← Back
Multi-story retail building (2+)
97 NORTH 6 STREET
BROOKLYN · BIN 3062065
💬 Discuss this project
2023Year Built
2Stories
K2Building Class
M1-2/R6AZoning
5,391 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Multi-story retail building (2+) · Owner of record: 97 N. 6TH STREET OWNER LLC · 3,750 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof5p · 3 filings · 20 docs
Floor 214p · 4 filings · 20 docs
Floor 112p · 4 filings · 20 docs
Cellar10p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITY URBAN REALTY3407/08/2026
ACADIA REALTY1407/08/2026
ACADIA REALTY TRUST503/22/2026
MJM ASSOCIATES CONSTR303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/09/2025$27.5M—— → —$5,101/sf building
04/28/2022$7.8M—— → —— not available
12/23/2015$2.6M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MARY MCKEOWN703/21/2026
DVA Advisors1703/21/2026
NEW YORK SIGN CONSULTANTS403/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJM ASSOCIATES CONSTR LLCGeneral Contractor1407/08/2026
STEADFAST DEVELOPMENT ANDGeneral Contractor507/08/2026
MILESTONE MASONRY CORPGeneral Contractor303/21/2026
PAL-MAR PLBG & HTG INCPlumbing207/08/2026
MAUCERI SIGN SYSTEMSScaffold207/08/2026
SKINNER PLMNG & HTG CORPFire Protection107/08/2026
F.S. SITE CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
QUALITY TESTING, LLC7344510/02/2025
PHILIBERT ENGINEERING, PC2231311/21/2024
RV ENGINEERS, PC.5953408/09/2023
Building Lifecycle
All (189)Filed (28)Permit Issued (20)Signed Off (12)Violation (4)Inspection (15)Objection (80)Special Inspection (30)
04/29/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/04/2026
Signed off — Alteration
"Lululemon" Remove/install non load bearing partitions, flooring, ceilings, finishes, fixtures and wood blocking on storefront for signage as per plans filed herewith. Signage to be filed under separate filing.
B01211875-I1
01/15/2026
Signed off — Alteration
"Lululemon" Minor modification to existing exhaust and dampers to accommodate new layout out for new tenant. HVAC existing to remain. No change to egress, use or occupancy as per plans filed herewith.
B01214626-I1
12/15/2025
Signed off — Alteration
"Lululemon" Plumbing work associated with new tenant build out. Install pl fixtures to accommodate new layout per plans filed herewith. No change in egress, use or occupancy
B01211900-I1
12/12/2025
Signed off — Alteration
"Lululemon" Minor modification to existing sprinkler system to accommodate new layout for new tenant. No change in egress, use or occupancy.
B01214635-I1
10/14/2025
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
B01291039-I1
10/09/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/07/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/07/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10/02/2025
Filed — Alteration
"Lululemon" Minor modification to existing sprinkler system to accommodate new layout for new tenant. No change in egress, use or occupancy.
B01214635-P1
10/02/2025
Permit issued — Suspended Scaffold
B01291039-I1-SC
09/26/2025
Objection raised — Other
09/26/2025
Objection resolved — Addressed
09/24/2025
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
B01291039-I1
07/29/2025
Permit issued — Structural
B01211907-I1-ST
07/10/2025
Permit issued — Sprinklers
B01214635-I1-EW-SP
06/13/2025
Filed — Alteration
B01233855-I1
06/13/2025
Filed — Alteration
ERECT AN ILLUMINATED BUSINESS ACCESSORY BLADE SIGN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01233862-I1
06/13/2025
Permit issued — Sign
B01233862-I1-SG
06/13/2025
Permit issued — Sign
B01233855-I1-SG
05/30/2025
Special inspection requirement — Final
Israel Wertentheil
05/28/2025
Filed — Alteration
Lululemon - Minor structural work associated with awning support. No change in egress, use or occupancy
B01211907-P1
05/28/2025
Special inspection requirement — Final
KEVIN SNEDEKER
05/28/2025
Special inspection requirement — Structural Steel - Welding
KEVIN SNEDEKER
05/23/2025
Permit issued — General Construction
B01214626-I1-GC
05/23/2025
Permit issued — General Construction
B01211875-I1-GC
05/20/2025
Filed — Alteration
"Lululemon" Remove/install non load bearing partitions, flooring, ceilings, finishes, fixtures and wood blocking on storefront for signage as per plans filed herewith. Signage to be filed under separate filing.
