← Back
Elevator apt, semi-fireproof without stores
The Msgr Joseph F. Stedman Apts
920 53 STREET · BIN 3343065
💬 Discuss this project
1999Year Built
5Stories
D1Building Class
R6Zoning
59,849 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · 27,545 sf lot · 2.17 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 8 docs
Cellar1p · 1 filing · 4 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIVONIA C3 HDFC404/09/2026
STEEL SYSTEMS LLC503/22/2026
PROGRESS OF PEOPLES MANAGEMENT203/21/2026
DIRECTOR103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS112/05/2025
SIRI + MARSIK ARCH. P.C.312/16/2021
ADAL ENGINEERING PLLC101/22/2021
AMPOL ENGINEERING103/17/2020
LIGHT HOUSE106/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P WOLFE CONSULTANTS803/21/2026
BIG ORANGE EXPEDITING203/21/2026
HH BUILDING CONSULTING & ARCHITECTU203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL SYSTEMS LLCGeneral Contractor303/21/2026
ACCORD POWER INCGeneral Contractor204/09/2026
TNT HOME IMPROVEMENT LLCGeneral Contractor107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
TRI CITY MECHANICAL GROUP CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561112/05/2025
M. INT'L ENGINEERING PLLC3129212/16/2021
Building Lifecycle
All (11)Filed (7)Signed Off (4)
12/05/2025
Filed — Alteration
Installation of 74.36 kw solar energy system on roof. No change of occupancy, use or egress.
B01326756-I1
05/13/2025
Signed off — Alteration
B00051961-I1
01/26/2022
Signed off — Alteration
B00327715-I1
01/06/2022
Signed off — Alteration
Installation of Hvac unit and associated duct work in conjunction to DOB application# 322071672.
B00327695-I1
01/06/2022
Signed off — Alteration
B00510808-I1
12/16/2021
Filed — Alteration
Installation of Hvac unit and associated duct work in conjunction to DOB application# 322071672.
B00327695-P1
04/30/2021
Filed — Alteration
B00510808-I1
01/22/2021
Filed — Alteration
INSTALLATION OF THE 2 FIXTURE BATHROOM ON THE BASEMENT LEVEL AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00420878-I1
03/17/2020
Filed — Alteration
B00327715-I1
03/17/2020
Filed — Alteration
Installation of Hvac unit and associated duct work in conjunction to DOB application# 322071672.
B00327695-I1
06/11/2018
Filed — Alteration
B00051961-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedACCORD POWER INC03/02/2026
DOB NOWSolarPermit IssuedACCORD POWER INC12/15/2025
DOB NOWMechanical SystemsSigned-offTNT HOME IMPROVEMENT LLC09/17/2021
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR06/30/2021
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP06/18/2020
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC06/11/2018
BISOTISSUEDCRAINE AIR CONDITIONING INC11/29/2018
BISOTISSUEDVICHIHEL RESTORATION, INC04/19/2018
BISEQISSUEDFRANK CORIGLIANO CONTRACTING INC12/17/1999
BIS—ISSUEDFRANK CORIGLIANO CONTRACTING INC08/10/1999
BISEQISSUEDFRANK CORIGLIANO CONTRACTING INC08/10/1999
BISSPISSUEDJ ES PLBG & HTG CORP04/16/1999
BISSDISSUEDJ.E.S. PLBG & HTG CORP04/09/1999
BISPLISSUEDJ.E.S. PLBG & HTG CORP04/09/1999
BISPLISSUEDJ.E.S. PLBG & HTG CORP03/08/1999
BISEQISSUEDFRANK CORIGLIANO CONTRACTING INC11/23/1998
BIS—ISSUEDFRANK CORIGLIANO CONTRACTING INC11/23/1998
1 project · most recent 01/22/2021
Water/Sanitary
FiledStatusContractorScope
01/22/2021——Water/Sanitary
2 projects · most recent 12/02/2025
FiledStatusContractorScope
12/02/2025Permit IssuedACCORD POWER ELECTRIC LLC—
06/05/2018CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 12/05/2025
FiledStatusContractorScope
12/05/2025Permit IssuedACCORD POWER INC338 panels, 148.72 kw, 10,728.41 roof_area_sqft
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/10/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/12/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
12/01/2025Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
12/01/2025Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
12/01/2025FinalMalathi Ananthakrishnanprogress
12/01/2025Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
12/01/2025Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
