← Back
Office, 20+ stories, with or without commercial
919 Third Avenue
919 3 AVENUE · BIN 1085955
💬 Discuss this project
1970Year Built
46Stories
O4Building Class
C6-6Zoning
1,323,432 sfGross Floor Area
55Units
LL97 Covered1 Open Violation 0 unresolved · 1 paperwork only ▸
Office, 20+ stories, with or without commercial · Owner of record: SL GREEN REALTY CORP. · 64,768 sf lot · 20.43 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalFire Protection
Floor 15p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SL GREEN REALTY3907/08/2026
RECKSON OPERATING PARTNER103/22/2026
METROPOLITAN 919 3RD PODE103/22/2026
CLARKES GROUP1203/21/2026
METROPOLITAIN 919 THIRD AVE603/21/2026
RECKSON ASSOCIATES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSF ENGINEERING, PC506/01/2023
ZACHARY SAPINSLEY LEWIS, R.A.306/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI-STAR CONSTRUCTION CORPGeneral Contractor704/09/2026
MLN REAL ESTATEGeneral Contractor303/21/2026
CITY/SUBURBAN PLBG CORPPlumbing207/08/2026
PSI PARTNERS, LLCFire Protection107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254506/01/2023
Building Lifecycle
All (65)Filed (8)Permit Issued (9)Signed Off (6)Violation (15)Inspection (12)Special Inspection (15)
03/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/03/2026
Signed off — Alteration
M00834654-I1
02/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/18/2026
Permit issued — Plumbing
M00834674-I1-PL
01/23/2026
Permit issued — General Construction
M00834654-I1-GC
07/01/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/24/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/18/2024
Signed off — Alteration
FILING TO MODIFY EXISTING KITCHEN EXHAUST DUCT TO ACCOMMODATE NEW EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08041226-I1
04/18/2024
Signed off — Alteration
M08041254-I1
03/06/2024
Signed off — Alteration
RENOVATION OF EXISTING KITCHEN AREA WITH NEW PLUMBING FIXTURES AND KITCHEN EQUIPMENT INCLUDING NEW PIPING AND VALVES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08041244-I1
12/07/2023
Permit issued — Plumbing
M00834674-I1-PL
09/11/2023
Permit issued — General Construction
M00834654-I1-GC
06/28/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/01/2023
Filed — Alteration
M00834654-I1
06/01/2023
Filed — Alteration
M00834674-I1
04/20/2023
Signed off — Alteration
M08041161-I1
04/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
04/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
04/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
04/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
03/31/2023
Filed — Alteration
RENOVATION OF EXISTING KITCHEN AREA WITH NEW PLUMBING FIXTURES AND KITCHEN EQUIPMENT INCLUDING NEW PIPING AND VALVES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08041244-P1
03/21/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
03/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
03/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
03/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
03/15/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Underground
Certified
View inspection ↗
03/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/28/2023
Signed off — Alteration
M08013726-I1
01/17/2023
Permit issued — Plumbing
M08041244-I1-PL
01/17/2023
Permit issued — Sprinklers
M08041254-I1-EW-SP
01/10/2023
Permit issued — Mechanical Systems
M08041226-I1-MS
01/05/2023
Permit issued — General Construction
M08041161-I1-GC
01/02/2023
Filed — Alteration
FILING TO MODIFY EXISTING KITCHEN EXHAUST DUCT TO ACCOMMODATE NEW EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08041226-I1
01/02/2023
Filed — Alteration
M08041254-I1
01/02/2023
Filed — Alteration
RENOVATION OF EXISTING KITCHEN AREA WITH NEW PLUMBING FIXTURES AND KITCHEN EQUIPMENT INCLUDING NEW PIPING AND VALVES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08041244-I1
01/02/2023
Filed — Alteration
M08041161-I1
11/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
11/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
11/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
11/23/2022
Special inspection requirement — Duct leakage testing, insulation and design
MAURICIO ANDRADE
11/23/2022
Special inspection requirement — Maintenance information
MAURICIO ANDRADE
10/29/2022
Permit issued — General Construction
M08013726-I1-GC
10/14/2022
Filed — Alteration
M08013726-I1
09/30/2022
Special inspection requirement — Final
Zachary Lewis
09/30/2022
Special inspection requirement — Fire-Resistance Rated Construction
Mirella Boselli
08/30/2022
Violation issued (ECB, closed)
Unknown
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2015
Violation issued (ECB, closed)
Construction
06/10/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/25/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/02/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/19/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/23/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/18/2026
DOB NOWGeneral ConstructionSigned-offMLN REAL ESTATE01/23/2026
DOB NOWPlumbingSigned-offCITY/SUBURBAN PLBG CORP12/07/2023
DOB NOWGeneral ConstructionSigned-offTRI-STAR CONSTRUCTION COR09/11/2023
DOB NOWPlumbingSigned-offCITY/SUBURBAN PLBG CORP01/17/2023
DOB NOWSprinklersSigned-offMORA FIRE PROTECTION LLC01/17/2023
DOB NOWMechanical SystemsSigned-offTRI-STAR CONSTRUCTION COR01/10/2023
DOB NOWGeneral ConstructionSigned-offTRI-STAR CONSTRUCTION COR01/05/2023
