Elevator apt, semi-fireproof with stores
941 INTERVALE AVENUE
BRONX · BIN 2005359
💬 Discuss this project
1925Year Built
6Stories
D7Building Class
R7-1Zoning
57,063 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized32 Open Violations 16 unresolved · 16 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: BK CLUSTER HOUSING DEVELOPMENT FUND CORP ORATION · 10,625 sf lot · 5.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof12p · 3 filings · 20 docs
Floor 71 filing · 18 docs
Floor 611p · 3 filings · 20 docs
Floor 511p · 3 filings · 20 docs
Floor 411p · 3 filings · 20 docs
Floor 311p · 3 filings · 20 docs
Floor 211p · 3 filings · 20 docs
Floor 113p · 4 filings · 20 docs
CellarUnder Construction24p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BK CLUSTER HOUSING DEVELOPMENT FUND CORP ORATION1403/22/2026
941 INTERVALE REALTY9503/22/2026
941 INTERVALE AVE RALTY L303/22/2026
LEV MANAGEMENT203/22/2026
M I MANAGEMENT403/22/2026
INTERVALE 941203/22/2026
941 F O REALTY CORP.603/22/2026
F & O REALTY CORP203/22/2026
MARQUIS MANAGEMENT103/22/2026
OWNER OF 925-29 EAST 163103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/04/2019$11.7M—— → —$204/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OCV ARCHITECTS803/21/2026
CONSOLIDATED SCAFFOLD BRIDGE1203/21/2026
CSR EXPEDITERS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSOLIDATED SCAFFOLDINGGeneral Contractor1507/08/2026
A & M WARSHAW PLBG & HTGPlumbing907/08/2026
DEANGELIS PLBG & HTG.INCPlumbing503/22/2026
E.M.P. FIRE SPRINKLER LLCFire Protection407/08/2026
CONROCK CONSTRUCTION LLCGeneral Contractor407/08/2026
J-J PLUMBING CORPPlumbing307/08/2026
TWITTY, RONALDElectrical203/21/2026
GLAZIER LOCAL 1281Electrical203/21/2026
MANLEY, JAMESElectrical203/21/2026
QUEUE ELEC'L CONTRS, INCElectrical203/22/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
HERMAN, LAWRENCEElectrical103/21/2026
MAHRAJ, MOHAMMADElectrical103/21/2026
SIERRA, HERIBERTOElectrical103/21/2026
VALENTIS ELECTRIC, INC.Electrical103/22/2026
V. VASS ELECTRIC CORPElectrical103/22/2026
KING HOIST & SCAFFOLDINGGeneral Contractor107/08/2026
MEGA MECHANICAL INCGeneral Contractor107/08/2026
FINELLI, NICOLAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC8174406/09/2025
BECKER ENGINEERING, PC633411/25/2024
INTEGRITY CONSULTING SERV666101/27/2022
M. HAMDI GUNAL, PE, P.C.3000111/05/2019
Building Lifecycle
All (193)Filed (18)Permit Issued (24)Signed Off (3)Violation (60)Inspection (16)Objection (42)Special Inspection (30)
07/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2026
Violation issued (HPD, open)
B
05/08/2026
Violation issued (HPD, open)
A
05/08/2026
Violation issued (HPD, open)
C
05/08/2026
Violation issued (HPD, open)
A
05/08/2026
Violation issued (HPD, open)
B
04/23/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/15/2026
Permit issued — Mechanical Systems
X00469272-I1-MS
02/24/2026
Violation issued (HPD, closed)
B
02/05/2026
Signed off — Alteration
INSTALLATION OF (2) NEW BOILERS AT CELLAR FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY PROPOSED UNDER THIS APPLICATION.