B01211875-I1
05/20/2025
Filed — Alteration
"Lululemon" Minor modification to existing exhaust and dampers to accommodate new layout out for new tenant. HVAC existing to remain. No change to egress, use or occupancy as per plans filed herewith.
B01214626-I1
05/20/2025
Filed — Alteration
"Lululemon" Plumbing work associated with new tenant build out. Install pl fixtures to accommodate new layout per plans filed herewith. No change in egress, use or occupancy
B01211900-I1
05/20/2025
Filed — Alteration
"Lululemon" Minor modification to existing sprinkler system to accommodate new layout for new tenant. No change in egress, use or occupancy.
B01214635-I1
05/20/2025
Filed — Alteration
Lululemon - Minor structural work associated with awning support. No change in egress, use or occupancy
B01211907-I1
03/18/2025
Signed off — Alteration
B01056060-I1
12/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/21/2024
Filed — New Building
SOE work in conjunction with NB
B08017402-A3
11/20/2024
Signed off — New Building
SOE work in conjunction with NB
B08017402-S6
11/20/2024
Signed off — New Building
SOE work in conjunction with NB
B08017402-S4
10/30/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2024
Signed off — New Building
SOE work in conjunction with NB
B08017402-S3
10/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2024
Filed — New Building
SOE work in conjunction with NB
B08017402-A2
10/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacky Philibert
10/08/2024
Special inspection requirement — Sprinkler Systems
Jacky Philibert
10/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2024
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
09/19/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/11/2024
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
09/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/23/2024
Signed off — New Building
SOE work in conjunction with NB
B08017402-S2
08/23/2024
Signed off — New Building
SOE work in conjunction with NB
B08017402-S1
08/22/2024
Objection resolved — Addressed
08/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jacky Philibert
08/22/2024
Special inspection requirement — Maintenance information
Jacky Philibert
08/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Jacky Philibert
08/22/2024
Special inspection requirement — Post-installed Anchors
Jacky Philibert
08/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Jacky Philibert
08/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jacky Philibert
08/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jacky Philibert
08/20/2024
Objection resolved — Addressed
08/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Jacky Philibert
08/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Jacky Philibert
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSKYTRAC ACCESS GROUP LLC10/02/2025
DOB NOWStructuralPermit IssuedSTEADFAST DEVELOPMENT AND07/29/2025
DOB NOWSprinklersSigned-offSKINNER PLMNG & HTG CORP07/10/2025
DOB NOWSignPermit IssuedMAUCERI SIGN CO., INC06/13/2025
DOB NOWSignPermit IssuedMAUCERI SIGN CO., INC06/13/2025
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND05/23/2025
DOB NOWGeneral ConstructionSigned-offSTEADFAST DEVELOPMENT AND05/23/2025
DOB NOWSupported ScaffoldSigned-offMILESTONE MASONRY CORP05/31/2024
DOB NOWFoundationSigned-offMJM ASSOCIATES CONSTR LLC05/08/2024
DOB NOWStructuralPermit IssuedMJM ASSOCIATES CONSTR LLC04/17/2024
DOB NOWSupport of ExcavationSigned-offMJM ASSOCIATES CONSTR LLC03/18/2024
DOB NOWSprinklersSigned-offALAN J. BRUTOSKY PLBG CON03/06/2024
DOB NOWMechanical SystemsSigned-offMJM ASSOCIATES CONSTR LLC02/20/2024
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC01/18/2024
