Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects2 filings
INSTALLATION OF TEMPORARY FALL PROTECTION IN THE ELEVATOR SHAFT AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FALL PROTECTION TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
2 documents
INSTALLATION OF TEMPORARY SHAFT SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
2 documents
RoofNew York State Office of, Special Victims Unit New York PoliUnder Construction11p · 9 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents · 1 drawing sheet
55th Street Plaza bulkhead roof replacement, as per plans. No change to use, egress, or occupancy.
On file for this project
6 documents · 2 drawing sheets
Main roof replacement and traffic coating, as per plans. Work scope includes guardrail replacement and steel dunnage refurbishment. No change to use, egress, or occupancy.
On file for this project
12 documents · 3 drawing sheets
Latest 3 of 9 filings on this floor.
BulkheadBloombergUnder Construction2p · 2 filings · 15 docs
Architecture
Main roof replacement and traffic coating, as per plans. Work scope includes guardrail replacement and steel dunnage refurbishment. No change to use, egress, or occupancy.
On file for this project
12 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS INCLUDING DUNNAGE FOR EMERGENCY GENERATOR ON THE 7TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Floor 47New York State Office ofUnder Construction6p · 9 filings · 15 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Project M01322733Permit Issued · 01/30/2026
Modifications to the existing sprinkler system on the 47th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
2 documents
Project M01322738Permit Issued · 01/30/2026
Modifications to the existing standpipe system on the 47th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents
Project M01322730Signed-off · 01/28/2026
Modifications, replacements, and additions to the existing plumbing fixtures and piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
8 documents
Latest 3 of 9 filings on this floor.
Floor 46New York State Office ofUnder Construction8p · 9 filings · 15 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Project M01322719Permit Issued · 01/30/2026
Modifications to the existing sprinkler system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
2 documents
Project M01322724Permit Issued · 01/30/2026
Modifications to the existing standpipe system on the 46th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
3 documents
Project M01322716Signed-off · 01/28/2026
Modifications, replacements, and additions to the existing plumbing fixtures and piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
6 documents
Latest 3 of 9 filings on this floor.
Floor 45New York State Office ofUnder Construction10p · 12 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications, replacements, and additions to the existing plumbing fixtures and piping on the 45th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
4 documents · 2 drawing sheets
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 45th Floor (46th Floor Marketing Floor), as per plans. No change to use, egress, or occupancy.
On file for this project
11 documents
Interior renovation of existing office space with minor interior demolition, and work on partitions, doors, ceilings and finishes on the 45th Floor, as per plans. No change to use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 12 filings on this floor.
Floor 44Bloomberg11p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal of existing plumbing fixtures and associated piping on the 35th, 42nd through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Slab infill and reinforcement on the 36th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 43Bloomberg12p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal of existing plumbing fixtures and associated piping on the 35th, 42nd through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Slab infill and reinforcement on the 36th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 42Bloomberg14p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal of existing plumbing fixtures and associated piping on the 35th, 42nd through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Slab infill and reinforcement on the 36th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 41Bloomberg21p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Removal of partitions, doors, ceilings and finishes with patch and repair of walls, columns and fire-proofing on the 34th, 35th. 41st to 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Stair removal and infill from the 40th to 41st floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 8 filings on this floor.
Floor 40Bluerock, Bloomberg22p · 21 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing sprinkler system on the 40th floor (suite 4020 & 4030) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Modifications to the existing standpipe system on the 40th floor (Suite 4020) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 40th floor (suite 4020) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 21 filings on this floor.
Floor 39Mintz12p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modifications to the existing sprinkler system on the 39th and 40th floors as per plans. No change to use, egress or occupancy.
On file for this project
7 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes (Mintz) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 3 drawing sheets
Modifications to the existing sprinkler system with installation of temporary loops (LL Work) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 38Mintz12p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes (Mintz) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 3 drawing sheets
Modifications to the existing sprinkler system with installation of temporary loops (LL Work) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated piping (Mintz) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 37Mintz11p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes (Mintz) as per plans. No change to use, egress or occupancy.
