← Back
Multi-story department store
92-59 59 AVENUE
QUEENS · BIN 4530817
💬 Discuss this project
2004Year Built
3Stories
K3Building Class
C4-5XZoning
202,383 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Multi-story department store · Owner of record: QUEENS FLAGSHIP LLC · 82,267 sf lot · 2.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 23p · 2 filings · 10 docs
Floor 110p · 5 filings · 20 docs
1 job · most recent 07/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/29/2025Signed-offOCS BUILDERS GROUP LLCHeating and Air Conditioning Systems
Heat / Cool
Aaon RNA-040-D-A-3-EAA0B-CB2L0 40 tons · Rooftop Unit ×2
RN-007-3-0-EB09-3K9 7 tons · Rooftop Unit ×3
RQ-004-3-V-EA89-319 4 tons · Rooftop Unit ×1
RNA-040-D-A-3-EAAEB-CB2L0 40 tons · Rooftop Unit ×4
RQ-004-3-V-EA89-31B 4 tons · Rooftop Unit ×2
Mitsubishi Electric PUY-A24NHA7/PKA-A24KA7 2 tons · Split System ×6
5 jobs · most recent 10/09/2024
General Wiring Lighting
FiledStatusContractorScope
10/09/2024Permit IssuedCITY ELEC'L SIGN ERECTORS—
10/09/2024Permit IssuedCITY ELEC'L SIGN ERECTORS—
06/13/2024CompleteNASH ELECTRIC SERVICES IN—
05/20/2024CompleteM F ELEC'L SVC CO., INCGeneral Wiring
09/07/2023CompleteBIG ANT ELECTRIC, INCGeneral Wiring, Lighting
1 job · most recent 07/29/2025
Steel Concrete Masonry
FiledStatusContractorScope
07/29/2025Signed-offJD MASTERS PLBG & HTGSteel, Concrete, Masonry
Building Lifecycle
All (144)Filed (19)Permit Issued (13)Signed Off (12)Violation (60)Inspection (10)Special Inspection (30)
05/18/2026
Signed off — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-S3
02/04/2026
Violation issued (FDNY_NOV, closed)
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
07/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIC BERLENT
07/30/2025
Special inspection requirement — Final
ERIC BERLENT
07/30/2025
Special inspection requirement — Maintenance information
ERIC BERLENT
07/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
ERIC BERLENT
07/30/2025
Special inspection requirement — Mechanical Systems
ERIC BERLENT
07/30/2025
Special inspection requirement — Smoke Control Systems Testing
ERIC BERLENT
07/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
ERIC BERLENT
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
07/29/2025
Filed — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-P6
02/24/2025
Violation issued (FDNY_NOV, closed)
02/24/2025
Violation issued (FDNY_NOV, closed)
12/23/2024
Signed off — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-S4
12/12/2024
Signed off — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-S2
11/27/2024
Signed off — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-I1
11/27/2024
Signed off — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-S1
11/25/2024
Signed off — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL READING "BURLINGTON DEALS BRANDS WOW!".
Q01023827-I1
11/06/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/23/2024
Signed off — Alteration
Q01054833-I1
10/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/05/2024
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
09/05/2024
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
09/05/2024
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
09/05/2024
Special inspection requirement — Final
SAMI HAJJAR P.E
09/05/2024
Special inspection requirement — Designated Seismic System
SAMI HAJJAR P.E
09/05/2024
Special inspection requirement — Structural Cold-Formed Steel
SAMI HAJJAR P.E
09/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
09/05/2024
Special inspection requirement — Masonry
SAMI HAJJAR P.E
09/05/2024
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
09/05/2024
Special inspection requirement — Post-installed Anchors
SAMI HAJJAR P.E
09/04/2024
Filed — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-P4
08/14/2024
Filed — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-P5
08/13/2024
Filed — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-P3
08/13/2024
Filed — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-P2
07/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
ERIC BERLENT
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
07/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
ERIC BERLENT
07/29/2024
Special inspection requirement — Maintenance information
ERIC BERLENT
07/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
07/29/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
07/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ERIC BERLENT
07/29/2024
Special inspection requirement — Mechanical Systems
ERIC BERLENT
07/29/2024
Special inspection requirement — Smoke Control Systems Testing
ERIC BERLENT
07/29/2024
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
07/29/2024
Special inspection requirement — Final
ERIC BERLENT
07/25/2024
Violation issued (FDNY_NOV, closed)
07/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/14/2024
Filed — Alteration
IT IS PROPOSED TO INSTALL NEW MECHANICAL UNITS AND DUCTWORK DISTRIBUTION AS SHOWN ON PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY. APPLICATION FILED IN CONJUNCTION WITH Q01017569-I1 (GC), Q01017569-S1 (FO), Q01017569-S2 (ST), Q01017569-S4 (PL)
Q01017569-P1
06/07/2024
Permit issued — Plumbing
Q01017569-S4-PL
06/06/2024
Permit issued — Construction Fence
Q01054833-I1-FN
06/06/2024
Permit issued — Construction Fence
Q01054833-I1-SH
06/05/2024
Filed — Alteration
Q01054833-I1
05/28/2024
Permit issued — Sign
Q01023827-I1-SG
05/24/2024
Filed — Alteration
ERECT ILLUMINATED ACCESSORY BUSINESS SIGN ON WALL READING "BURLINGTON DEALS BRANDS WOW!".