X00432014-I1
01/29/2026
Violation issued (ECB, open)
Elevators
01/26/2026
Violation issued (HPD, closed)
C
01/26/2026
Violation issued (HPD, closed)
B
01/26/2026
Violation issued (HPD, closed)
C
01/24/2026
Violation issued (HPD, closed)
C
01/24/2026
Violation issued (HPD, closed)
C
11/21/2025
Signed off — Alteration
INSTALLATION OF 72 LF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
X00942518-I1
11/18/2025
Permit issued — Mechanical Systems
X00469272-I1-MS
10/17/2025
Violation issued (HPD, closed)
C
10/17/2025
Violation issued (HPD, closed)
A
10/01/2025
Violation issued (HPD, closed)
A
10/01/2025
Violation issued (HPD, closed)
A
09/24/2025
Violation issued (HPD, closed)
C
09/12/2025
Violation issued (HPD, closed)
B
09/12/2025
Violation issued (HPD, closed)
C
09/12/2025
Violation issued (HPD, closed)
B
09/05/2025
Violation issued (HPD, closed)
A
09/05/2025
Violation issued (HPD, closed)
A
09/05/2025
Violation issued (HPD, closed)
B
09/05/2025
Violation issued (HPD, closed)
C
09/05/2025
Violation issued (HPD, closed)
B
09/05/2025
Violation issued (HPD, closed)
C
09/05/2025
Violation issued (HPD, closed)
A
09/05/2025
Violation issued (HPD, closed)
A
09/05/2025
Violation issued (HPD, closed)
C
09/04/2025
Permit issued — Plumbing
X00431998-I1-PL
06/27/2025
Violation issued (HPD, closed)
C
06/27/2025
Violation issued (HPD, closed)
B
06/27/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
B
06/09/2025
Filed — Alteration
INSTALLATION OF DOMESTIC WATER HEATING SYSTEM FOR SPACE HEATING AND ALL ASSOCIATED PIPING.
X00469272-P1
06/05/2025
Violation issued (HPD, closed)
A
05/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
05/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
John Becker
05/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
John Becker
05/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
John Becker
05/20/2025
Special inspection requirement — Final
Ryan Hansen
05/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Ryan Hansen
05/20/2025
Special inspection requirement — Mechanical Systems
Ryan Hansen
05/20/2025
Special inspection requirement — Heating Systems
Ryan Hansen
04/10/2025
Violation issued (HPD, closed)
B
04/10/2025
Violation issued (HPD, closed)
B
04/10/2025
Violation issued (HPD, closed)
B
04/10/2025
Violation issued (HPD, closed)
B
03/06/2025
Violation issued (ECB, closed)
Construction
02/16/2025
Violation issued (HPD, closed)
A
02/16/2025
Violation issued (HPD, closed)
B
02/16/2025
Violation issued (HPD, closed)
B
01/29/2025
Violation issued (HPD, closed)
B
01/29/2025
Violation issued (HPD, closed)
C
Latest 60 of 193 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCONROCK CONSTRUCTION LLC04/15/2026
DOB NOWMechanical SystemsPermit IssuedCONROCK CONSTRUCTION LLC11/18/2025
DOB NOWPlumbingPermit IssuedA & M WARSHAW PLBG & HTG09/04/2025
DOB NOWPlumbingPermit IssuedA & M WARSHAW PLBG & HTG09/26/2024
DOB NOWPlumbingPermit IssuedA & M WARSHAW PLBG & HTG10/11/2023
DOB NOWSprinklersPermit IssuedE.M.P. FIRE SPRINKLER LLC10/10/2023
DOB NOWSidewalk ShedSigned-offKING HOIST & SCAFFOLDING10/03/2023
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING06/06/2023
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING06/06/2023
DOB NOWSprinklersSigned-offE.M.P. FIRE SPRINKLER LLC04/21/2023
DOB NOWConstruction FencePermit IssuedCONSOLIDATED SCAFFOLDING03/10/2023
DOB NOWBoiler EquipmentSigned-offJVR PLBG AND HEATING INC02/09/2023
DOB NOWMechanical SystemsPermit IssuedMEGA MECHANICAL INC11/16/2022
DOB NOWPlumbingPermit IssuedA & M WARSHAW PLBG & HTG11/03/2022
DOB NOWSprinklersSigned-offE.M.P. FIRE SPRINKLER LLC08/16/2022
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING06/08/2022
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING06/08/2022
DOB NOWPlumbingPermit IssuedA & M WARSHAW PLBG & HTG11/17/2021
DOB NOWSprinklersSigned-offE.M.P. FIRE SPRINKLER LLC09/13/2021
DOB NOWSidewalk ShedPermit IssuedCONSOLIDATED SCAFFOLDING06/08/2021
DOB NOWSupported ScaffoldPermit IssuedCONSOLIDATED SCAFFOLDING05/25/2021
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP03/05/2020
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP11/29/2019
DOB NOWPlumbingSigned-offJ-J PLUMBING CORP11/29/2019
BIS—ISSUEDCONROCK CONSTRUCTION LLC06/08/2023