On file for this project
9 documents · 3 drawing sheets
Modifications to the existing sprinkler system with installation of temporary loops (LL Work) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Installation of new plumbing fixtures and associated piping (Mintz) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 36Sl Green Realty CORP1p · 1 filing · 5 docs
Structural
Issued Permit Scope
Structural
Slab infill and reinforcement on the 36th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 35Sl Green Realty CORP4p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal of existing plumbing fixtures and associated piping on the 35th, 42nd through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 35th and 41st through 44th floors as per plans. No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modifications to the existing sprinkler system with installation of temporary loops on the 35th and 42nd through 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 34Cohen Clair Lans Greifer & Simpson, BloombergUnder Construction19p · 14 filings · 20 docs
ArchitectureDMFire ProtectionLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Minor interior renovation including partitions, doors, and finishes on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
On file for this project
5 documents
Minor modifications of the existing HVAC system and associated ducts & piping on the 34th Floor (Cohen Clair), as per plans. No change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Removal of partitions, doors, ceilings and finishes with patch and repair of walls, columns and fire-proofing on the 34th, 35th. 41st to 45th floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 14 filings on this floor.
Floor 33Debevoise & Plimpton, Bloomberg12p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Removal of existing plumbing fixtures and associated piping on the 28th through 33rd floors as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Removal of existing sprinkler heads and associated piping with installation of temporary loops on the 28th through 33rd floors as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Removal and disposal of interior partitions, doors, suspended ceilings and finishes with patch and repair on the 28th through 33rd floors as per plans. No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 7 filings on this floor.
Floor 32Bloomberg23p · 16 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
ALT-CO FILED HEREWITH TO CHANGE OCCUPANCY ON 30TH FLOOR (31 MKTG,) REMOVAL OF PUBLIC ASSEMBLY SPACE ON 3RD FLOOR, REMOVAL OF CAFETERIA ON 32ND FLOOR (33RD MKTG.) GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 30TH FLOOR (31 MKTG) PER PLANS.
On file for this project
18 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS ON FLOORS 31-32 (32-33 MARKETING) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
23 documents · 3 drawing sheets
SPRINKLER AND STANDPIPE MODIFICATIONS ON THE 31ST - 32ND (32ND AND 33RD MARKETING) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
Latest 3 of 16 filings on this floor.
Floor 31Bloomberg7p · 15 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
STRUCTURAL MODIFICATIONS ON FLOORS 31-32 (32-33 MARKETING) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
23 documents
SPRINKLER AND STANDPIPE MODIFICATIONS ON THE 31ST - 32ND (32ND AND 33RD MARKETING) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents
PLUMBING MODIFICATIONS ON THE 31ST - 32ND (32ND AND 33RD MARKETING) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
Latest 3 of 15 filings on this floor.
Floor 30Bloomberg4p · 18 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
STRUCTURAL MODIFICATIONS ON THE 30TH FLOOR (31 MARKETING) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
ALT-CO FILED HEREWITH TO CHANGE OCCUPANCY ON 30TH FLOOR (31 MKTG,) REMOVAL OF PUBLIC ASSEMBLY SPACE ON 3RD FLOOR, REMOVAL OF CAFETERIA ON 32ND FLOOR (33RD MKTG.) GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 30TH FLOOR (31 MKTG) PER PLANS.
On file for this project
18 documents
SPRINKLER AND STANDPIPE SYSTEM MODIFICATIONS ON THE 30TH FLOOR (31ST MKTG FL) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 18 filings on this floor.
Floor 29Bloomberg4p · 15 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
PLUMBING MODIFICAITONS ON THE 29TH FLOOR (30TH FLOOR MAKERTING) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
SPTRINKLER AND STADPIPE SYSTEMS MODIFICAITONS ON THE 29TH FLOOR (30TH FLOOR MAKERTING) PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
STRUCTURAL MODIFICATIONS ON THE 29TH (30 MKTG) FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents
Latest 3 of 15 filings on this floor.
Floor 28BloombergUnder Construction10p · 15 filings · 20 docs
ArchitectureFire AlarmFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
SPRINKLER AND STANDPIPE SYSTEMS MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS ON FLOORS 27-28 (28-29 MKTG) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
PLUMBING MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 15 filings on this floor.
Floor 27BloombergUnder Construction11 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
SPRINKLER AND STANDPIPE SYSTEMS MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
STRUCTURAL MODIFICATIONS ON FLOORS 27-28 (28-29 MKTG) PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
PLUMBING MODIFICATIONS ON THE 27TH AND 28TH (28TH AND 29TH MKTG) FLOORS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Latest 3 of 11 filings on this floor.
