← Back
Elevator apt, semi-fireproof without stores
959 ANDERSON AVENUE
BRONX · BIN 2129679
💬 Discuss this project
2022Year Built
7Stories
D1Building Class
R7-1Zoning
18,781 sfGross Floor Area
25Units
Rent Stabilized15 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: LIVI ARIEL LLC · 5,000 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof3p · 2 filings · 20 docs
Bulkhead2p · 2 filings · 18 docs
Floor 74p · 3 filings · 20 docs
Floor 64p · 2 filings · 18 docs
Floor 54p · 2 filings · 18 docs
Floor 43p · 2 filings · 18 docs
Floor 32p · 1 filing · 16 docs
Floor 24p · 2 filings · 18 docs
Floor 12p · 2 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MNK ENTERPRISES807/08/2026
RE-BRICK CONSTRUCTION503/22/2026
LIVI ARIEL LLC303/22/2026
ALL BOROUGH GROUP SVC903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/12/2021$1000K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGN203/21/2026
KNA CONSULTING2003/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL BOROUGH GROUP SVC INCGeneral Contractor1007/08/2026
MNK ENTERPRISES LLCGeneral Contractor407/08/2026
RE-BRICK CONSTRUCTION INCGeneral Contractor303/21/2026
INFINITY MANAGEMENT NY LLGeneral Contractor203/21/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor203/21/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616710/10/2023
ENTHINK ENGINEERS LLC6247102/09/2023
Building Lifecycle
All (103)Filed (16)Permit Issued (13)Signed Off (12)Violation (10)Inspection (7)Objection (24)Special Inspection (21)
04/08/2026
Violation issued (ECB, closed)
Elevators
12/20/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00738304-I1
10/31/2023
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH NB 240297558
X00701297-S2
10/27/2023
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH NB 240297558
X00701297-S1
10/27/2023
Permit issued — Mechanical Systems
X00701297-S2-MS
10/13/2023
Objection resolved — Addressed
10/11/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
10/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
10/10/2023
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH NB 240297558
X00701297-P1
09/28/2023
Signed off — Alteration
FILED HEREWITH FOR SPRINKLER WORK IN CONUNCTION WITH NB 240297558
X00866374-I1
09/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/27/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
09/22/2023
Objection resolved — Addressed
09/22/2023
Objection resolved — Addressed
09/22/2023
Objection resolved — Addressed
09/22/2023
Objection resolved — Addressed
09/22/2023
Objection resolved — Addressed
09/13/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
08/31/2023
Filed — Alteration
FILED HEREWITH FOR SPRINKLER WORK IN CONUNCTION WITH NB 240297558
X00866374-P1
08/23/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/01/2023
Signed off — Alteration
X00673350-I1
07/31/2023
Objection resolved — Addressed
07/26/2023
Signed off — Alteration
FILED HEREWITH TO INSTALL 12' CURB CUT IN CONJUNCTION WITH NB 240297558
X00889284-I1
07/25/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/01/2023
Permit issued — Curb Cut
X00889284-I1-CC
06/30/2023
Permit issued — Sprinklers
X00866374-I1-EW-SP
06/15/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
X00825627-I1
06/14/2023
Filed — Alteration
FILED HEREWITH TO INSTALL 12' CURB CUT IN CONJUNCTION WITH NB 240297558
X00889284-I1
06/07/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X08043852-I1
06/02/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/19/2023
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH NB 240297558
X00701297-I1
05/15/2023
Violation issued (ECB, closed)
Construction
05/12/2023
Objection raised — Energy
05/12/2023
Objection raised — Admin
05/12/2023
Objection raised — Scope
05/12/2023
Objection raised — Scope
05/12/2023
Objection raised — Scope
05/12/2023
Objection raised — Fire_Protection
05/12/2023
Objection raised — Inspections
05/11/2023
Objection raised — Mechanical
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection raised — Mechanical
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection raised — Inspections
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection raised — Admin
05/11/2023
Objection resolved — Addressed
05/11/2023
Objection raised — Admin
05/11/2023
Objection resolved — Addressed
05/09/2023
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH NB 240297558
X00701297-S2
05/04/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/04/2023
