Issued Permit Scope
Mechanical Systems
Install Pantry Plumbing Fixtures, Appliances, Elec. Water Heater, Mother's Rm Sink, Drinking Fountain, ADA Restroom & Assoc Piping, Replace Men's & Women's Restroom Plumbing Fixtures & Piping Back to Risers, Install Sprinkler System & Remove TCSP on 32 Fl
On file for this project
20 documents
Install Plumbing Fixtures & Piping on 29th & 30th Floors, Remove Plumbing Fixtures & Piping on 29th & 30th Floors, Modification of Existing Sprinkler System on 29th Floor, Install Sprinkler System on 30th Floor and Remove Existing Sprinkler Heads & Piping
On file for this project
17 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
3 documents · 3 drawing sheets
Bulkhead2p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 2 drawing sheets
Floor 32Under Construction13p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Install Pantry Plumbing Fixtures, Appliances, Elec. Water Heater, Mother's Rm Sink, Drinking Fountain, ADA Restroom & Assoc Piping, Replace Men's & Women's Restroom Plumbing Fixtures & Piping Back to Risers, Install Sprinkler System & Remove TCSP on 32 Fl
On file for this project
20 documents
Demolition of Existing Pantry Sink, Dishwasher, Non-Gas Water Heater, Associated Piping, Water Line For Appliances & Sprinkler System and Install TCSP on 32nd Floor
On file for this project
4 documents · 2 drawing sheets
Demolition of Existing Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes and Paint Existing Core Walls & Ceiling Slab on 32nd Floor. No Change to Occupancy, Use or Egress is Proposed
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 31
Floor 3044p · 5 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Install Plumbing Fixtures & Piping on 29th & 30th Floors, Remove Plumbing Fixtures & Piping on 29th & 30th Floors, Modification of Existing Sprinkler System on 29th Floor, Install Sprinkler System on 30th Floor and Remove Existing Sprinkler Heads & Piping
On file for this project
17 documents · 3 drawing sheets
Minor Demolition of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes, Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes & Renovate Existing Pantry on 29th Fl.,Men's & Women's Toilet Rms. on 30th Fl.
On file for this project
10 documents · 6 drawing sheets
Various Air Conditioning Ductwork Changes on Part of 29th Floor, Demolition of Some Existing Ductwork, Installation of Air Conditioning Units, Associated Piping, Ductwork and Exhaust Fans on Part of the 30th Floor
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 2937p · 3 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Install Plumbing Fixtures & Piping on 29th & 30th Floors, Remove Plumbing Fixtures & Piping on 29th & 30th Floors, Modification of Existing Sprinkler System on 29th Floor, Install Sprinkler System on 30th Floor and Remove Existing Sprinkler Heads & Piping
On file for this project
17 documents · 3 drawing sheets
Minor Demolition of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes, Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes & Renovate Existing Pantry on 29th Fl.,Men's & Women's Toilet Rms. on 30th Fl.
On file for this project
10 documents · 3 drawing sheets
Various Air Conditioning Ductwork Changes on Part of 29th Floor, Demolition of Some Existing Ductwork, Installation of Air Conditioning Units, Associated Piping, Ductwork and Exhaust Fans on Part of the 30th Floor
On file for this project
6 documents · 3 drawing sheets
Floor 28
Floor 271p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 261p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 2513p · 3 filings · 16 docs
ArchitectureElectricalFire ProtectionGeneralPlumbingStructural
Issued Permit Scope
General Construction
Installation of Plumbing Fixtures, Non-Gas Water Heater, Associated Piping, Water Line to New Refrigerator, Remove Existing Abandoned Piping and Replacement of Existing Sprinkler System on Part of 25th Floor
On file for this project
8 documents · 2 drawing sheets
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on Part of 25th Floor. No Change to Occupancy, Use or Egress is Proposed
On file for this project
3 documents · 7 drawing sheets
Floor 24Under Construction10p · 1 filing · 14 docs
Architecture
Issued Permit Scope
General Construction
Replace Pantry, Plumbing Fixtures & Sump Pump and Associated Piping, Install Funnel Drain, Electric Instantaneous Water Heater & Associated Piping and Modifications to the Existing Sprinkler System on Part of the 24th Floor
On file for this project
14 documents
Floor 23Under Construction14p · 1 filing · 15 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Replace Existing Men's & Women's Restroom Fixtures & Roughing, Pantry Plumbing Fixtures, Associated Piping, Water Line For Appliances, Install Non-Gas Water Heater, Funnel Drain & Associated Piping and Modify Existing Sprinkler System on Part of 23rd Fl.
On file for this project
15 documents
Floor 22
Floor 21
Floor 20
Floor 19
Floor 181p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 17
Floor 163p · 3 filings · 17 docs
ElectricalFire ProtectionMechanical
Modify Existing Sprinkler System Within Vacant Space on Part of 16th Floor to Change From Concealed Sprinkler Heads to Upright Sprinkler Heads
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF AIR CONDITIONING UNITS ON THE 16TH FLOOR AND ASSOCIATED DUCTWORK. NO CHANGE IN USE EGRESS AND OCCUPANCY.
On file for this project
9 documents · 2 drawing sheets
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 15Under Construction22p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Replace Pantry Plumbing Fixtures, Non-Gas Water Heater, Associated Piping & Water Line For Appliances, Install Funnel Drain, Drinking Fountains, Water Closet, Lavatory & Associated Piping on 15th Floor & Modify Existing Sprinkler System on 14 & 15 Floors
On file for this project
15 documents · 9 drawing sheets
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 14Under Construction22p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Replace Pantry Plumbing Fixtures, Non-Gas Water Heater, Associated Piping & Water Line For Appliances, Install Funnel Drain, Drinking Fountains, Water Closet, Lavatory & Associated Piping on 15th Floor & Modify Existing Sprinkler System on 14 & 15 Floors
On file for this project
15 documents · 9 drawing sheets
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 131p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 121p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 111p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 101p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 91p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 81p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 71p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 61p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 51p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 41p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 31p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 21p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Floor 11p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet
Cellar1p · 1 filing · 5 docs
Fire Protection
Modifications/Additions to Existing Sprinkler System Throughout Building and Within Bulkhead on Roof in Compliance with Local Law 26/04
On file for this project
5 documents · 1 drawing sheet