DOB NOWGeneral ConstructionPermit IssuedMJM ASSOCIATES CONSTR LLC11/20/2023
DOB NOWPlumbingSigned-offPAL-MAR PLBG & HTG INC11/02/2023
DOB NOWFoundationSigned-offMJM ASSOCIATES CONSTR LLC05/10/2023
DOB NOWStructuralPermit IssuedMJM ASSOCIATES CONSTR LLC05/10/2023
DOB NOWSupport of ExcavationSigned-offMJM ASSOCIATES CONSTR LLC04/03/2023
DOB NOWGeneral ConstructionPermit IssuedMJM ASSOCIATES CONSTR LLC04/03/2023
1 project · most recent 11/21/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/21/2024Signed-offMJM ASSOCIATES CONSTR LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ARUM072BTE5 81,000 BTU · Vrf Outdoor ×4
ARUM121BTE5 135,000 BTU · Vrf Outdoor ×2
LSU180HSV5 21,600 BTU · Condensing Unit ×2
Ventilation
N/A N/A 55,109 BTU · Erv ×3
1 project · most recent 11/21/2024
Sprinkler System
FiledStatusContractorScope
11/21/2024Signed-offF.S. SITE CORPSprinkler System
1 project · most recent 11/21/2024
Storm Water/Sanitary
FiledStatusContractorScope
11/21/2024Signed-offPAL-MAR PLBG & HTG INCStorm, Water/Sanitary
4 projects · most recent 03/02/2026
General Wiring
FiledStatusContractorScope
03/02/2026CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
07/01/2025CompleteCONDUCTOR ELECL SVCS INC—
01/07/2024CompleteDENALI ELECTRIC CORPGeneral Wiring
09/25/2023CompleteFIVE BOROUGH ELECTRIC INCGeneral Wiring
2 projects · most recent 05/28/2025
FiledStatusContractorScope
05/28/2025Permit IssuedSTEADFAST DEVELOPMENT AND2 scope_items
11/21/2024Signed-offMJM ASSOCIATES CONSTR LLC1 scope_items
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
10/09/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/07/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
12/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/30/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2024Fail-Final SP - Up to 3 Requested FloorsFailView ↗
09/19/2024Fail-Final CND-Occupancy InspectionFailView ↗
09/11/2024Fail-Final SP - Up to 3 Requested FloorsFailView ↗
09/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
05/30/2025FinalIsrael Wertentheilprogress
05/28/2025FinalKEVIN SNEDEKERprogress
05/28/2025Structural Steel - WeldingKEVIN SNEDEKERspecial
10/08/2024Fire-Resistant Penetrations and JointsJacky Philibertspecial
10/08/2024Sprinkler SystemsJacky Philibertspecial
08/22/2024Energy Code Compliance InspectionsJacky Philibertprogress
08/22/2024HVAC-R and service water heating system controlsJacky Philibertenergy_progress
08/22/2024Maintenance informationJacky Philibertenergy_progress
08/22/2024HVAC-R and service water piping design and insulationJacky Philibertenergy_progress
08/22/2024HVAC-R and service water heating equipmentJacky Philibertenergy_progress
08/22/2024Fire-Resistant Penetrations and JointsJacky Philibertspecial
08/22/2024Post-installed AnchorsJacky Philibertspecial
08/15/2024Fire-Resistant Penetrations and JointsJacky Philibertspecial
08/15/2024HVAC-R and service water piping design and insulationJacky Philibertenergy_progress
08/15/2024HVAC-R and service water heating equipmentJacky Philibertenergy_progress
08/15/2024Shutoff dampersJacky Philibertenergy_progress
08/15/2024HVAC-R and service water heating system controlsJacky Philibertenergy_progress
08/15/2024Maintenance informationJacky Philibertenergy_progress
08/15/2024FinalJacky Philibertprogress
08/15/2024Energy Code Compliance InspectionsJacky Philibertprogress
08/15/2024Mechanical SystemsJacky Philibertspecial
07/29/2024Mechanical SystemsJacky Philibertspecial
07/29/2024Fire-Resistant Penetrations and JointsJacky Philibertspecial
07/29/2024Post-installed AnchorsJacky Philibertspecial
07/29/2024Energy Code Compliance InspectionsJacky Philibertprogress
Latest 25 of 74.
