogress
05/10/2021HVAC-R and service water heating equipmentINHWAN CHANGenergy_progress
05/10/2021HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
Latest 25 of 27.
▾Documents — 90 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch9
09/01/2026B00481860-I1Request digital key ↗
08/24/2026B01062282-I1Request digital key ↗
08/23/2026B01127787-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00475581-P1Request digital key ↗
08/15/2026B00475581-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00475581-P1Request digital key ↗
08/15/2026B00475581-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00323877-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00323877-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00329987-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
11/24/2020340789917Open ↗
10/15/2020321941495Open ↗
04/05/2019321941495Open ↗
▸BISWORK PERMIT APPLICATION2
12/14/2020340789917Open ↗
09/03/2020321941495Open ↗
▸Seals & Professional Certifications37
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00481860-I1Open ↗
09/01/2026B00475581-P1Open ↗
09/01/2026B00475581-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/29/2026B01127780-P2Open ↗
08/24/2026B01127780-P1Open ↗
08/23/2026B01127780-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026B01127780-P2Open ↗
08/24/2026B01127780-P1Open ↗
08/23/2026B01127780-P3Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/14/2019321941495Open ↗
05/14/2019321941495Open ↗
04/05/2019321941495Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/24/2020340789917Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/24/2020340789917Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026B00323877-I1Open ↗
08/13/2026B00329987-I1Open ↗
▸BISTenant Protection Plan and Notes1
04/05/2019321941495Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
12/14/2020340789917Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00481860-I1Open ↗
09/01/2026B00475581-P1Open ↗
08/15/2026B00475581-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/24/2020340789917Open ↗
04/05/2019321941495Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/12/2021321941495Open ↗
01/07/2021340789917Open ↗
12/14/2020340789917Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
01/12/2021321941495Open ↗
01/07/2021340789917Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/14/2019321941495Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/24/2020340789917Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00475581-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
01/12/2021321941495Open ↗
01/12/2021321941495Open ↗
01/07/2021340789917Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/28/2021340789917Open ↗
01/12/2021321941495Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
07/28/2021340789917Open ↗
01/12/2021321941495Open ↗
11/24/2020340789917Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
11/24/2020340789917Open ↗
▸BISADDITIONAL INFORMATION1
11/02/2020321941495Open ↗
▸BISEFILING COVER SHEET1
04/05/2019321941495Open ↗