← Back
Elevator apt, semi-fireproof with stores
92-54 QUEENS BOULEVARD
QUEENS · BIN 4071944
💬 Discuss this project
0Year Built
8Stories
D7Building Class
R7-1Zoning
62,295 sfGross Floor Area
35Units
LL97 Covered1 Open Violation ▸
Elevator apt, semi-fireproof with stores · Owner of record: 92-54 QB HOUSING DEVELOPMENT FUND CORPOR ATION · 12,290 sf lot · 5.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Roof80p · 4 filings · 20 docs
Floor 1159p · 1 filing · 20 docs
Floor 1059p · 1 filing · 20 docs
Floor 959p · 1 filing · 20 docs
Floor 871p · 3 filings · 20 docs
Floor 771p · 3 filings · 20 docs
Floor 670p · 3 filings · 20 docs
Floor 562p · 3 filings · 20 docs
Floor 462p · 3 filings · 20 docs
Floor 363p · 3 filings · 20 docs
Floor 263p · 3 filings · 20 docs
Floor 175p · 3 filings · 20 docs
Cellar73p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD BUILDERS AND CONSTRUCT9507/08/2026
KINGS GROUP NY1107/08/2026
OWNERS REP1507/08/2026
EXPEDITE DEM INC503/22/2026
92-54 QB HOUSING DEVELOPM303/22/2026
CORE SCAFFOLD SYSTEMS103/22/2026
AAC REALTY ENTERPRISES LP1003/22/2026
JUNS CONSTRUCTION103/22/2026
METRO IRON CONTRACTING IN103/22/2026
CONSTRUCT SD BUILDERS AND103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/03/2022$13.2M—92-54 PROPCO LLC → 92-54 QB HOUSING DEVELOPMENT FUND CORPORATION$212/sf building
11/03/2021$13.1M—— → —$210/sf building
08/13/2018$9.7M—9254 QB LLC → WLHC REGO PARK LLC$155/sf building
04/23/2018$5.4M—AAC REALTY ENTERPRISES, LP → 9254 QB LLC$86/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION2203/21/2026
JM ZONING, LLC.2403/21/2026
EXPEDITE DEM203/21/2026
A1 EXPEDITING SERVICE CORP.203/21/2026
HIERARCH-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SD BUILDERS AND CONSTRUCTGeneral Contractor5007/08/2026
KINGS GROUP NY CORPGeneral Contractor807/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor707/08/2026
BROOKER ENGINEERINGGeneral Contractor503/22/2026
PACIFIC PLBG. & HTG. CORPFire Protection307/08/2026
JUN'S CONSTRUCTION INCGeneral Contractor307/08/2026
PACIFIC PLBG&HTG CORPPlumbing207/08/2026
ALWAYS FIRST, INCGeneral Contractor203/21/2026
KJK ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91682611/07/2024
Building Lifecycle
All (264)Filed (45)Permit Issued (41)Signed Off (18)Violation (43)Inspection (11)Objection (76)Special Inspection (30)
03/20/2025
Signed off — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-S3
03/19/2025
Violation issued (ECB, closed)
Construction
03/18/2025
Violation issued (ECB, open)
Elevators
03/18/2025
Violation issued (ECB, closed)
Elevators
01/27/2025
Signed off — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-S6
01/09/2025
Signed off — Alteration
Q00777699-I1
01/08/2025
Signed off — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-S2
01/08/2025
Signed off — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-S4
01/06/2025
Signed off — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-S5
01/02/2025
Signed off — Alteration
Q00883134-I1
01/02/2025
Signed off — Alteration
Installation of construction fence 5 FT off the property line to protect the public from entering construction area
Q00709206-I1
12/26/2024
Signed off — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-S1
12/16/2024
Signed off — Alteration
Q00827586-I1
12/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00866088-I1
12/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00827571-I1
11/07/2024
Filed — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-B2
11/05/2024
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
11/05/2024
Special inspection requirement — Lighting controls
Soorjbally Harilall
11/05/2024
Special inspection requirement — Air barrier — testing
Soorjbally Harilall
11/05/2024
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
11/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
11/05/2024
Special inspection requirement — Maintenance information
Soorjbally Harilall
11/05/2024
Special inspection requirement — Metering
Soorjbally Harilall