BIS—ISSUEDCONROCK CONSTRUCTION LLC06/16/2022
BIS—ISSUEDCONROCK CONSTRUCTION LLC07/19/2021
BISPLISSUEDBRANCH PLUMBING LLC02/11/2019
BISOTISSUEDBLUE SQUARE CONSTRUCTION02/06/2019
BISOTRE-ISSUEDSQUAN CONSTRUCTION SERVIC01/25/2018
BISOTISSUEDSQUAN CONSTRUCTION SERVIC07/19/2016
BISFPISSUEDMASTER FIRE SYSTEMS, INC11/08/2007
BISOTISSUEDODYSSIA GLOBAL COMM. CORP06/03/2005
BISFPISSUEDFIRE COMMAND CO., INC.02/16/2005
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/29/2003
BISFPISSUEDMASTER FIRE SYSTEMS, INC12/01/1997
BISOTISSUEDAMERICAN SCAFFOLDING PARTS CORP11/14/1997
BISPLISSUEDWAGNER-WEINTRAUB PLBG. & HEATING11/14/1997
BISFBISSUEDAMBASSADRO FUEL & OIL BURNER06/24/1993
1 project · most recent 01/27/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/27/2022Permit IssuedMEGA MECHANICAL INCVentilation Systems
Ventilation
Pen Vent FX18B 5,000 CFM · Kitchen Exhaust ×1
1 project · most recent 01/07/2021
FiledStatusContractorScope
01/07/2021Permit IssuedE.M.P. FIRE SPRINKLER LLC—
1 project · most recent 11/25/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/25/2024Permit IssuedA & M WARSHAW PLBG & HTGGas, Storm, Water/Sanitary
11 projects · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Permit IssuedQUEUE ELEC'L CONTRS, INCGeneral Wiring
09/01/2026Permit IssuedQUEUE ELEC'L CONTRS, INCGeneral Wiring
08/10/2026CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
12/29/2022CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
12/28/2022CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
11/14/2022CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
11/11/2022CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
07/22/2021Permit IssuedVALENTIS ELECTRIC, INC.General Wiring
05/12/2021CompleteV. VASS ELECTRIC CORP—
04/18/2020CompleteJAM ELECTRICAL CORP—
05/15/2018Permit IssuedMETRO ELEC'L CONTRS, INCGeneral Wiring
2 projects · most recent 03/09/2023
Sidewalk Shed Fence Scaffold
FiledStatusContractorScope
03/09/2023Permit IssuedCONSOLIDATED SCAFFOLDINGFence, Scaffold, Sidewalk Shed
05/19/2021——Sidewalk Shed
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
07/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/10/2024Fail-Final General Construction Non-Directive 14FailView ↗
12/13/2023Pass-Final Boiler Equipment InspectionPassView ↗
11/17/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/16/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/11/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/11/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/12/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
05/20/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
05/20/2025HVAC-R and service water piping design and insulationJohn Beckerenergy_progress
05/20/2025HVAC-R and service water heating system controlsJohn Beckerenergy_progress
05/20/2025HVAC-R and service water heating equipmentJohn Beckerenergy_progress
05/20/2025FinalRyan Hansenprogress
05/20/2025Energy Code Compliance InspectionsRyan Hansenprogress
05/20/2025Mechanical SystemsRyan Hansenspecial
05/20/2025Heating SystemsRyan Hansenspecial
12/04/2024HVAC insulation and sealing Ryan Hansenenergy_progress
12/04/2024Maintenance informationRyan Hansenenergy_progress
12/04/2024HVAC and service water heating system controls Ryan Hansenenergy_progress
12/04/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
12/04/2024Energy Code Compliance InspectionsJohn Beckerprogress
12/04/2024HVAC and service water heating equipment Ryan Hansenenergy_progress
12/04/2024Electrical motorsRyan Hansenenergy_progress
11/06/2024Fire-Resistant Penetrations and JointsJohn Beckerspecial
11/06/2024Energy Code Compliance InspectionsJohn Beckerprogress
11/06/2024HVAC and service water heating equipment John Beckerenergy_progress
11/06/2024HVAC and service water heating system controls John Beckerenergy_progress
11/06/2024Electrical motorsJohn Beckerenergy_progress
11/06/2024Maintenance informationJohn Beckerenergy_progress
11/06/2024HVAC insulation and sealing John Beckerenergy_progress
12/23/2022Heating SystemsRyan Hansenspecial
12/23/2022HVAC and service water heating system controls Ryan Hansenenergy_progress
12/23/2022HVAC and service water heating equipment Ryan Hansenenergy_progress
Latest 25 of 30.