▾Documents — 181 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
08/25/2026B01056060-I1Request digital key ↗
08/23/2026B08017402-A3Request digital key ↗
08/23/2026B08017402-A2Request digital key ↗
Showing 3 of 30 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/22/2023340876813Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/27/2023340876813Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/23/2026B08017402-A3Open ↗
08/15/2026B08017402-I1Open ↗
08/14/2026B08017402-P6Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/23/2026B08017402-A3Open ↗
08/15/2026B08017402-I1Open ↗
08/14/2026B08017402-P6Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B08017402-I1Open ↗
▸Seals & Professional Certifications65
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/25/2026B01056060-I1Open ↗
08/23/2026B08017402-A3Open ↗
08/23/2026B08017402-A2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026B08017402-S3Open ↗
08/31/2026B08017402-S2Open ↗
08/28/2026B08017402-S4Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026B08017402-S3Open ↗
09/01/2026B08017402-S3Open ↗
08/31/2026B08017402-S2Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/22/2023340876813Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/23/2026B08017402-A3Open ↗
08/15/2026B08017402-I1Open ↗
08/14/2026B08017402-P6Open ↗
▸Safety & Tenant Protection22
▸DOB NOWHPD-1: Anti-Harassment Area Checklist11
08/23/2026B08017402-P7Open ↗
08/23/2026B08017402-A3Open ↗
08/23/2026B08017402-P8Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWStreet Tree Checklist3
08/23/2026B08017402-A3Open ↗
08/15/2026B08017402-I1Open ↗
08/14/2026B08017402-P6Open ↗
▸BISSTREET TREE CHECKLIST2
08/09/2023340876813Open ↗
01/22/2023340876813Open ↗
▸DOB NOWCertificate of No Harassment2
08/13/2026B01214626-I1Open ↗
08/13/2026B01211875-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/27/2023340876813Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026B08017402-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026B08017402-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B08017402-I1Open ↗
▸Environmental & Asbestos26
▸DOB NOWOER: Notice to Proceed15
08/23/2026B08017402-P4Open ↗
08/23/2026B08017402-A3Open ↗
08/23/2026B08017402-P8Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
08/23/2026B08017402-P8Open ↗
08/23/2026B08017402-P7Open ↗
08/15/2026B08017402-S3Open ↗
Showing 3 of 10 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
12/27/2023340876813Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/23/2026B08017402-P4Open ↗
08/23/2026B08017402-P2Open ↗
08/23/2026B08017402-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/23/2026B08017402-S1Open ↗
08/14/2026B08017402-S5Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/22/2023340876813Open ↗
▸Other Documents18
▸DOB NOWSite Survey: Initial3
08/23/2026B08017402-A3Open ↗
08/15/2026B08017402-I1Open ↗
08/14/2026B08017402-P6Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/23/2026B08017402-A3Open ↗
08/15/2026B08017402-I1Open ↗
08/14/2026B08017402-P6Open ↗
▸DOB NOWProperty Ownership Certification3
08/23/2026B08017402-A3Open ↗
08/15/2026B08017402-I1Open ↗
08/14/2026B08017402-P6Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
08/29/2023340876813Open ↗
05/11/2023340876813Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
08/09/2023340876813Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/27/2023340876813Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
05/11/2023340876813Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01291039-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/14/2026B08017402-S5Open ↗
▸DOB NOWCalculations1
08/13/2026B01291039-I1Open ↗
▸DOB NOWFinal Survey1
08/15/2026B08017402-I1Open ↗