Q01023827-I1
05/21/2024
Permit issued — General Construction
Q01017569-I1-GC
Latest 60 of 144 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AAC MANAGEMENT4107/08/2026
QUEENS FLAGSHIP LLC203/22/2026
CLC PENNY CORP103/22/2026
JC PENNY CONSTRUCTION SERVICES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/23/2021$40.5M—— → —$200/sf building
01/30/2021$18.1M—— → —$90/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GEORGE E BERGER ASS2203/21/2026
METROPOLIS GROUP INC1203/21/2026
KAZAM CONSULTANTS203/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OCS BUILDERS GROUP LLCGeneral Contractor603/21/2026
RECTENWALD BROTHERS CONSTGeneral Contractor507/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor403/21/2026
LAWRENCE BROWNElectrical203/21/2026
JD MASTERS PLBG & HTGPlumbing107/08/2026
UNIVERSAL PLUMBING INCPlumbing107/08/2026
BIG ANT ELECTRIC, INCElectrical103/22/2026
NORTH SHORE NEON SIGNScaffold107/08/2026
CITY ELEC'L SIGN ERECTORSElectrical103/22/2026
PAUL OLSENElectrical103/21/2026
SIRINA FIRE PROT CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004707/29/2025
METRIC CONSULTING AND INS1803409/04/2024
PROJECT TACTICAL SOLUTION5859406/29/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJD MASTERS PLBG & HTG06/07/2024
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC06/06/2024
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC06/06/2024
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO05/28/2024
DOB NOWGeneral ConstructionSigned-offOCS BUILDERS GROUP LLC05/21/2024
DOB NOWMechanical SystemsSigned-offOCS BUILDERS GROUP LLC05/21/2024
DOB NOWStructuralSigned-offOCS BUILDERS GROUP LLC05/17/2024
DOB NOWFoundationSigned-offOCS BUILDERS GROUP LLC05/17/2024
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP07/07/2023
DOB NOWStructuralSigned-offRECTENWALD BROTHERS CONST06/10/2023
DOB NOWPlumbingSigned-offUNIVERSAL PLUMBING INC05/25/2023
DOB NOWMechanical SystemsSigned-offRECTENWALD BROTHERS CONST05/10/2023
DOB NOWGeneral ConstructionSigned-offRECTENWALD BROTHERS CONST05/08/2023
BISPLISSUEDTRISTATE PLBG SVCS CORP06/08/2018
BISOTISSUEDDGC CAPITAL CONTRACTING CORP05/01/2018
BISSPISSUEDCMA PLUMBING & HEATING IN11/18/2014
BISOTISSUEDB.R. FRIES & ASSOCIATES LLC07/25/2014
BISOTISSUEDSTEADFAST DEVELOPMENT AND10/10/2013
BISOTISSUEDSTEADFAST DEVELOPMENT AND08/01/2013
BISSPISSUEDPREFERRED SPKLR AND MECH05/23/2013
BISOTISSUEDJT MAGEN & COMPANY INC04/08/2013
BISOTISSUEDSTEADFAST DEVELOPMENT AND03/06/2013
BISOTISSUEDSTEADFAST DEVELOPMENT AND02/21/2013
BIS—ISSUEDMAUCERI SIGN CO., INC04/23/2004
BIS—ISSUEDMAUCERI SIGN CO., INC04/23/2004
BIS—ISSUEDMAUCERI SIGN CO., INC04/09/2004
BISFSISSUEDMANHATTAN BOILER & EQUIPMENT COR03/31/2004
BISMHISSUEDLENDLEASE(US)CONSTRUCTION03/08/2004
BISEQISSUEDLENDLEASE(US)CONSTRUCTION12/17/2003
BISSPISSUEDBELROSE FIRE SUPPRESSION INC10/22/2003
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION07/17/2003
BISEQISSUEDLENDLEASE(US)CONSTRUCTION07/17/2003
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION05/15/2003
BISPLISSUEDASPRO PLUMBING INC05/15/2003
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION05/12/2003
BISEQISSUEDLENDLEASE(US)CONSTRUCTION04/04/2003
BIS—ISSUEDLENDLEASE(US)CONSTRUCTION02/03/2003
BISEQISSUEDLENDLEASE(US)CONSTRUCTION02/03/2003
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
07/30/2025Mechanical SystemsERIC BERLENTspecial
07/30/2025HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
07/30/2025HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
07/30/2025HVAC-R and service water heating system controlsERIC BERLENTenergy_progress
07/30/2025Maintenance informationERIC BERLENTenergy_progress
07/30/2025Energy Code Compliance InspectionsERIC BERLENTprogress
07/30/2025FinalERIC BERLENTprogress
07/30/2025Smoke Control Systems TestingERIC BERLENTspecial
07/30/2025Fire-Resistant Penetrations and JointsERIC BERLENTspecial
09/05/2024Structural Cold-Formed SteelSAMI HAJJAR P.Especial
09/05/2024Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
09/05/2024Post-installed AnchorsSAMI HAJJAR P.Especial
09/05/2024Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
09/05/2024Structural Steel - WeldingSAMI HAJJAR P.Especial
09/05/2024Designated Seismic SystemSAMI HAJJAR P.Especial