11/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
11/05/2024
Special inspection requirement — Interior lighting power
Soorjbally Harilall
11/05/2024
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
11/05/2024
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
11/05/2024
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
11/05/2024
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
11/05/2024
Special inspection requirement — Fenestration areas
Soorjbally Harilall
11/05/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
11/05/2024
Special inspection requirement — Vestibules
Soorjbally Harilall
11/05/2024
Special inspection requirement — Sprayed fire-resistant materials
SOORJBALLY HARILALL
11/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
11/05/2024
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
06/14/2024
Permit issued — Mechanical Systems
Q00777699-I1-MS
06/04/2024
Filed — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-B1
05/15/2024
Permit issued — Plumbing
Q00623509-S5-PL
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
03/12/2024
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
03/12/2024
Special inspection requirement — Maintenance information
Soorjbally Harilall
03/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
03/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
03/12/2024
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
03/12/2024
Special inspection requirement — Final
Soorjbally Harilall
03/12/2024
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
03/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
03/06/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/06/2024
Objection resolved — Addressed
02/27/2024
Objection resolved — Addressed
02/26/2024
Filed — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-A9
02/23/2024
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
02/23/2024
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
02/22/2024
Objection raised — Other
02/22/2024
Objection raised — Other
02/16/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/16/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/15/2024
Filed — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-A8
02/12/2024
Filed — New Building
Construct new eight (8) story mixed-use building as per plans filed.
Q00623509-A4
Latest 60 of 264 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSD BUILDERS AND CONSTRUCT06/14/2024
DOB NOWPlumbingSigned-offPACIFIC PLBG&HTG CORP05/15/2024
DOB NOWSprinklersSigned-offPACIFIC PLBG. & HTG. CORP11/02/2023
DOB NOWSprinklersSigned-offPACIFIC PLBG. & HTG. CORP11/02/2023
DOB NOWFoundationSigned-offSD BUILDERS AND CONSTRUCT10/26/2023
DOB NOWStructuralPermit IssuedSD BUILDERS AND CONSTRUCT10/26/2023
DOB NOWConstruction FenceSigned-offSD BUILDERS AND CONSTRUCT09/07/2023
DOB NOWMechanical SystemsSigned-offSD BUILDERS AND CONSTRUCT09/07/2023
DOB NOWStandpipeSigned-offPACIFIC PLBG. & HTG. CORP08/18/2023
DOB NOWProtection and Mechanical MethodsSigned-offSD BUILDERS AND CONSTRUCT06/10/2023
DOB NOWMechanical SystemsSigned-offSD BUILDERS AND CONSTRUCT06/01/2023
DOB NOWSupport of ExcavationSigned-offSD BUILDERS AND CONSTRUCT05/12/2023
DOB NOWStructuralPermit IssuedSD BUILDERS AND CONSTRUCT05/11/2023
DOB NOWFoundationSigned-offSD BUILDERS AND CONSTRUCT05/11/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/27/2023
DOB NOWSupport of ExcavationSigned-offSD BUILDERS AND CONSTRUCT04/21/2023
DOB NOWStructuralPermit IssuedSD BUILDERS AND CONSTRUCT04/21/2023
DOB NOWFoundationSigned-offSD BUILDERS AND CONSTRUCT04/21/2023
DOB NOWFoundationSigned-offSD BUILDERS AND CONSTRUCT04/12/2023
DOB NOWSupport of ExcavationSigned-offSD BUILDERS AND CONSTRUCT04/12/2023
DOB NOWStructuralPermit IssuedSD BUILDERS AND CONSTRUCT04/11/2023
DOB NOWStructuralPermit IssuedSD BUILDERS AND CONSTRUCT03/17/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/13/2023
DOB NOWPlumbingSigned-offPACIFIC PLBG&HTG CORP02/02/2023
DOB NOWMechanical SystemsSigned-offSD BUILDERS AND CONSTRUCT11/15/2022
