← Back
BuildNYC
Miscellaneous one family
966 BAY RIDGE PARKWAY
BROOKLYN · Dyker Heights · BIN 3148953
💬 Discuss this project
1925Year Built
2Stories
A9Building Class
R4-1Zoning
1,588 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Miscellaneous one family · 2,250 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
StructuralGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Site & exteriorTemporary construction fence3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anthony Bonsignore, RA207/30/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Primo Design & ConstructionGeneral Contractor303/21/2026
Primo Design & ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Avt Engineering345107/30/2021
Building Lifecycle
02/27/2023
Signed off — Alteration
B00567057-I1
02/24/2023
Signed off — Alteration
B00567317-I1
02/24/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/20/2021
Permit issued — Foundation
B00567057-I1-GC-CX
09/29/2021
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
22 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offPrimo Design & Construction10/20/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/24/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/03/2021Fire-Resistant Penetrations and JointsJOSEPH PASATUROspecial
09/03/2021Structural Stability – Alterations of existing buildingsJOSEPH PASATUROspecial
09/03/2021MasonryJOSEPH PASATUROspecial
09/03/2021Concrete - Cast-In-PlaceJOSEPH PASATUROspecial
09/03/2021Subgrade InspectionsJOSEPH PASATUROspecial
09/03/2021Exterior Insulation and Finish Systems (EIFS)JOSEPH PASATUROspecial
09/03/2021Footing and FoundationJOSEPH PASATUROprogress
09/03/2021Energy Code Compliance InspectionsJOSEPH PASATUROprogress
09/03/2021FinalJOSEPH PASATUROprogress
09/03/2021Fenestration areasJOSEPH PASATUROenergy_progress
09/03/2021Fenestration and door U-factor and product ratingsJOSEPH PASATUROenergy_progress
09/03/2021Fenestration air leakageJOSEPH PASATUROenergy_progress
09/03/2021Insulation placement and R valuesJOSEPH PASATUROenergy_progress
36 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account