Special inspection requirement — Final
FAHAD FATEH
05/02/2023
Filed — Alteration
FILED HEREWITH FOR SPRINKLER WORK IN CONUNCTION WITH NB 240297558
X00866374-I1
04/19/2023
Violation issued (ECB, closed)
Unknown
04/18/2023
Violation issued (ECB, closed)
Unknown
04/14/2023
Signed off — Alteration
X00701274-I1
04/04/2023
Signed off — Alteration
X00748343-I1
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offINFINITY MANAGEMENT NY LL10/27/2023
DOB NOWCurb CutSigned-offALL BOROUGH GROUP SVC INC07/01/2023
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC06/30/2023
DOB NOWConstruction FenceSigned-offALL BOROUGH GROUP SVC INC02/21/2023
DOB NOWProtection and Mechanical MethodsSigned-offMNK ENTERPRISES LLC02/09/2023
DOB NOWPlumbingSigned-offAQUEDUCT MECHANICAL CORP12/07/2022
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC11/23/2022
DOB NOWStructuralSigned-offALL BOROUGH GROUP SVC INC10/25/2022
DOB NOWFoundationSigned-offALL BOROUGH GROUP SVC INC10/25/2022
DOB NOWFoundationSigned-offALL BOROUGH GROUP SVC INC06/07/2022
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL05/31/2022
DOB NOWSupported ScaffoldSigned-offRE-BRICK CONSTRUCTION INC05/16/2022
DOB NOWConstruction FenceSigned-offALL BOROUGH GROUP SVC INC03/22/2022
BIS—ISSUEDINFINITY MANAGEMENT NY LL09/06/2023
BIS—ISSUEDALL BOROUGH GROUP SVC INC12/20/2022
1 project · most recent 03/05/2021
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2021——Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-3C30NA2-U1 28,400 BTU · Heat Pump Outdoor ×19
MXZ-8C48NA2-U1 48,000 BTU · Vrf Outdoor ×6
MUZ-GEO9NA2 9,000 BTU · Heat Pump Outdoor ×2
MXZ-2C20NA2-U1 18,000 BTU · Heat Pump Outdoor ×1
Heating
Mitsubishi Electric MXZ-3C30NA2-U1 28,600 BTU · Heat Pump Outdoor ×19
MXZ-8C48NA2-U1 54,000 BTU · Vrf Outdoor ×6
MUZ-GEO9Na2 10,900 BTU · Heat Pump Outdoor ×2
MXZ-2C20NA2-U1 22,000 BTU · Heat Pump Outdoor ×1
5 projects · most recent 01/30/2023
General Wiring
FiledStatusContractorScope
01/30/2023CompleteTITAN ELEC'L & ELEV CONTR—
11/22/2022CompleteRICHARD NEU—
11/08/2022CompleteAV GROUP ELECTRICAL LLCGeneral Wiring
07/27/2022CompleteMARTINEZ ELECTRICAL CONT1 meters, 1 new_meters
05/31/2022CompleteHIGH QUALITY ELECTRIC OF—
1 project · most recent 01/05/2021
Fence
FiledStatusContractorScope
01/05/2021——Fence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/23/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/25/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/02/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/16/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
10/11/2023Maintenance informationFAHAD FATEHenergy_progress
10/11/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
10/11/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/27/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/27/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/27/2023Maintenance informationFAHAD FATEHenergy_progress
09/13/2023Sprinkler SystemsFAHAD FATEHspecial
05/04/2023Mechanical SystemsFAHAD FATEHspecial
05/04/2023FinalFAHAD FATEHprogress
02/08/2023Structural Stability – Alterations of existing buildingsSunil Saigalspecial
05/31/2022FinalFAHAD FATEHprogress
05/31/2022Footing and FoundationFAHAD FATEHprogress
05/31/2022FinalMOHAMMAD AHEADprogress
03/17/2022Footing and FoundationFAHAD FATEHprogress
03/17/2022Structural Steel - High Strength BoltingFAHAD FATEHspecial
03/17/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
03/17/2022FinalFAHAD FATEHprogress
03/17/2022Structural Steel - DetailsFAHAD FATEHspecial
03/17/2022Structural Cold-Formed SteelFAHAD FATEHspecial
03/17/2022MasonryFAHAD FATEHspecial
03/17/2022FinalFAHAD FATEHprogress
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch14
08/24/2026X00673350-I1Request digital key ↗
08/24/2026X00701274-I1Request digital key ↗
08/24/2026X00738304-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/25/2026X00443262-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00457654-I1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION12
04/01/2024240297558Open ↗
03/21/2024240297558Open ↗
12/01/2023240297558Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION2
09/13/2023240297558Open ↗
12/20/2022240297558Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/12/2023240297558Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
11/15/2022240297558Open ↗
07/15/2021240297558Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/04/2021240297558Open ↗
