Primarily 5-6 family with 1 store or office
956 MADISON AVENUE
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1041692
💬 Discuss this project
1878Year Built
5Stories
S5Building Class
C5-1Zoning
8,690 sfGross Floor Area
7Units
Rent Stabilized0 Open Violations
Primarily 5-6 family with 1 store or office · Owner of record: 925 MADISON AVE INC · 2,375 sf lot · 3.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 235p · 3 filings · 12 docs
Floor 131p · 3 filings · 12 docs
Cellar34p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI HILL MANAGEMENT1207/08/2026
RELIABLE ENTERPRISES1007/08/2026
LEE ASSOCIATES MGT503/22/2026
925 MADISON AVENUE2303/22/2026
CEPRINE CONSTRUCTION INC103/21/2026
PYML ASSOCIATES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A E C CONSULTING EXPEDITING803/21/2026
SNR EXPEDITING DESIGN403/21/2026
DANICO SERVICES203/21/2026
NEW YORK SIGN CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
CAPITAL IMPROVEMENT SERVICESGeneral Contractor307/08/2026
HARVEY ISAACMANElectrical203/21/2026
ANTHONY DI RUSSOElectrical203/21/2026
PARISI, DINOElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
SERGIO GIANNACHIElectrical103/21/2026
VAN VASSELLElectrical103/21/2026
DISPLAYS & BEYOND INCGeneral Contractor107/08/2026
REAL DEPENDABL CONTR CORPGeneral Contractor104/09/2026
MAUCERI SIGNScaffold107/08/2026
LELIS, ARILSONElectrical103/21/2026
NEU, RICHARDElectrical103/21/2026
NYC TRANSITElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616203/16/2026
GUTH DECONZO CONSULTING E1210101/27/2025
MJ ENGINEERING & DESIGN5546112/19/2024
Building Lifecycle
All (35)Filed (9)Permit Issued (10)Signed Off (2)Violation (11)Special Inspection (3)
06/23/2026
Signed off — Alteration
FACADE REPAIR WHICH INCLUDES THE REHAB OF EXISTING S. EXTERIOR WALLS, RE-POINT & REPLACE DETERIORATED BRICKS & MORTAR JOINTS, APPLY NEW STUCCO, REHAB EXISTING ROOF PARAPET WALL, COPING STONE & WATERPROOF MEMBRANE ON LOWER AND ROOF LEVEL AS PER PLA
M01175693-I1
05/01/2026
Permit issued — Sidewalk Shed
M01229886-I1-SH
04/30/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2026
Permit issued — Supported Scaffold
M01229890-I1-SF
03/16/2026
Filed — Alteration
FACADE REPAIR WHICH INCLUDES THE REHAB OF EXISTING S. EXTERIOR WALLS, RE-POINT & REPLACE DETERIORATED BRICKS & MORTAR JOINTS, APPLY NEW STUCCO, REHAB EXISTING ROOF PARAPET WALL, COPING STONE & WATERPROOF MEMBRANE ON LOWER AND ROOF LEVEL AS PER PLA
M01175693-P1
11/13/2025
Permit issued — General Construction
M01175693-I1-GC
10/27/2025
Filed — Alteration
FACADE REPAIR WHICH INCLUDES THE REHAB OF EXISTING S. EXTERIOR WALLS, RE-POINT & REPLACE DETERIORATED BRICKS & MORTAR JOINTS, APPLY NEW STUCCO, REHAB EXISTING ROOF PARAPET WALL, COPING STONE & WATERPROOF MEMBRANE ON LOWER AND ROOF LEVEL AS PER PLA
M01175693-I1
05/22/2025
Permit issued — Supported Scaffold
M01229890-I1-SF
05/22/2025
Permit issued — Sidewalk Shed
M01229886-I1-SH
05/21/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01229890-I1
05/21/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01229886-I1
03/27/2025
Permit issued — General Construction
M01134215-I1-GC
02/28/2025
Permit issued — Mechanical Systems
M01132978-I1-MS
01/30/2025
Permit issued — General Construction
M01138513-I1-GC
01/27/2025
Filed — Alteration
M01132978-I1
01/21/2025
Special inspection requirement — Post-installed Anchors
Magdy Youssef
12/19/2024
Filed — Alteration
Interior renovation no change in use, egress, or occupancy on this application.