12/17/2021HVAC and service water heating equipment NANIK MASSANDenergy_progress
12/17/2021Mechanical SystemsNANIK MASSANDspecial
12/17/2021FinalNANIK MASSANDprogress
12/17/2021Maintenance informationNANIK MASSANDenergy_progress
12/17/2021Duct leakage testing NANIK MASSANDenergy_progress
12/17/2021HVAC and service water heating system controls NANIK MASSANDenergy_progress
12/17/2021Shutoff dampersNANIK MASSANDenergy_progress
12/15/2021HVAC and service water heating system controls NANIK MASSANDenergy_progress
12/15/2021HVAC and service water heating equipment NANIK MASSANDenergy_progress
12/15/2021FinalNANIK MASSANDprogress
12/15/2021Duct leakage testing NANIK MASSANDenergy_progress
12/15/2021Mechanical SystemsNANIK MASSANDspecial
12/15/2021Shutoff dampersNANIK MASSANDenergy_progress
12/15/2021Maintenance informationNANIK MASSANDenergy_progress
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch3
09/03/2026B00051961-I1Request digital key ↗
09/01/2026B00510808-I1Request digital key ↗
08/19/2026B01326756-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00327695-P1Request digital key ↗
09/02/2026B00327695-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00327715-I1Request digital key ↗
09/01/2026B00420878-I1Request digital key ↗
▸Applications & Permits8
▸BISWORK PERMIT APPLICATION5
05/28/2021322071672Open ↗
12/04/2018322027640Open ↗
11/30/2018322027640Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
01/07/2022322071672Open ↗
03/05/2020322071672Open ↗
04/19/2018321729224Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature15
08/26/2026B00327695-I1Open ↗
08/26/2026B00327695-I1Open ↗
08/26/2026B00327695-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/05/2020322071672Open ↗
01/29/2019322027640Open ↗
01/10/2019322027640Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026B00051961-I1Open ↗
09/01/2026B00510808-I1Open ↗
08/13/2026B00327695-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026B00327695-I1Open ↗
08/25/2026B00327695-P1Open ↗
08/25/2026B01326756-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/30/2018322027640Open ↗
03/29/2018321729224Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/30/2018322027640Open ↗
03/29/2018321729224Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/29/2019322027640Open ↗
11/30/2018322027640Open ↗
▸BISEQUIPMENT USE PERMITS1
01/29/2019322027640Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
04/03/2020322071672Open ↗
11/30/2018322027640Open ↗
03/29/2018321729224Open ↗
▸BISSTREET TREE CHECKLIST1
11/30/2018322027640Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/05/2020322071672Open ↗
11/30/2018322027640Open ↗
04/19/2018321729224Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00510808-I1Open ↗
08/13/2026B00420878-I1Open ↗
08/13/2026B00327715-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/05/2020322071672Open ↗
01/10/2019322027640Open ↗
12/31/2018321729224Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/28/2021322071672Open ↗
04/03/2020322071672Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
01/10/2019322027640Open ↗
11/08/2018321729224Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/20/2022322071672Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/20/2022322071672Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/28/2021322071672Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/03/2026B00051961-I1Open ↗
09/01/2026B00510808-I1Open ↗
08/13/2026B00327715-I1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
01/21/2022322071672Open ↗
02/20/2019321729224Open ↗
01/29/2019322027640Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL1
01/20/2022322071672Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
03/05/2020322071672Open ↗
01/16/2019322027640Open ↗
01/10/2019322027640Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/20/2022322071672Open ↗
▸Filing & Intake Forms11
▸BISBOROUGH INTAKE FORM7
03/21/2020322071672Open ↗
02/20/2019321729224Open ↗
01/29/2019322027640Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
03/05/2020322071672Open ↗
11/30/2018322027640Open ↗
03/29/2018321729224Open ↗
▸BISADDITIONAL INFORMATION1
01/11/2022322071672Open ↗