← Back
BuildNYC
Miscellaneous two family
91 AUDUBON AVENUE
MANHATTAN · BIN 1063035
💬 Discuss this project
1920Year Built
3Stories
B9Building Class
R7-2Zoning
1,744 sfGross Floor Area
2Units
Rent Stabilized3 Active Violations ▸
Miscellaneous two family · 1,583 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21p · 1 filing · 6 docs
Floor 11p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/30/2023$954K—Private party → Private party$547/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Edward F Zevallos Architect110/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Haque Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DKR Construction CoGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Edward F Zevallos Architects1025110/18/2023
Building Lifecycle
07/11/2025
§ 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE PIPE UNDER SINK IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st…
HPD violation · open
07/11/2025
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st…
HPD violation · open
05/12/2025
§ 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM…
HPD violation · open
01/17/2024
Signed off — Alteration
INTERIOR RENOVATION OF A DUPLEX APARTMENT AT THE 1ST AND 2ND FLOOR ONLY INCLUDING REMOVAL OF INTERIOR PARTITION, NEW INTERIOR PARTITION, AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00947256-I1
10/25/2023
Permit issued — General Construction
M00947256-I1-GC
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDKR Construction Co10/25/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
10/12/2023Fire-Resistant Penetrations and JointsEdward Zevallosspecial
10/12/2023FinalEdward Zevallosprogress
10/12/2023Energy Code Compliance InspectionsEdward Zevallosprogress
10/12/2023Lighting in dwelling unitsEdward Zevallosenergy_progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account