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch9
08/25/2026X00517776-I1Request digital key ↗
08/24/2026X00629242-I1Request digital key ↗
08/23/2026X00517832-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/26/2026X00246072-I1Request digital key ↗
08/20/2026X00431998-P2Request digital key ↗
08/20/2026X00431998-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/23/2026X00432014-I1Request digital key ↗
08/15/2026X00432014-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/19/2026X00469272-I1Request digital key ↗
08/15/2026X00469272-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026X00439220-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/15/2026X00439220-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION17
07/01/2025210180935Open ↗
01/31/2024210180935Open ↗
05/17/2021210180935Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION9
06/13/2023210180935Open ↗
06/16/2022210180935Open ↗
05/12/2021210180935Open ↗
Showing 3 of 9 on file for this type
▸BISLL104/19 REQUEST FOR EXECEPTION TO PERMIT RESTRICTION1
04/29/2021210180935Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/20/2025210180935Open ↗
▸Seals & Professional Certifications40
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/25/2026X00517776-I1Open ↗
08/24/2026X00629242-I1Open ↗
08/23/2026X00432014-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026X00432014-I1Open ↗
09/02/2026X00431998-P2Open ↗
09/02/2026X00431998-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
02/05/2019220687905Open ↗
02/05/2019220687905Open ↗
07/10/2015220466298Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026X00432014-I1Open ↗
09/02/2026X00431998-P2Open ↗
09/01/2026X00431998-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/05/2019220687905Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/05/2019220687905Open ↗
▸Trade Schedules & Equipment4
▸BISFA - FDNY APPROVAL : FD-FAA2
10/30/2017220414040Open ↗
07/19/2016220466298Open ↗
▸BISSCHEDULE B - PLUMBING1
10/18/2007210019031Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/05/2019220687905Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes3
09/28/2020210180935Open ↗
02/06/2019220687905Open ↗
07/19/2016220466298Open ↗
▸BISSTREET TREE CHECKLIST2
04/22/2021210180935Open ↗
09/28/2020210180935Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026X00439220-I1Open ↗
08/13/2026X00246072-I1Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/24/2026X00629242-I1Open ↗
08/23/2026X00432014-I1Open ↗
08/19/2026X00469272-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
09/28/2020210180935Open ↗
02/05/2019220687905Open ↗
05/20/2016220466298Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU0368BK211
11/18/2025210180935Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/18/2007210019031Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/06/2019220687905Open ↗
02/05/2019220687905Open ↗
07/10/2015220466298Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/08/2021220466298Open ↗
03/17/2021210180935Open ↗
09/28/2020210180935Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/18/2025210180935Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/08/2021220466298Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00469272-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00432014-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/08/2021220466298Open ↗
03/29/2021210180935Open ↗
02/08/2021220466298Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/19/2026X00469272-I1Open ↗
08/13/2026X00439220-I1Open ↗
08/13/2026X00432014-P1Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
01/31/2024210180935Open ↗
06/12/2020210180935Open ↗
05/13/2020210180935Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/29/2021210180935Open ↗
09/28/2020210180935Open ↗
08/28/2020210180935Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/18/2007210019031Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/11/2021220466298Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT7
04/08/2021220466298Open ↗
03/03/2021220466298Open ↗
10/07/2020210180935Open ↗
Showing 3 of 7 on file for this type
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT1
02/20/2009210019031Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/24/2025210180935Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
06/07/2023210180935Open ↗
05/26/2021210180935Open ↗
03/02/2021220466298Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
02/05/2019220687905Open ↗
07/10/2015220466298Open ↗
11/20/2014220414040Open ↗
▸Other Documents23
▸DOB NOWDHCR Document18
08/19/2026X00469272-I1Open ↗
08/19/2026X00469272-I1Open ↗
08/13/2026X00517776-I1Open ↗
Showing 3 of 18 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/12/2021210180935Open ↗
04/29/2021210180935Open ↗
▸BISSupporting Document: Fee Deferment2
09/28/2020210180935Open ↗
08/28/2020210180935Open ↗
▸BISSupporting Document: Fee Exempt1
06/07/2023210180935Open ↗