Floor 26
Floor 25
Floor 24
Floor 231 filing · 3 docs
ArchitectureMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
3 documents
Floor 22
Floor 21
Floor 20
Floor 19
Floor 181 filing · 3 docs
ArchitectureMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
3 documents
Floor 17Bloomberg, Marketing floor 188 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
SPRINKLER MODIFICATIONS ON THE 17TH FLOOR/18TH FLOOR MARKETING AS SHOWN ON PLANS SUBMITTED HEREWITH.
On file for this project
4 documents
General Construction modifications on the 17th floor/18th floor Marketing as shown on drawings submitted herewith.
On file for this project
3 documents
Mechanical systems modifications on the 17th floor/18th floor marketing as shown on drawings submitted herewith.
On file for this project
6 documents
Latest 3 of 8 filings on this floor.
Floor 16
Floor 15Bloomberg3p · 3 filings · 15 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Supported Scaffold
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
3 documents
modification to existing sprinkler system as per plans filed herewith.
On file for this project
3 documents · 1 drawing sheet
Modification to existing plumbing fixtures
On file for this project
9 documents · 2 drawing sheets
Floor 14BloombergUnder Construction4 filings · 19 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Supported Scaffold
MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE 14TH (CONSTRUCTION) 15TH (MARKETING) FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
GENERAL CONSTRUCTION MODIFICATIONS ON THE 14TH (CONSTRUCTION) 15TH (MARKETING) FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
MECHANICAL SYSTEMS MODIFICATIONS ON THE 14TH (CONSTRUCTION) 15TH (MARKETING) FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 131 filing · 3 docs
ArchitectureMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORM TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
3 documents
Floor 12Bloomberg1 filing · 6 docs
ArchitectureMechanicalStructural
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods · Supported Scaffold
MECHANICAL SYSTEMS MODIFICATIONS ON THE 12TH, 17TH (18TH MKTG) AND 27TH THROUGH 32ND (28TH-33RD MKTG) FLOORS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Floor 11Bloomberg18p · 10 filings · 18 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Standpipe Modifications taking place on the 7th & 11th floors as indicated on the drawings.
On file for this project
3 documents · 1 drawing sheet
Sprinkler modification on floors 2, 7, 10, and 11 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 2 drawing sheets
Construction modifications of an accessory stair on the 9th - 11th floors as indicated on the drawings.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 10Bloomberg10p · 7 filings · 18 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Standpipe Modifications taking place on the 7th & 11th floors as indicated on the drawings.
On file for this project
3 documents
Sprinkler modification on floors 2, 7, 10, and 11 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 2 drawing sheets
Construction modifications of an accessory stair on the 9th - 11th floors as indicated on the drawings.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 9Bloomberg LP, Bloomberg23p · 12 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
GENERAL CONSTRUCTION MODIFICATIONS ON THE 9TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 9 drawing sheets
MECHANICAL SYSTEMS MODIFICATIONS ON THE 9TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Standpipe modifications taking place on the 8th & 9th floors as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 12 filings on this floor.
Floor 8Bloomberg LP, Bloomberg20p · 11 filings · 18 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
MECHANICAL SYSTEMS MODIFICATIONS ON THE 8TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS ON THE 8TH FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 8 drawing sheets
Standpipe modifications taking place on the 8th & 9th floors as indicated on the drawings. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
Floor 7BloombergUnder Construction23p · 20 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
GENERAL CONSTRUCTION MODIFICATIONS RELATED TO GENERATOR ENCLOSURE / NOISE MITIGATION SCREEN ON THE 7TH FLOOR ROOF PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
MODIFICATION OF ASSOCIATED FUEL PIPING FOR EMERGENCY GENERATOR BEING FILED UNDER DOBNOW# M01142928-I1
On file for this project
4 documents
Latest 3 of 20 filings on this floor.
Floor 6BloombergUnder Construction17p · 13 filings · 18 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
6th floor roof replacement as per plans. No change to use, egress or occupancy.
On file for this project
7 documents
Standpipe modifications taking place on the 4-6th floors per plans filed herewith. Relocation of 6 hose cabinets. No change in use, egress, or occupancy.
On file for this project
4 documents
Latest 3 of 13 filings on this floor.
