Whole building & multi-floor projectsPipe Scaffold and Sidewalk Shed1 filing
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH MASONRY REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
12 documents
Floor 14Unit 14A, Unit 14B4 filings · 8 docs
ElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Structural · Supported Scaffold
Filing herewith for installation of HVAC equipment servicing units 13A & 14A
On file for this project
5 documents
Install Split Air Conditioning Units, Piping ,Ductwork, Kitchen, Bathroom & Dryer Exhaust Ductwork up to Roof, Steam Radiators, replace Thru-Wall A/C Units within existing sleeves
On file for this project
18 documents
Install Structural Steel Angles, Metal Deck & Concrete to Infill Slab opening
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 13Unit 13A, Unit 13B, Unit 13D6 filings · 8 docs
ElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Structural · Supported Scaffold
Install new split air conditioning system with one through-wall compressor/condenser and one new interior ducted air handler. Replace all perimeter heating elements, provide exhaust fan and controls for all.
On file for this project
15 documents
Filing herewith for installation of HVAC equipment servicing units 13A & 14A
On file for this project
5 documents
REPLACE: 1 WATER CLOSET, 1 SHOWER, RELOCATE: 1 LAV, 1 RES SINK, REMOVE: 1 DISHWASHER, 1 GAS METER, 1 RANGE, GAS PIPING, NEW: 1 FUNNEL DRAIN
On file for this project
10 documents
Latest 3 of 6 filings on this floor.
Floor 12
Floor 11
Floor 10Unit 10C2p · 2 filings · 8 docs
ElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Supported Scaffold
updgrade hvac at the Apt# 9C, 10C on 9 & 10th floor. as per plans
On file for this project
16 documents · 2 drawing sheets
REMOVE AND INSTALL PLUMBING FIXTURES IN APT#9C,10C AS PER PLANS SUBMITTED HEREWITH.
On file for this project
15 documents
Floor 9Unit 9C2 filings · 8 docs
ElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Supported Scaffold
updgrade hvac at the Apt# 9C, 10C on 9 & 10th floor. as per plans
On file for this project
16 documents
REMOVE AND INSTALL PLUMBING FIXTURES IN APT#9C,10C AS PER PLANS SUBMITTED HEREWITH.
On file for this project
15 documents
Floor 8Unit 8A, Unit 8DUnder Construction5p · 2 filings · 20 docs
ArchitectureElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
INSTALLATION OF STEEL SUPPORT BEAM AND STEEL STAIR. NO CHANGE OF USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
6 documents · 2 drawing sheets
RENOVATION OF EXISTING APARTMENT#7A,8A & 8D INCLUDING PARTITION. NO CHANGE OF USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
18 documents · 3 drawing sheets
Floor 7Unit 7AUnder Construction7p · 2 filings · 20 docs
ArchitectureElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
INSTALLATION OF STEEL SUPPORT BEAM AND STEEL STAIR. NO CHANGE OF USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
6 documents · 2 drawing sheets
RENOVATION OF EXISTING APARTMENT#7A,8A & 8D INCLUDING PARTITION. NO CHANGE OF USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
18 documents · 6 drawing sheets
Floor 6Unit 6A, Unit 6C, Unit 6D +111p · 2 filings · 20 docs
ArchitectureElectricalEquipmentMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Replace existing residential washing machine and branch piping at existing location/laundry room at 6th floor of duplex dwelling unit 5/6C, No change to use, egress or occupancy.
On file for this project
16 documents
Plumbing work in conjunction with the renovation of apartment #5A/6AD. No change to use, egress or occupancy
On file for this project
45 documents · 11 drawing sheets
Floor 5Unit 5A12p · 2 filings · 20 docs
ArchitectureDMElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Replace existing residential washing machine and branch piping at existing location/laundry room at 6th floor of duplex dwelling unit 5/6C, No change to use, egress or occupancy.
On file for this project
16 documents
Plumbing work in conjunction with the renovation of apartment #5A/6AD. No change to use, egress or occupancy
On file for this project
45 documents · 12 drawing sheets
Floor 4Unit 4A5p · 4 filings · 20 docs
ArchitectureElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
Installation of five (5) 2-ton compressor units for an existing duplex. No change to use, occupancy or egress.
On file for this project
14 documents · 2 drawing sheets
Structural work proposed for an existing duplex. No change to use, occupancy or egress.
On file for this project
16 documents
Renovation of an existing duplex. No change to use, occupancy or egress.
On file for this project
14 documents
Latest 3 of 4 filings on this floor.
Floor 3Unit 3A8p · 4 filings · 20 docs
ArchitectureElectricalEquipmentMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
Installation of five (5) 2-ton compressor units for an existing duplex. No change to use, occupancy or egress.
On file for this project
14 documents · 4 drawing sheets
Structural work proposed for an existing duplex. No change to use, occupancy or egress.
On file for this project
16 documents
Renovation of an existing duplex. No change to use, occupancy or egress.
On file for this project
14 documents
Latest 3 of 4 filings on this floor.
Floor 2
Floor 1
CellarTenant fitness room plumbing4p · 3 filings · 16 docs
ArchitectureDMGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Installation of new and relocated plumbing fixtures in the area of work in the cellar level including (2) wc. (1) lav., (1) drinking fountain, (1) funnel drain. GC filed under
On file for this project
4 documents
Scope of work; VRF heat pump systems with indoor air handlers complete with fully ducted distribution. Programmable controls and condensate disposal systems. Design of mechanical exhaust system.
On file for this project
8 documents
Renovate existing tenant accessory spaces: remove metal storage bin partitions, remove all partitions and doors, in storage rm., remove one window, remove one exterior partition below sill and prepare for new egress door. Pl& MS filed separately.
On file for this project
4 documents · 4 drawing sheets
Site & exteriorHeavy duty sidewalk shed installation2 filings · 8 docs
ElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH MASONRY FACADE WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
6 documents · 5 drawing sheets
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
4 documents · 9 drawing sheets