← Back
Walk-up cooperative
94-11 69 AVENUE
QUEENS · BIN 4076285
💬 Discuss this project
1938Year Built
3Stories
C6Building Class
R4BZoning
43,599 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized3 Open Violations ▸
Walk-up cooperative · Owner of record: 94 11 69 AV CORP · 20,000 sf lot · 2.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof3p · 3 filings · 17 docs
Floor 31 filing · 2 docs
Floor 21 filing · 2 docs
Floor 11 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
94-11 69 AVENUE1003/22/2026
94-11 69TH AVENUE1603/21/2026
94-11 69 A103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJM+A ARCHITECTS, PLLC211/18/2025
PAUL PERDEK, PROF. ENG. PLLC506/23/2025
RIGID STRUCTURAL DESIGN, LLC112/23/2024
ASIF JAMIL, RA107/09/2021
DAVID MCDONALD ARCHITECT206/02/2021
PVE ENGINEERING104/15/2021
JAMES H. FAHEY111/08/2017
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHNELLBACHER-SENDON GRO*General Contractor507/08/2026
J.V.S. CONTRACTING GROUPGeneral Contractor407/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor203/21/2026
CHANDRABALI RAMANANDGeneral Contractor103/21/2026
COMCELL CONSTRUCTION CORP.General Contractor107/08/2026
PAUL GENNAROElectrical103/21/2026
BMT PLUMBING&HEATING LLCPlumbing107/08/2026
ROYAL HOME IMPROVEMENTS IElectrical103/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SAG ENGINEERING & CONSULT608211/18/2025
DAVID MCDONALD ARCHITECT3239106/02/2021
LEO Y LEE ASSOCIATES2481104/15/2021
STRUCTURAL CONSULTING SER1919111/08/2017
Building Lifecycle
All (73)Filed (15)Permit Issued (13)Signed Off (8)Violation (8)Inspection (5)Objection (18)Special Inspection (6)
05/06/2026
Violation issued (HPD, closed)
A
01/07/2026
Signed off — Alteration
Q01251002-I1
12/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01159552-I1
12/01/2025
Signed off — Alteration
EXTERIOR REPAIR OF SEL PORTIONS OF EX FACADES; FACE BRICK REPLACEMENT, PARAPET RECONSTRUCTION & REPAIR, INCL ASSOC COMPONENTS & ACCESSORIES (SEL PORTIONS OF ALL FACADES). THE WORK ALSO INCLUDES, SEL ROOF REPLACEMENT & INSTALL OF PARAPET WROUGHT IRON BARS.
Q01094187-I1
11/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
Chester Kowalski
11/19/2025
Special inspection requirement — Masonry
Chester Kowalski
11/19/2025
Special inspection requirement — Final
Chester Kowalski
11/18/2025
Filed — Alteration
EXTERIOR REPAIR OF SEL PORTIONS OF EX FACADES; FACE BRICK REPLACEMENT, PARAPET RECONSTRUCTION & REPAIR, INCL ASSOC COMPONENTS & ACCESSORIES (SEL PORTIONS OF ALL FACADES). THE WORK ALSO INCLUDES, SEL ROOF REPLACEMENT & INSTALL OF PARAPET WROUGHT IRON BARS.
Q01094187-P1
09/12/2025
Filed — Alteration
Q01251002-P1
08/13/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01155882-I1
07/10/2025
Permit issued — Suspended Scaffold
Q01251002-I1-SC
07/03/2025
Filed — Alteration
Q01251002-I1
06/23/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01159552-P3
06/10/2025
Permit issued — General Construction
Q01094187-I1-GC
05/29/2025
Permit issued — Supported Scaffold
Q01159552-I1-SF
04/11/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01159552-P2
01/30/2025
Violation issued (ECB, closed)
Unknown
01/30/2025
Violation issued (ECB, closed)
Construction
01/28/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01159552-P1
01/14/2025
Permit issued — Supported Scaffold
Q01159552-I1-SF
01/10/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01159552-I1
12/26/2024
Permit issued — Sidewalk Shed
Q01155882-I1-SH
12/23/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01155882-I1
12/13/2024
Permit issued — General Construction
Q01094187-I1-GC
12/02/2024
Filed — Alteration
EXTERIOR REPAIR OF SEL PORTIONS OF EX FACADES; FACE BRICK REPLACEMENT, PARAPET RECONSTRUCTION & REPAIR, INCL ASSOC COMPONENTS & ACCESSORIES (SEL PORTIONS OF ALL FACADES). THE WORK ALSO INCLUDES, SEL ROOF REPLACEMENT & INSTALL OF PARAPET WROUGHT IRON BARS.
