← Back
Three families
9461 RIDGE BOULEVARD
BROOKLYN · BIN 3155525
💬 Discuss this project
1950Year Built
2Stories
C0Building Class
R4-1Zoning
3,638 sfGross Floor Area
3Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 9461 RIDGE BLVD LLC · 2,500 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
9461 RIDGE BLVD LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/26/2022$1.7M—Private party → Private party$467/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC704/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTRUCTIONGeneral Contractor303/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376704/06/2023
Building Lifecycle
All (62)Filed (7)Permit Issued (3)Signed Off (3)Violation (12)Inspection (7)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
05/19/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST FLOOR, 2ND FLOOR. PLUMBING WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768206-I1
05/19/2023
Signed off — Alteration
B00760121-I1
05/19/2023
Signed off — Alteration
PROPOSED TO INSTALL NEW (3) GAS BOILER AT CELLAR. BOILER WORK IN CONJUNCTION WITH DOB NOW JOB #: B00760121. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B08031052-I1
04/17/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
04/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
04/14/2023
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
04/14/2023
Special inspection requirement — Maintenance information
Jian Yang
04/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
04/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
04/14/2023
Special inspection requirement — Interior lighting power
Jian Yang
04/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
04/10/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/07/2023
Special inspection requirement — Maintenance information
Jian Yang
04/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
04/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
04/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
04/07/2023
Special inspection requirement — Heating Systems
Jian Yang
04/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
04/06/2023
Filed — Alteration
PROPOSED TO INSTALL NEW (3) GAS BOILER AT CELLAR. BOILER WORK IN CONJUNCTION WITH DOB NOW JOB #: B00760121. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B08031052-P1
04/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
04/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
04/06/2023
Special inspection requirement — Heating Systems
Jian Yang
04/06/2023
Special inspection requirement — Maintenance information
Jian Yang
04/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
04/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
04/05/2023
Filed — Alteration
B00760121-P2
04/05/2023
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
04/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
04/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
04/05/2023
Special inspection requirement — Maintenance information
Jian Yang
04/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
04/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
04/05/2023
Special inspection requirement — Interior lighting power
Jian Yang
04/05/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jian Yang
03/29/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/24/2023
Violation issued (HPD, open)
A
03/01/2023
Filed — Alteration
B00760121-P1
11/10/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/07/2022
Violation issued (HPD, open)
I
11/03/2022
Permit issued — Boiler Equipment
B08031052-I1-BE
11/01/2022
Filed — Alteration
PROPOSED TO INSTALL NEW (3) GAS BOILER AT CELLAR. BOILER WORK IN CONJUNCTION WITH DOB NOW JOB #: B00760121. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B08031052-I1
11/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
11/01/2022
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
10/31/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST FLOOR, 2ND FLOOR. PLUMBING WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768206-P1
09/07/2022
Permit issued — Plumbing
B00768206-I1-PL
08/24/2022
Permit issued — General Construction
B00760121-I1-GC
08/22/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CELLAR, 1ST FLOOR, 2ND FLOOR. PLUMBING WORK AS PER PLAN.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00768206-I1
06/17/2022
Filed — Alteration
B00760121-I1
03/01/2022
Violation issued (HPD, open)
A
03/01/2022
Violation issued (HPD, open)
I
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.11/03/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/07/2022
DOB NOWGeneral ConstructionSigned-offMEGA GENERAL CONSTRUCTION08/24/2022
BISPLISSUEDNASTASI PLBG & HTG INC10/17/1997
1 project · most recent 09/16/2022
General Wiring
FiledStatusContractorScope
09/16/2022CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/17/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/10/2023Pass-Final Boiler Equipment InspectionPassView ↗
04/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/29/2023Fail-Final General Construction Non-Directive 14FailView ↗
11/10/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
04/14/2023Fire-Resistant Penetrations and JointsJian Yangspecial
04/14/2023Fire-Resistance Rated ConstructionJian Yangprogress
04/14/2023Energy Code Compliance InspectionsJian Yangprogress
04/14/2023Maintenance informationJian Yangenergy_progress
04/14/2023HVAC-R and service water heating equipmentJian Yangenergy_progress
04/14/2023HVAC-R and service water heating system controlsJian Yangenergy_progress
04/14/2023Interior lighting powerJian Yangenergy_progress
04/14/2023HVAC-R and service water piping design and insulationJian Yangenergy_progress
04/07/2023Maintenance informationJian Yangenergy_progress
04/07/2023HVAC-R and service water piping design and insulationJian Yangenergy_progress
04/07/2023HVAC-R and service water heating system controlsJian Yangenergy_progress
04/07/2023HVAC-R and service water heating equipmentJian Yangenergy_progress
04/07/2023Heating SystemsJian Yangspecial
04/07/2023Fire-Resistant Penetrations and JointsJian Yangspecial
04/06/2023HVAC-R and service water heating system controlsJian Yangenergy_progress
04/06/2023Fire-Resistant Penetrations and JointsJian Yangspecial
04/06/2023Heating SystemsJian Yangspecial
04/06/2023Maintenance informationJian Yangenergy_progress
04/06/2023HVAC-R and service water piping design and insulationJian Yangenergy_progress
04/06/2023HVAC-R and service water heating equipmentJian Yangenergy_progress
04/05/2023Energy Code Compliance InspectionsJian Yangprogress
04/05/2023Fire-Resistant Penetrations and JointsJian Yangspecial
04/05/2023HVAC-R and service water heating system controlsJian Yangenergy_progress
04/05/2023Maintenance informationJian Yangenergy_progress
04/05/2023HVAC-R and service water piping design and insulationJian Yangenergy_progress
Latest 25 of 48.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B00768206-I1Request digital key ↗
08/28/2026B00768206-P1Request digital key ↗
08/27/2026B00760121-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026B00768206-I1Open ↗
08/31/2026B00768206-I1Open ↗
08/29/2026B08031052-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B00768206-P1Open ↗
08/28/2026B00768206-I1Open ↗
08/27/2026B00760121-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026B00768206-I1Open ↗
08/29/2026B08031052-I1Open ↗
08/27/2026B00760121-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00768206-P1Open ↗
08/28/2026B00768206-I1Open ↗
08/27/2026B00760121-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00760121-I1Open ↗
08/13/2026B00768206-I1Open ↗