DOB NOWStructuralPermit IssuedSD BUILDERS AND CONSTRUCT09/30/2022
DOB NOWFoundationSigned-offSD BUILDERS AND CONSTRUCT09/29/2022
DOB NOWSupport of ExcavationSigned-offSD BUILDERS AND CONSTRUCT09/29/2022
DOB NOWConstruction FenceSigned-offSD BUILDERS AND CONSTRUCT09/29/2022
DOB NOWFoundationSigned-offSD BUILDERS AND CONSTRUCT08/10/2022
DOB NOWSupport of ExcavationSigned-offSD BUILDERS AND CONSTRUCT08/09/2022
DOB NOWStructuralPermit IssuedSD BUILDERS AND CONSTRUCT08/09/2022
DOB NOWConstruction FenceSigned-offSD BUILDERS AND CONSTRUCT04/04/2022
DOB NOWConstruction FenceSigned-offJUN'S CONSTRUCTION INC06/05/2020
DOB NOWConstruction FenceSigned-offJUN'S CONSTRUCTION INC06/05/2020
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP09/23/2019
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP09/23/2019
DOB NOWSupported ScaffoldSigned-offKINGS GROUP NY CORP08/29/2019
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP08/29/2019
+ 20 more permits on file
1 project · most recent 11/07/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/07/2024Signed-offSD BUILDERS AND CONSTRUCTAir Conditioning Systems, Heating Systems
Cooling
Lg ARNU183M1A4 19,100 BTU · Vrf Indoor ×9
ARNU283M2A4 28,000 BTU · Vrf Indoor ×6
ARNU123M1A4 12,300 BTU · Vrf Indoor ×3
ARNU123SJA4 12,300 BTU · Vrf Indoor ×3
ARNU183SKA4 19,100 BTU · Vrf Indoor ×3
ARNU183TQD4 19,100 BTU · Vrf Indoor ×3
ARNU243M1A4 24,200 BTU · Vrf Indoor ×3
ARNU363M2A4 36,000 BTU · Vrf Indoor ×3
ARNU423M2A4 42,000 BTU · Vrf Indoor ×3
ARUB060GSS4 60,000 BTU · Vrf Outdoor ×3
ARUM072BTE5 72,000 BTU · Vrf Outdoor ×3
ARUM121BTE5 119,700 BTU · Vrf Outdoor ×3
Heating
Berko FFCH-548 13,650 BTU · Electric Heater ×96
SRA1512DSFPB 2,558 BTU · Electric Heater ×18
HUHAA320 10,200 BTU · Electric Heater ×3
HUHAA520 17,000 BTU · Electric Heater ×3
Lg ARNU183M1A4 21,500 BTU · Vrf Indoor ×9
ARNU283M2A4 31,500 BTU · Vrf Indoor ×6
ARNU123M1A4 13,600 BTU · Vrf Indoor ×3
ARNU123SJA4 13,600 BTU · Vrf Indoor ×3
ARNU183SKA4 21,500 BTU · Vrf Indoor ×3
ARNU183TQD4 21,500 BTU · Vrf Indoor ×3
ARNU243M1A4 27,300 BTU · Vrf Indoor ×3
ARNU363M2A4 36,000 BTU · Vrf Indoor ×3
ARNU423M2A4 47,000 BTU · Vrf Indoor ×3
ARUB060GSS4 64,000 BTU · Vrf Outdoor ×3
ARUM072BTE5 81,000 BTU · Vrf Outdoor ×3
ARUM144BTE5 162,000 BTU · Vrf Outdoor ×3
1 project · most recent 11/07/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/07/2024Signed-offPACIFIC PLBG&HTG CORPGas, Storm, Water/Sanitary
3 projects · most recent 11/06/2023
General Wiring
FiledStatusContractorScope
11/06/2023CompleteAPPROVED ELECTRIC CORP.General Wiring
05/18/2023CompleteKJK ELECTRIC INC—
02/13/2023CompleteSOLAS ELECTRICAL CORP—
2 projects · most recent 11/07/2024
Concrete Steel Masonry
FiledStatusContractorScope
11/07/2024Signed-offPACIFIC PLBG&HTG CORPSteel, Concrete, Masonry
———Concrete
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/06/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
02/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/16/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
01/09/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/04/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/21/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
11/05/2024Fenestration areasSoorjbally Harilallenergy_progress
11/05/2024Lighting in dwelling unitsSoorjbally Harilallenergy_progress
11/05/2024Interior lighting powerSoorjbally Harilallenergy_progress
11/05/2024Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
11/05/2024Air barrier - visual inspectionSoorjbally Harilallenergy_progress
11/05/2024Fenestration air leakageSoorjbally Harilallenergy_progress
11/05/2024Exterior lighting powerSoorjbally Harilallenergy_progress
11/05/2024Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
11/05/2024MeteringSoorjbally Harilallenergy_progress
11/05/2024Air barrier — testing Soorjbally Harilallenergy_progress
11/05/2024Electrical motors and elevatorsSoorjbally Harilallenergy_progress
11/05/2024Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