Q01094187-I1
05/02/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2023
Signed off — Alteration
Q00498498-I1
11/18/2022
Signed off — Alteration
PLUMBING WORK ASSOCIATED WITH GENERAL INTERIOR RENOVATION OF EXISTING APARTMENT 310, INCLUDING; RENOVATE KITCHEN & BATHROOM, NEW FINISHES & FIXTURES.
Q00522888-I1
11/16/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2022
Permit issued — General Construction
Q00498498-I1-GC
07/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/06/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/23/2021
Signed off — Alteration
MINOR INTERIOR RENOVATION TO UPGRADE TO APARTMENT#310 INCLUDING REMOVING INTERIOR NON-BEARING WALL AND NEW FINISHES & FIXTURES. RELATED JOB APPLICATION FOR PLUMBING: Q0052288
Q00488266-I1
09/10/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/26/2021
Permit issued — Plumbing
Q00522888-I1-PL
07/13/2021
Permit issued — Supported Scaffold
Q00554318-I1-SF
07/09/2021
Filed — Alteration
Q00554318-I1
06/25/2021
Permit issued — Sidewalk Shed
Q00539818-I1-SH
06/24/2021
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00539818-I1
06/11/2021
Permit issued — General Construction
Q00488266-I1-GC
06/02/2021
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH GENERAL INTERIOR RENOVATION OF EXISTING APARTMENT 310, INCLUDING; RENOVATE KITCHEN & BATHROOM, NEW FINISHES & FIXTURES.
Q00522888-I1
06/02/2021
Filed — Alteration
MINOR INTERIOR RENOVATION TO UPGRADE TO APARTMENT#310 INCLUDING REMOVING INTERIOR NON-BEARING WALL AND NEW FINISHES & FIXTURES. RELATED JOB APPLICATION FOR PLUMBING: Q0052288
Q00488266-I1
05/18/2021
Permit issued — General Construction
Q00498498-I1-GC
04/15/2021
Filed — Alteration
Q00498498-I1
03/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
David McDonald
03/18/2021
Special inspection requirement — Final
David McDonald
03/18/2021
Special inspection requirement — Lighting in dwelling units
David McDonald
10/18/2018
Signed off — Alteration
INSTALL NEW TELECOMMUNICATIONS CABINETS, RELATED DUNNAGE, AND RELATED ANTENNAS ON ROOF IN CONFORMANCE WITH TPPN # 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00001558-I1
03/08/2018
Permit issued — Antenna
Q00001558-I1-AN
02/02/2018
Objection raised — 1998-AN AC 28-103.14.1-TPPN-98
02/02/2018
Objection resolved — Addressed
11/08/2017
Filed — Alteration
INSTALL NEW TELECOMMUNICATIONS CABINETS, RELATED DUNNAGE, AND RELATED ANTENNAS ON ROOF IN CONFORMANCE WITH TPPN # 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00001558-I1
11/08/2017
Objection raised — 2014-AN BC 1704-Building Code-
11/08/2017
Objection resolved — Addressed
11/08/2017
Objection raised — 1998-AN AC 28-103.14.1-Adminis
11/08/2017
Objection resolved — Addressed
11/08/2017
Objection raised — 1998-AN FC 504.4 TPPN 5/98-Bu
11/08/2017
Objection resolved — Addressed
11/08/2017
Objection raised — AN -Other
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSCHNELLBACHER-SENDON GROU07/10/2025
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*06/10/2025
DOB NOWSupported ScaffoldSigned-offSCHNELLBACHER-SENDON GRO*05/29/2025
DOB NOWSupported ScaffoldSigned-offSCHNELLBACHER-SENDON GRO*01/14/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC12/26/2024
DOB NOWGeneral ConstructionSigned-offSCHNELLBACHER-SENDON GRO*12/13/2024
DOB NOWGeneral ConstructionSigned-offJ.V.S. CONTRACTING GROUP10/10/2022
DOB NOWPlumbingSigned-offBMT PLUMBING&HEATING LLC07/26/2021
DOB NOWSupported ScaffoldPermit IssuedJ.V.S. CONTRACTING GROUP07/13/2021
DOB NOWSidewalk ShedPermit IssuedPOWERS BRIDGING & SCAFFOL06/25/2021
DOB NOWGeneral ConstructionSigned-offCHANDRABALI RAMANAND06/11/2021
DOB NOWGeneral ConstructionSigned-offJ.V.S. CONTRACTING GROUP05/18/2021
DOB NOWAntennaSigned-offCOMCELL CONSTRUCTION CORP03/08/2018
BISOTISSUEDNEB CONSTRUCTION CO LLC10/03/2018
BISPLISSUEDLLOYD G DRUMMOND PLBG&GEN09/26/2018
BISPLISSUEDP.A.C. HEATING INC05/22/2018
BISMHISSUEDCOMCELL CONSTRUCTION CORP.03/14/2018
BISOTISSUEDSUNRISE RENOVATION INC06/27/2017
BISPLISSUEDSAL NAPOLI PLBG & HTG CORP02/11/2016
BISOTISSUEDSUNRISE RENOVATION INC12/08/2015
BISFBISSUEDGEE CEE MECH SERVICE INC03/18/2014
BISPLISSUEDSERVICE TECH MECH&PLBG IN03/18/2014
BISOTISSUED94-11 69TH AVENUE CORPORATION06/02/2004
BISEQISSUEDTOWER BUILDING RESTORATION04/23/2001
BISOTISSUEDACCURA RESTORATION04/18/2001
BISOTISSUEDACCURA RESTORATION INC08/24/2000
BISEQISSUEDTOWER BLDG. RESTORATION CORP.08/22/2000
5 projects · most recent 12/18/2024