Floor 5BloombergUnder Construction20p · 14 filings · 18 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Standpipe · Structural · Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
Standpipe modifications taking place on the 4-6th floors per plans filed herewith. Relocation of 6 hose cabinets. No change in use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
Sprinkler modifications taking place on the 1st floor and 4th - 6th floors per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 14 filings on this floor.
Floor 4BloombergUnder Construction8p · 9 filings · 18 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sign · Sprinklers · Standpipe · Structural · Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
Standpipe modifications taking place on the 4-6th floors per plans filed herewith. Relocation of 6 hose cabinets. No change in use, egress, or occupancy.
On file for this project
4 documents
Sprinkler modifications taking place on the 1st floor and 4th - 6th floors per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 3BloombergUnder Construction20p · 11 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
PLUMBING MODIFICATIONS ON THE 3RD FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
ALT-CO FILED HEREWITH TO CHANGE OCCUPANCY ON 30TH FLOOR (31 MKTG,) REMOVAL OF PUBLIC ASSEMBLY SPACE ON 3RD FLOOR, REMOVAL OF CAFETERIA ON 32ND FLOOR (33RD MKTG.) GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 30TH FLOOR (31 MKTG) PER PLANS.
On file for this project
18 documents · 1 drawing sheet
Latest 3 of 11 filings on this floor.
Floor 2One Medical, BloombergUnder Construction13p · 10 filings · 18 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sign · Sprinklers · Structural · Supported Scaffold
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
Filing to change occupancy from theater without restrictions (use group 8) to medical offices (use group 6) on the first floor and related partition work.
On file for this project
6 documents · 1 drawing sheet
Sprinkler modification on floors 2, 7, 10, and 11 as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 1Bloomberg, Special Victims Unit New York Police Department +Under Construction26p · 25 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural
Structural modifications for LL26 Cycle 1A REM repairs as per plans. No change in use, egress or occupancy.
On file for this project
5 documents
ALT-CO FILED HEREWITH TO CHANGE OCCUPANCY ON 30TH FLOOR (31 MKTG,) REMOVAL OF PUBLIC ASSEMBLY SPACE ON 3RD FLOOR, REMOVAL OF CAFETERIA ON 32ND FLOOR (33RD MKTG.) GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 30TH FLOOR (31 MKTG) PER PLANS.
On file for this project
18 documents · 1 drawing sheet
HVAC REPLACEMENT AS PER PLANS SUBMITTED HEREWITH, NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
12 documents
Latest 3 of 25 filings on this floor.
CellarOne MedicalUnder Construction10p · 14 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Structural modifications for LL26 Cycle 1A REM repairs as per plans. No change in use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Furnish and install electrical closet in the cellar as per plans. No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 14 filings on this floor.
Sub-CellarBloomberg, One MedicalUnder Construction2p · 4 filings · 20 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Structural modifications for LL26 Cycle 1A REM repairs as per plans. No change in use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
ALT-CO FILED HEREWITH TO CHANGE OCCUPANCY ON 30TH FLOOR (31 MKTG,) REMOVAL OF PUBLIC ASSEMBLY SPACE ON 3RD FLOOR, REMOVAL OF CAFETERIA ON 32ND FLOOR (33RD MKTG.) GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON 30TH FLOOR (31 MKTG) PER PLANS.
On file for this project
18 documents
Filing to change occupancy from theater without restrictions (use group 8) to medical offices (use group 6) on the first floor and related partition work.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Site & exteriorOne MedicalUnder Construction8 filings · 20 docs
ArchitectureCivilEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Sign · Supported Scaffold
HEAVY DUTY SIDEWALK SHED FOR ROOFTOP GENERATOR INSTALLATION, FILED SEP UNDER APPLICATION # M01142928. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
7 documents · 8 drawing sheets
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
7 documents · 6 drawing sheets
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
4 drawing sheets
Latest 3 of 8 filings on this floor.
Filed — no permit issuedCondition assessment of rooftop bulkhead2 filings · 2 docs
ArchitectureEquipmentGeneralStructuralSC
IRA to assist with Condition Assessment
On file for this project
2 documents · 5 drawing sheets
Installation of fire rated partitions for place of assembly on the 46th Floor along with occupancy increase as per plans.
On file for this project
3 drawing sheets