← Back
Church, synagogue, chapel
St. John Chrysostom's Church
978 EAST 167 STREET · BIN 2006036
💬 Discuss this project
1930Year Built
1Stories
M1Building Class
R7-1Zoning
8,646 sfGross Floor Area
0Units
0 Open Violations
Church, synagogue, chapel · 11,750 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHURCH OF ST JOHN CHRYSOSTOM907/08/2026
CHURCH OF SAINT JOHN CHRYSOSTOM103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PC STUDIO ARCHITECT, PLLC109/12/2024
ENSIGN ENGINEERING, P.C.409/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.103/21/2026
ENSIGN ENGINEERING P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JAKES SHEETROCK, INCGeneral Contractor203/21/2026
PIPE RITE CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KEYOWNER ENGINEERING, P.C4817409/28/2022
Building Lifecycle
All (22)Filed (5)Permit Issued (3)Signed Off (1)Violation (1)Inspection (7)Special Inspection (5)
10/07/2024
Signed off — Alteration
X01105858-I1
09/17/2024
Permit issued — General Construction
X01105858-I1-GC
09/12/2024
Filed — Alteration
X01105858-I1
10/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/05/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/28/2022
Filed — Alteration
Filing to replace Existing oil burner to a Duel Fuel Burner. Replacing existing fuel oil piping with new and providing new gas service.
X00380218-P1
09/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KWAMI AVITY
09/28/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
KWAMI AVITY
09/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KWAMI AVITY
09/13/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
KWAMI AVITY
04/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/24/2021
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
11/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KWAMI AVITY
11/17/2021
Filed — Alteration
Removal of existing meter and 1 1/2" gas piping to boiler room and installing new meter and new 3" gas piping to new duel fuel burner in Boiler Room. Replacing water supply piping in Boiler Room.
X00573415-P1
11/05/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/25/2021
Permit issued — Plumbing
X00573415-I1-PL
09/30/2021
Permit issued — Boiler Equipment
X00380218-I1-BE
08/11/2021
Filed — Alteration
Filing to replace Existing oil burner to a Duel Fuel Burner. Replacing existing fuel oil piping with new and providing new gas service.
X00380218-I1
08/11/2021
Filed — Alteration
Removal of existing meter and 1 1/2" gas piping to boiler room and installing new meter and new 3" gas piping to new duel fuel burner in Boiler Room. Replacing water supply piping in Boiler Room.
X00573415-I1
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJAKES SHEETROCK, INC09/17/2024
DOB NOWPlumbingPermit IssuedPIPE RITE CORP10/25/2021
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN09/30/2021
BISOTISSUEDPARISH PROPERTY MANAGEMENT07/31/2012
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE06/20/2012
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE06/20/2012
BISBLISSUEDMARLANDE HEATING CORP11/14/1997
BISBLISSUEDMARLANDE HEATING CORP.06/07/1993
1 project · most recent 11/17/2021
Gas
FiledStatusContractorScope
11/17/2021Permit IssuedPIPE RITE CORPGas
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2022Pass-Final Boiler Equipment InspectionPassView ↗
04/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/24/2021Fail-Final Boiler Equipment InspectionFailView ↗
11/05/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/28/2022Fire-Resistant Penetrations and JointsKWAMI AVITYspecial
09/28/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsKWAMI AVITYspecial
09/13/2022Fire-Resistant Penetrations and JointsKWAMI AVITYspecial
09/13/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsKWAMI AVITYspecial
11/18/2021Fire-Resistant Penetrations and JointsKWAMI AVITYspecial
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/25/2026X00573415-P1Request digital key ↗
08/25/2026X00573415-I1Request digital key ↗
08/21/2026X01105858-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/24/2026X00380218-I1Request digital key ↗
08/24/2026X00380218-P1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
07/27/2012220193207Open ↗
07/09/2012220193207Open ↗
06/20/2012220192155Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
07/31/2012220193207Open ↗
06/21/2012220192146Open ↗
06/21/2012220192155Open ↗
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION5
08/05/2013220193207Open ↗
07/27/2012220193207Open ↗
06/22/2012220192146Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026X00573415-I1Open ↗
08/25/2026X00573415-P1Open ↗
08/24/2026X00380218-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X00380218-I1Open ↗
09/23/2026X00380218-I1Open ↗
08/26/2026X00380218-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/20/2012220192155Open ↗
06/20/2012220192146Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/20/2012220192155Open ↗
06/20/2012220192146Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/09/2012220193207Open ↗
06/20/2012220192146Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/25/2026X00573415-I1Open ↗
08/24/2026X00380218-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/06/2013220193207Open ↗
07/09/2012220193207Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/09/2013220193207Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026X01105858-I1Open ↗
08/13/2026X00573415-I1Open ↗
08/13/2026X00380218-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/09/2012220193207Open ↗
06/20/2012220192155Open ↗
06/20/2012220192146Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/05/2013220193207Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/05/2013220193207Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/05/2013220193207Open ↗
07/09/2012220193207Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
07/09/2012220193207Open ↗
06/20/2012220192155Open ↗
06/20/2012220192146Open ↗