M01138513-I1
12/19/2024
Filed — Alteration
M01134215-I1
11/26/2024
Permit issued — General Construction
M01129355-I1-GC
11/06/2024
Filed — Alteration
M01129355-I1
10/29/2024
Special inspection requirement — Final
PAUL BENNETT
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
08/13/2019
Signed off — Alteration
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00175557-I1
06/18/2019
Permit issued — Sign
M00175557-I1-SG
06/17/2019
Filed — Alteration
ERECT A NON-ILLUMINATED BUSINESS ACCESSORY WALL SIGN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00175557-I1
06/03/2019
Special inspection requirement — Final
SOL NIEGO
05/29/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC05/01/2026
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC04/22/2026
DOB NOWGeneral ConstructionSigned-offREAL DEPENDABL CONTR CORP11/13/2025
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC05/22/2025
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC05/22/2025
DOB NOWGeneral ConstructionPermit IssuedDISPLAYS & BEYOND INC03/27/2025
DOB NOWMechanical SystemsPermit IssuedCAPITAL IMPROVEMENT SERVI02/28/2025
DOB NOWGeneral ConstructionPermit IssuedCAPITAL IMPROVEMENT SERVI01/30/2025
DOB NOWGeneral ConstructionPermit IssuedCAPITAL IMPROVEMENT SERVI11/26/2024
DOB NOWSignSigned-offMAUCERI SIGN CO., INC06/18/2019
BISSPISSUEDPLUMBING & HTG DOCTOR INC04/05/2017
BISSPISSUEDAMM GEN'L CONTRACTING.INC02/21/2017
BISMHISSUEDRODELU INTERIOR CONTRACTI10/25/2016
BISPLISSUEDMARCO POLO PLBG & HTG INC10/13/2016
BISOTISSUEDRODELU INTERIOR CONTRACTI09/21/2016
BIS—ISSUEDRODELU INTERIOR CONTRACTI09/19/2016
BISPLISSUEDMARCO POLO PLBG & HTG INC12/09/2015
BISOTISSUEDLOUMAR CONTRACTING CORP11/18/2015
BISOTISSUEDCERINA GENERAL CONTR INC12/09/2014
BIS—ISSUEDL.S. SIGN CO., INC09/08/2014
BISEQISSUEDCEPRINE CONSTRUCTION INC09/04/2014
BISEQISSUEDCEPRINE CONSTRUCTION INC09/04/2014
BISOTISSUEDMICHILLI INC08/27/2014
BISMHISSUEDMICHILLI INC08/13/2014
BISEQISSUEDCSC OF N Y05/14/2008
BISEQISSUEDSPRING SCAFFOLDING06/04/2002
BISOTISSUEDALMA CONTRACTING CORP.10/28/1999
BISPLISSUEDPLBG P & H INC06/18/1999
BISOTISSUEDALMA CONTRACTING CORP06/03/1999
BISMHISSUEDALMA CONTRACTING CORP06/03/1999
BISEQISSUEDALMA CONTRACTING CORP06/03/1999
BISOTISSUEDALMA CONTRACTING CORP06/03/1999
BISOTISSUEDACME AWNING CO INC04/27/1995
BISMHISSUEDRICHARDS VIKSE ARCHT/PROPTSE.06/12/1992
BISOTISSUEDRICHARDS VIKSE ARCHT/PROPTSE.06/10/1992
5 projects · most recent 10/06/2025
General Wiring
FiledStatusContractorScope
10/06/2025CompleteT. DIRUSSO ELEC'L CONT IN7 meters, 4 new_meters
05/22/2025Permit IssuedRICHARD NEU—
12/15/2024Permit IssuedOPTIMAL ELECTRIC, INCGeneral Wiring
04/04/2021Permit IssuedPAUL VERARDI7 meters, 6 new_meters
08/29/2019CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
2 projects · most recent 05/21/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/21/2025Permit IssuedRELIABLE ENTERPRISES INCScaffold
05/21/2025Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
1 project · most recent 03/16/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
03/16/2026Signed-offREAL DEPENDABL CONTR CORPTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/21/2025Post-installed AnchorsMagdy Youssefspecial
10/29/2024FinalPAUL BENNETTprogress
06/03/2019FinalSOL NIEGOprogress
▾Documents — 255 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/25/2026M01129355-I1Request digital key ↗
08/25/2026M01134215-I1Request digital key ↗
08/25/2026M01138513-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00175557-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION20
04/11/2017122868432Open ↗
04/04/2017122868432Open ↗
10/18/2016122888456Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION13
04/14/2017122867969Open ↗
03/02/2017122867969Open ↗
10/04/2016122888456Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWLPC Approval/Permit6
08/18/2026M01175693-I1Open ↗
08/13/2026M01129355-I1Open ↗
08/13/2026M01132978-I1Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/05/2017122876833Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