11/05/2024Sprayed fire-resistant materialsSOORJBALLY HARILALLspecial
11/05/2024Energy Code Compliance InspectionsSoorjbally Harilallprogress
11/05/2024Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
11/05/2024VestibulesSoorjbally Harilallenergy_progress
11/05/2024Lighting controlsSoorjbally Harilallenergy_progress
11/05/2024Insulation placement and R valuesSoorjbally Harilallenergy_progress
11/05/2024Maintenance informationSoorjbally Harilallenergy_progress
03/12/2024Energy Code Compliance InspectionsSoorjbally Harilallprogress
03/12/2024Mechanical SystemsSOORJBALLY HARILALLspecial
03/12/2024Heating SystemsSOORJBALLY HARILALLspecial
03/12/2024HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
03/12/2024Maintenance informationSoorjbally Harilallenergy_progress
03/12/2024HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
Latest 25 of 150.
▾Documents — 306 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch41
08/26/2026Q00649359-I1Request digital key ↗
08/25/2026Q00777699-I1Request digital key ↗
08/25/2026Q00827586-I1Request digital key ↗
Showing 3 of 41 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
08/28/2026Q00168944-I1Request digital key ↗
08/28/2026Q00354585-I1Request digital key ↗
08/28/2026Q00354450-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/29/2026Q00211710-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00217870-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00217875-I1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION18
08/27/2024421151960Open ↗
08/08/2024421794240Open ↗
09/29/2021440631194Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION8
09/17/2019421725146Open ↗
02/24/2016421151960Open ↗
12/10/2015421151960Open ↗
Showing 3 of 8 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation4
01/26/2021440631194Open ↗
01/26/2021440631185Open ↗
01/13/2021440631185Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/18/2016421151960Open ↗
▸BISRESCISSION OF INTENT TO REVOKE APPROVAL/PERMIT1
01/28/2016421151960Open ↗
▸Zoning, Tax Lot & Property Records18
▸DOB NOWZD1: DOB Zoning Diagram7
08/23/2026Q00623509-A9Open ↗
08/23/2026Q00623509-A4Open ↗
08/23/2026Q00623509-P9Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/23/2026Q00623509-I1Open ↗
08/23/2026Q00623509-A9Open ↗
08/23/2026Q00623509-A4Open ↗
Showing 3 of 5 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
01/22/2021440631194Open ↗
01/22/2021440631185Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/13/2016421151960Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
08/15/2018400662118Open ↗
▸BISZONING DIAGRAM1
01/30/2016421151960Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00623509-I1Open ↗
▸Seals & Professional Certifications65
▸DOB NOWDPL-1: Design Professional Seal & Signature46
08/29/2026Q00211710-I1Open ↗
08/28/2026Q00217870-I1Open ↗
08/28/2026Q00217875-I1Open ↗
Showing 3 of 46 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/22/2019421725146Open ↗
09/17/2019421725146Open ↗
06/22/2016421151960Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q00217875-I1Open ↗
08/27/2026Q00168944-I1Open ↗
08/24/2026Q00217870-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
11/13/2020440631194Open ↗
11/04/2020440631185Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/30/2015421151960Open ↗
12/10/2008410203113Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/30/2015421151960Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/13/2020440631185Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/10/2008410203113Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026Q00649359-I1Open ↗
▸Trade Schedules & Equipment15
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)7
08/23/2026Q00623509-I1Open ↗
08/23/2026Q00623509-A9Open ↗
08/23/2026Q00623509-P9Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
05/09/2016421151960Open ↗
02/05/2016421151960Open ↗
08/13/2015421151960Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRIC CUT-OFF1
09/17/2019421725146Open ↗
▸BISGAS CUT-OFF1
09/17/2019421725146Open ↗