09/05/2024Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
09/05/2024MasonrySAMI HAJJAR P.Especial
09/05/2024FinalSAMI HAJJAR P.Eprogress
09/05/2024Structural Steel - DetailsSAMI HAJJAR P.Especial
07/29/2024Maintenance informationERIC BERLENTenergy_progress
07/29/2024HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
07/29/2024Fire-Resistant Penetrations and JointsERIC BERLENTspecial
07/29/2024Maintenance informationERIC BERLENTenergy_progress
07/29/2024HVAC-R and service water heating equipmentERIC BERLENTenergy_progress
07/29/2024HVAC-R and service water piping design and insulationERIC BERLENTenergy_progress
Latest 25 of 72.
▾Documents — 207 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/24/2026Q00865649-I1Request digital key ↗
08/24/2026Q00865710-I1Request digital key ↗
08/24/2026Q00865671-P1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION11
06/20/2025420798621Open ↗
06/20/2025421621819Open ↗
06/20/2025420872096Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION10
06/12/2018421621819Open ↗
05/08/2018421621819Open ↗
11/29/2014421053077Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications88
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026Q01017569-I1Open ↗
09/02/2026Q01017569-I1Open ↗
09/01/2026Q00887919-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
05/08/2018421621819Open ↗
04/24/2018421621819Open ↗
04/11/2018421621819Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/24/2026Q00865710-I1Open ↗
08/24/2026Q00865671-I1Open ↗
08/24/2026Q00862611-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026Q01017569-I1Open ↗
09/02/2026Q01017569-I1Open ↗
08/31/2026Q00862611-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
04/11/2018421621819Open ↗
11/24/2014421053077Open ↗
07/08/2014420881193Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
08/08/2013420872096Open ↗
05/22/2013420847659Open ↗
03/05/2013420808193Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/12/2018421621819Open ↗
04/12/2018421621819Open ↗
11/24/2014421053077Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE3
04/17/2015421053077Open ↗
04/14/2015421053077Open ↗
10/07/2013420847659Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
04/14/2015421053077Open ↗
10/07/2013420847659Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/11/2018421621819Open ↗
11/24/2014421053077Open ↗
▸BISSCHEDULE B - PLUMBING1
05/22/2013420847659Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026Q00865710-I1Open ↗
08/24/2026Q00865671-I1Open ↗
08/24/2026Q00862611-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/08/2013420872096Open ↗
05/22/2013420847659Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/07/2013420808193Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
05/08/2018421621819Open ↗
04/11/2018421621819Open ↗
04/11/2018421621819Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/20/2015420881193Open ↗
09/27/2013420798621Open ↗
07/06/2013420808193Open ↗
▸BISTR8: Energy Code Progress Inspections2
03/07/2013420808193Open ↗
02/20/2013420798621Open ↗
▸BISINTERIOR LIGHTING POWER1
11/06/2024421621819Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/06/2024421621819Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/06/2024421621819Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/23/2026Q01017569-S3Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
11/15/2024421621819Open ↗
11/07/2024420872096Open ↗
10/16/2024420798621Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
11/24/2014421053077Open ↗
07/09/2014420881193Open ↗
08/08/2013420872096Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL2
11/06/2024421621819Open ↗
11/06/2024420872096Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/12/2016421053077Open ↗
▸BISSUPERSEDING LETTER1
04/11/2013420808193Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT15
10/29/2024421621819Open ↗
10/28/2024420872096Open ↗
04/11/2018421621819Open ↗
Showing 3 of 15 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/13/2024421621819Open ↗
10/28/2024420872096Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET8
04/11/2018421621819Open ↗
04/11/2018421621819Open ↗
11/24/2014421053077Open ↗
Showing 3 of 8 on file for this type