REPAIR/REPLACE FACADE AS NECESSARY TO INCLUDE MASONRY, POINTING, LINTELS, PARAPET AND MASONRY CORNER RECONSTRUCTION, AS PER DRAWINGS
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
RoofOutrigger beam and piping installationUnder Construction1p · 1 filing · 6 docs
ArchitecturePlumbingStructural
Issued Permit Scope
General Construction
Additional Delta Outriggers - D3. Changing parameters of Outriggers D1 and D2.
On file for this project
6 documents · 1 drawing sheet
Floor 13Apartment interior renovation and plumbing work2 filings · 17 docs
ArchitectureDMGeneralPlumbingOther
Issued Permit Scope
Plumbing
Project M99790836Signed-off · 06/28/2021
interior renovation of apartment with associated plumbing work. no change in use, egress or occupancy
interior renovation of apartment with associated plumbing work. Switching from gas to electric stove. no change in use, egress or occupancy
On file for this project
17 documents
Floor 12
Floor 11Under Construction1 filing · 8 docs
ArchitectureEquipmentGeneralPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
Renovate 2 bathrooms, renovate kitchen, eliminate half bath, relocate laundry, new gas piping to relocate gas meter, filed in conjunction with general construction. (total SF for plumbing work is 330 SF)
On file for this project
8 documents
Floor 102 filings · 16 docs
ArchitectureEquipmentGeneralPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
Minor partition and cabinet removal, new partitions and doors, dropped ceilings, new finishes and cabinets as per plans filed. No change to Use, Occupancy or Egress.
On file for this project
9 documents
New, Replaced, Capped & Removed and Relocated Plumbing fixtures and piping, as per plans filed. No change to Use Occupancy or Egress
On file for this project
12 documents
Floor 9Unit 92, Unit 94, Unit 9S3 filings · 12 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
RENOVATIONS TO APT. #92, INCLUDING NON-STRUCTURAL DEMOLITION, GENERAL CONSTRUCTION & FINISHES, AND REPLACE WINDOWS IN EXIST'G OPENINGS, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
14 documents
Installation of a hung ceiling in apartment #94
On file for this project
5 documents
Project M00575653Permit Issued · 02/09/2022
NEW MASONRY OPENINGS OPENINGS FOR THRU WALL AC UNITS AT APARTMENT #9S, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Floor 8
Floor 7
Floor 6
Floor 5Unit 555p · 2 filings · 16 docs
ArchitectureDMEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH GENERAL CONSTRUCTION INTERIOR RENOVATION APPLICATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents · 3 drawing sheets
INTERIOR RENOVATION: REMOVAL OF GWB, FLR, CLG & WALL FINISHES & LIGHT FIXTS. INSTALL NEW GWB, FLR, CLG & WALL FINISHES. INSTALL REPLACEMENT LIGHT FIXTS. NO PROPOSED CHANGE TO USE, EGRESS OR OCCUPANCY. NO ENLARGEMENT OR DEVELOPMENT.
On file for this project
12 documents · 4 drawing sheets
Floor 4
Floor 3Unit 351 filing · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Apt, 35 on the 3 floor: plumbing plans filed in conjunction with architecturals.
On file for this project
38 documents
Floor 2Unit 21Under Construction1 filing · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
PLUMBING WORK ASSOCIATED WITH RENOVATION OF APARTMENT 21. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL AS PER PLANS AND APPLICATIONS.
On file for this project
21 documents
Floor 1Unit 1048p · 8 filings · 12 docs
ArchitectureDMElectricalEquipmentGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Furnish and install new indoor split system, condensers as per plans filed. No change to Use, Occupancy or Egress
On file for this project
4 documents
replace existing HVAC units with new VRF system
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
CellarBoiler replacement5p · 5 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · Plumbing
REPLACE BOILER AND OIL BURNER AND CHANGE GRADE OF OIL FROM #4 TO #2.
On file for this project
11 documents
replace existing HVAC units with new VRF system
On file for this project
5 documents · 2 drawing sheets
install new handicap restroom, bar equipment and replace (11) commercial gas cooking equipment to existing restaurant.
On file for this project
22 documents
Latest 3 of 5 filings on this floor.
Site & exteriorTemporary sidewalk shed installation8 filings · 16 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 12 drawing sheets
INSTALLATION OF TEMPORARY STORAGE OF MATERIAL AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.