03/06/2017122876833Open ↗
▸Seals & Professional Certifications67
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
02/04/2019140247089Open ↗
02/04/2019140247089Open ↗
02/04/2019140247061Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026M01138513-I1Open ↗
08/25/2026M01132978-I1Open ↗
08/18/2026M01175693-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
04/11/2017122868432Open ↗
04/04/2017122868432Open ↗
09/26/2016122888456Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
09/26/2016122888456Open ↗
09/15/2016122888456Open ↗
08/26/2016122867969Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/29/2014140247089Open ↗
08/29/2014140247061Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/29/2014140247089Open ↗
08/29/2014140247061Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/14/2026M01134215-I1Open ↗
08/23/2026M00175557-I1Open ↗
▸BISProfessional and Owner Certification (POC3)1
09/08/2016122876833Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/14/2026M01134215-I1Open ↗
▸Trade Schedules & Equipment7
▸BISEQUIPMENT USE PERMITS3
07/06/2016122064988Open ↗
07/06/2016122064988Open ↗
07/06/2016122064988Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
04/13/2017122868432Open ↗
04/11/2017122868432Open ↗
07/06/2016122064988Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/15/2015122606108Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
09/26/2016122888456Open ↗
09/08/2016122876833Open ↗
08/30/2016122867969Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
09/08/2016122876833Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
09/26/2016122888456Open ↗
08/26/2016122867969Open ↗
08/25/2016122868432Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026M01138513-I1Open ↗
08/25/2026M01132978-I1Open ↗
08/13/2026M01129355-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
12/15/2014122125262Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
12/15/2015122606108Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01175693-I1Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
09/26/2016122888456Open ↗
09/08/2016122876833Open ↗
07/06/2016122064988Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/19/2017122888456Open ↗
07/06/2016122064988Open ↗
04/13/2016122059306Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
07/11/2014122059306Open ↗
07/11/2014122059315Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/29/2014140247061Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/29/2014140247089Open ↗
08/29/2014140247061Open ↗
08/29/2014140247061Open ↗
▸Approvals, Objections & Sign-offs39
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
12/10/2020122876833Open ↗
09/14/2020122876833Open ↗
12/13/2019122876833Open ↗
Showing 3 of 21 on file for this type
▸BISLANDMARKS APPROVAL11
05/09/2017122868432Open ↗
10/18/2016122868432Open ↗
09/28/2016122888456Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/04/2019140247089Open ↗
02/04/2019140247061Open ↗
09/11/2014122059315Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
09/08/2016122876833Open ↗
▸BISSUPERSEDING LETTER1
04/14/2017122867969Open ↗
▸Cost, Insurance & Ownership18
▸BISCOST AFFIDAVIT18
06/09/2021122876833Open ↗
07/24/2017122867969Open ↗
05/09/2017122868432Open ↗
Showing 3 of 18 on file for this type
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET12
09/26/2016122888456Open ↗
09/15/2016122888456Open ↗
09/08/2016122876833Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM9
12/13/2019122876833Open ↗
12/13/2019122876833Open ↗
09/12/2019122876833Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION7
04/11/2017122868432Open ↗
04/04/2017122868432Open ↗
03/07/2017122876833Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/29/2014140247089Open ↗
08/29/2014140247061Open ↗
▸Other Documents4
▸BISSupporting Document: Fee Deferment3
10/18/2016122868432Open ↗
10/18/2016122868432Open ↗
07/06/2016122064988Open ↗
▸BISPLOT DIAGRAM1
09/08/2016122876833Open ↗