General Wiring
FiledStatusContractorScope
12/18/2024CompleteBOROWIDE ELECT'L CONTR'S—
06/22/2021CompleteOPTIMAL ELECTRIC, INC—
05/14/2018CompleteV. VASS ELECTRIC CORPGeneral Wiring
04/05/2018CompleteW 8 ELECTRIC CORPGeneral Wiring
04/03/2018CancelledBRANDL ELECTRIC INC.General Wiring
1 project · most recent 06/24/2021
Sidewalk Shed
FiledStatusContractorScope
06/24/2021Permit IssuedPOWERS BRIDGING & SCAFFOLSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/16/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/06/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/19/2025Tenant Protection Plan ComplianceChester Kowalskispecial
11/19/2025MasonryChester Kowalskispecial
11/19/2025FinalChester Kowalskiprogress
03/18/2021Fire-Resistant Penetrations and JointsDavid McDonaldspecial
03/18/2021FinalDavid McDonaldprogress
03/18/2021Lighting in dwelling unitsDavid McDonaldenergy_progress
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/27/2026Q00498498-I1Request digital key ↗
08/27/2026Q00522888-I1Request digital key ↗
08/27/2026Q00488266-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION12
05/16/2019421650494Open ↗
07/05/2018421650494Open ↗
02/14/2018421602466Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION10
01/26/2019421650494Open ↗
10/29/2018421650494Open ↗
06/06/2018421602466Open ↗
Showing 3 of 10 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/18/2019421650494Open ↗
▸Seals & Professional Certifications34
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
07/20/2019421650494Open ↗
06/19/2019421650494Open ↗
04/22/2019421602466Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026Q00498498-I1Open ↗
08/27/2026Q00522888-I1Open ↗
08/27/2026Q00488266-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/30/2026Q01094187-I1Open ↗
08/30/2026Q01094187-I1Open ↗
08/27/2026Q00488266-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026Q01094187-I1Open ↗
08/27/2026Q00488266-I1Open ↗
08/27/2026Q00488266-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/24/2014420955078Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/24/2014420955078Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
05/24/2019421650494Open ↗
05/16/2019421650494Open ↗
07/05/2018421650494Open ↗
Showing 3 of 8 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION2
08/13/2014420955078Open ↗
07/30/2014420955078Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/24/2014420955078Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
07/05/2018421650494Open ↗
02/14/2018421602466Open ↗
▸BISSTREET TREE CHECKLIST1
08/21/2018421650494Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
07/05/2018421650494Open ↗
02/14/2018421602466Open ↗
07/24/2015421190142Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00498498-I1Open ↗
08/27/2026Q00522888-I1Open ↗
08/27/2026Q00488266-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/24/2014420955078Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/18/2026Q01094187-I1Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
07/20/2019421650494Open ↗
06/19/2019421650494Open ↗
04/22/2019421602466Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/18/2019421650494Open ↗
04/22/2019421602466Open ↗
10/17/2017421190142Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00498498-I1Open ↗
08/13/2026Q00488266-I1Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS4
07/24/2015421190142Open ↗
07/14/2015421183132Open ↗
07/14/2015421178040Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/23/2019421650494Open ↗
05/10/2019421602466Open ↗
12/11/2018421190142Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/01/2018421602466Open ↗
02/14/2018421602466Open ↗
09/23/2014420955078Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
07/18/2019421650494Open ↗
04/22/2019421602466Open ↗
08/21/2018421650494Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION7
05/28/2019421650494Open ↗
09/17/2018421602466Open ↗
08/21/2018421650494Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
07/05/2018421650494Open ↗
02/14/2018421602466Open ↗
07/24/2015421190142Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM3
01/09/2018421183132Open ↗
01/09/2018421178040Open ↗
10/17/2017421190142Open ↗
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/13/2026Q01251002-I1Open ↗
08/13/2026Q01251002-P1Open ↗
▸DOB NOWCalculations2
08/13/2026Q01251002-P1Open ↗
08/13/2026Q01251002-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/14/2015421190142Open ↗