DOB NOWGeneral ConstructionSigned-offTRI-STAR CONSTRUCTION COR10/29/2022
BISMHISSUEDKABACK ENTERPRISES INC05/10/2018
BISEQISSUEDCS BRIDGE CORP06/22/2016
BISPLISSUEDCITY/SUBURBAN PLBG CORP12/06/2012
BISOTISSUEDTRI-STAR CONSTRUCTION CORP10/12/2012
BISPLISSUEDCITY/SUBURBAN PLBG CORP11/09/2010
BISFPISSUEDCHIEF FIRE PREV.& MECH CO04/05/2010
BISOTISSUEDTRI-STAR CONSTRUCTION CORP08/31/2009
BISFPISSUEDIDEAL FIRE CONTROL INC04/10/2007
BISPLISSUEDNEW YORK HEATING CORP11/23/2005
BISMHISSUEDMLC INC.03/19/2003
BIS—ISSUEDFRANK PARLAMIS INC02/22/2003
BISMHISSUEDMETROPOLITAN MECHANICAL C02/06/2003
BISMHISSUEDFRANK PARLAMIS INC01/14/2003
BISPLISSUEDTILOS PLBG AND HTG CORP12/03/2002
BISPLISSUEDTILOS PLUMBING AND HEATING CORP07/22/2002
BISEQISSUEDFRANK PARLAMIS INC05/01/2002
BISFPISSUEDSENTINEL FIRE CONTROL,INC,04/30/1992
2 projects · most recent 10/20/2022
General Wiring
FiledStatusContractorScope
10/20/2022CompleteR. GUNZER, INC.General Wiring
04/22/2021Permit IssuedROBERT CHIMENTI3 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2025Pass-Final PL - UndergroundPassView ↗
06/28/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/15/2023Certified Sprinkler-SP-Piping Dry/Wet-UndergroundCertifiedView ↗
03/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
04/03/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
04/03/2023HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
04/03/2023HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
04/03/2023HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
03/16/2023HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
03/16/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
03/16/2023HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
03/16/2023HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
11/23/2022HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
11/23/2022HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
11/23/2022HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
11/23/2022Duct leakage testing, insulation and designMAURICIO ANDRADEenergy_progress
11/23/2022Maintenance informationMAURICIO ANDRADEenergy_progress
09/30/2022FinalZachary Lewisprogress
09/30/2022Fire-Resistance Rated ConstructionMirella Boselliprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.J. Clarke'sRestaurant / Food ServiceGround, Floors 1, 2
Project M00834674 Alteration · Permit Entire · 06/01/2023
Project M08041254 Alteration · LOC Issued · 01/02/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026M08013726-I1Request digital key ↗
09/01/2026M08041161-I1Request digital key ↗
09/01/2026M08041254-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
05/10/2018123503280Open ↗
06/21/2016140511701Open ↗
10/03/2012121397014Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION8
05/10/2018123503280Open ↗
06/21/2016140511701Open ↗
12/17/2012120144156Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
05/16/2018123503280Open ↗
05/10/2018123503280Open ↗
05/10/2018123503280Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026M08041161-I1Open ↗
09/01/2026M08041254-I1Open ↗
09/01/2026M08041226-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/30/2026M08041244-I1Open ↗
08/24/2026M08041244-P1Open ↗
08/23/2026M08013726-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
05/10/2018123503280Open ↗
06/21/2016140511701Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/10/2018123503280Open ↗
08/28/2009120144156Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/30/2026M08041244-I1Open ↗
08/24/2026M08041244-P1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/21/2016140511701Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/21/2016140511701Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/28/2009120144156Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING4
11/01/2010120144156Open ↗
10/29/2010120144156Open ↗
10/01/2009120144156Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
05/15/2018123503280Open ↗
05/15/2018123503280Open ↗
05/15/2018123503280Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
01/31/2013120144156Open ↗
01/09/2013120144156Open ↗
12/06/2010120144156Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/16/2018123503280Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026M08041161-I1Open ↗
09/01/2026M08041254-I1Open ↗
09/01/2026M08041226-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
03/23/2010120299587Open ↗
08/28/2009120144156Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/03/2012121397014Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/16/2018123503280Open ↗
05/10/2018123503280Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/21/2016140511701Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/16/2018123503280Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/21/2016140511701Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
05/16/2018123503280Open ↗
05/16/2018123503280Open ↗
12/20/2017121397014Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
03/23/2010120299587Open ↗
08/28/2009120144156Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
05/16/2018123503280Open ↗
05/10/2018123503280Open ↗
12/20/2017121397014Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
05/10/2018123503280Open ↗
10/03/2012121397014Open ↗
03/23/2010120299587Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
05/16/2018123503280Open ↗
12/20/2017121397014Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/21/2016140511701Open ↗