▸BISSEWER CUT-OFF1
09/17/2019421725146Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/23/2026Q00623509-I1—
▸Safety & Tenant Protection24
▸BISSTREET TREE CHECKLIST8
01/22/2021440631194Open ↗
01/13/2021440631185Open ↗
11/13/2020440631194Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Checklist6
08/23/2026Q00623509-I1Open ↗
08/23/2026Q00623509-A9Open ↗
08/23/2026Q00623509-A4Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
01/05/2021440631185Open ↗
01/05/2021440631194Open ↗
▸BISSTREET TREES SITE PLAN2
01/05/2021440631185Open ↗
01/05/2021440631194Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/17/2019421725146Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/17/2019421725146Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
09/17/2019421725146Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00623509-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00623509-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00623509-I1Open ↗
▸Environmental & Asbestos10
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
09/17/2019421725146Open ↗
09/17/2019421725146Open ↗
09/17/2019421725146Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
12/10/2008410203113Open ↗
04/01/2008410091145Open ↗
▸BISRODENT CONTROL1
09/17/2019421725146Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/13/2016421151960Open ↗
10/05/2015421151960Open ↗
05/30/2015421151960Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026Q00623509-S4Open ↗
08/13/2026Q00623509-S5Open ↗
08/13/2026Q00623509-S2Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/22/2016421151960Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00623509-I1Open ↗
▸Approvals, Objections & Sign-offs26
▸BISLETTERS - SUPPORTING DOCUMENTATION11
09/17/2019421725146Open ↗
09/17/2019421725146Open ↗
09/17/2019421725146Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
06/19/2017421151960Open ↗
03/22/2017421151960Open ↗
12/12/2016421151960Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/30/2015421151960Open ↗
03/04/2015421083062Open ↗
12/10/2008410203113Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
10/05/2015421151960Open ↗
08/13/2015421151960Open ↗
▸BISLANDMARKS APPROVAL1
09/17/2019421725146Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
09/17/2019421725146Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT8
06/22/2016421151960Open ↗
05/30/2015421151960Open ↗
03/04/2015421083062Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
09/17/2019421725146Open ↗
02/24/2016421151960Open ↗
10/05/2015421151960Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
09/17/2019421725146Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET6
08/23/2019421794240Open ↗
05/02/2019421725146Open ↗
05/30/2015421151960Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
08/15/2018400662118Open ↗
01/11/2018400662118Open ↗
12/08/2017400215619Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/13/2020440631194Open ↗
11/04/2020440631185Open ↗
▸BISADDITIONAL INFORMATION2
12/08/2017400215619Open ↗
09/18/2015421151960Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/23/2019421794240Open ↗
▸Other Documents34
▸DOB NOWProperty Ownership Certification10
08/23/2026Q00623509-I1Open ↗
08/23/2026Q00623509-A9Open ↗
08/23/2026Q00623509-P9Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSite Survey: Initial7
08/23/2026Q00623509-I1Open ↗
08/23/2026Q00623509-A9Open ↗
08/23/2026Q00623509-A4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/23/2026Q00623509-I1Open ↗
08/23/2026Q00623509-P8Open ↗
08/23/2026Q00623509-A9Open ↗
Showing 3 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION4
09/29/2021440631185Open ↗
09/29/2021440631194Open ↗
09/16/2021440631185Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
07/13/2016421151960Open ↗
03/04/2015421083062Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
11/13/2020440631194Open ↗
11/04/2020440631185Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00623509-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00623509-S3Open ↗