▸BISVERIFY TAX LOT1
10/27/2023240297558Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/25/2024240297558Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/31/2024240297558Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/04/2021240297558Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/25/2026X00457654-I1Open ↗
08/24/2026X00673350-I1Open ↗
08/24/2026X00701274-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026X00747962-I1Open ↗
09/20/2026X00701297-S2Open ↗
08/27/2026X00701297-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/20/2026X00701297-S2Open ↗
08/27/2026X00825627-I1Open ↗
08/27/2026X00701297-P1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/28/2020240297558Open ↗
▸Trade Schedules & Equipment6
▸BISHEATING SYSTEMS1
10/27/2023240297558Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/27/2023240297558Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/27/2023240297558Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
07/08/2021240297558Open ↗
▸BISSPRINKLER SYSTEMS1
10/27/2023240297558Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
10/27/2023240297558Open ↗
▸Safety & Tenant Protection6
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
03/18/2024240297558Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/22/2022240297558Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/20/2022240297558Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
04/19/2024240297558Open ↗
▸BISSTREET TREE CHECKLIST1
12/28/2020240297558Open ↗
▸BISSTREET TREE SIGNOFF1
10/27/2023240297558Open ↗
▸Energy Compliance12
▸BISFENESTRATION AIR LEAKAGE1
10/27/2023240297558Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/27/2023240297558Open ↗
▸BISINTERIOR LIGHTING POWER1
10/27/2023240297558Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/27/2023240297558Open ↗
▸BISFENESTRATION AREAS1
10/27/2023240297558Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
10/27/2023240297558Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/24/2021240297558Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/27/2023240297558Open ↗
▸BISLIGHTING IN DWELLING UNITS1
10/27/2023240297558Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/27/2023240297558Open ↗
▸BISLIGHTING CONTROLS1
10/27/2023240297558Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/27/2023240297558Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/24/2021240297558Open ↗
02/04/2021240297558Open ↗
02/04/2021240297558Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
02/04/2021240297558Open ↗
02/04/2021240297558Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
10/27/2023240297558Open ↗
12/20/2022240297558Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
10/27/2023240297558Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
03/19/2024240297558Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
12/20/2022240297558Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/27/2023240297558Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/27/2023240297558Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/27/2023240297558Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
10/27/2023240297558Open ↗
▸BISSOIL REPORT1
02/04/2021240297558Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/20/2024240297558Open ↗
▸BISSOIL PERC. TEST-INDIVID ON-SITE PRIVATE SEWAGE DISP.(SEPTIC)1
10/27/2023240297558Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE5
04/01/2024240297558Open ↗
03/21/2024240297558Open ↗
12/01/2023240297558Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/15/2022240297558Open ↗
▸BISSUPERSEDING LETTER1
09/13/2023240297558Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/13/2023240297558Open ↗
12/22/2022240297558Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
05/08/2023240297558Open ↗
11/15/2022240297558Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026X00866374-P1Open ↗
▸Other Documents8
▸BISSHUTOFF DAMPERS1
10/27/2023240297558Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/28/2020240297558Open ↗
▸BISLOWEST FLOOR ELEVATION1
10/27/2023240297558Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
10/27/2023240297558Open ↗
▸BISMAINTENANCE INFORMATION1
10/27/2023240297558Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
10/27/2023240297558Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
10/27/2023240297558Open ↗
▸BISPLOT DIAGRAM1
12/28/2020240297558Open ↗