← Back
BuildNYC
Church, synagogue, chapel
978 EAST 167TH STREET
BRONX · BIN 2006036
💬 Discuss this project
1930Year Built
1Stories
M1Building Class
R7-1Zoning
8,646 sfGross Floor Area
0Units
0 Active Violations
Church, synagogue, chapel · 11,750 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarSt. John Chrysostom's Church5p · 2 filings · 15 docs
Site & exteriorSt. John Chrysostom's Church1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Church of St John Chrysostom1007/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PC Studio Architect109/12/2024
Ensign Engineering409/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 2147103/21/2026
Ensign Engineering P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jakes SheetrockGeneral Contractor203/21/2026
Pipe RitePlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Keyowner Engineering4817409/28/2022
Building Lifecycle
All (20)Filed (5)Permit Issued (3)Signed Off (1)Violation (1)Inspection (5)Special Inspection (5)
10/07/2024
Signed off — Alteration
X01105858-I1
09/17/2024
Permit issued — General Construction
X01105858-I1-GC
09/12/2024
Filed — Alteration
X01105858-I1
10/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/05/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/28/2022
Filed — Alteration
Filing to replace Existing oil burner to a Duel Fuel Burner. Replacing existing fuel oil piping with new and providing new gas service.
X00380218-P1
09/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KWAMI AVITY
09/28/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
KWAMI AVITY
09/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KWAMI AVITY
09/13/2022
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
KWAMI AVITY
11/24/2021
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
11/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KWAMI AVITY
11/17/2021
Filed — Alteration
Removal of existing meter and 1 1/2" gas piping to boiler room and installing new meter and new 3" gas piping to new duel fuel burner in Boiler Room. Replacing water supply piping in Boiler Room.
X00573415-P1
11/05/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/25/2021
Permit issued — Plumbing
X00573415-I1-PL
09/30/2021
Permit issued — Boiler Equipment
X00380218-I1-BE
08/11/2021
Filed — Alteration
Filing to replace Existing oil burner to a Duel Fuel Burner. Replacing existing fuel oil piping with new and providing new gas service.
X00380218-I1
08/11/2021
Filed — Alteration
Removal of existing meter and 1 1/2" gas piping to boiler room and installing new meter and new 3" gas piping to new duel fuel burner in Boiler Room. Replacing water supply piping in Boiler Room.
X00573415-I1
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJakes Sheetrock09/17/2024
DOB NOWPlumbingPermit IssuedPipe Rite10/25/2021
DOB NOWBoiler EquipmentSigned-offMichael S. Kaplan09/30/2021
BISOTISSUEDParish Property Management07/31/2012
BISEQISSUEDConsolidated Scaffold & Bridge06/20/2012
BISEQISSUEDConsolidated Scaffold & Bridge06/20/2012
BISBLISSUEDMarlande Heating11/14/1997
BISBLISSUEDMarlande Heating06/07/1993
1 project · most recent 11/17/2021
Gas
FiledStatusContractorScope
11/17/2021Permit IssuedPipe RiteGas
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2022Pass-Final Boiler Equipment InspectionPassView ↗
11/24/2021Fail-Final Boiler Equipment InspectionFailView ↗
11/05/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/28/2022Fire-Resistant Penetrations and JointsKWAMI AVITYspecial
09/28/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsKWAMI AVITYspecial
09/13/2022Fire-Resistant Penetrations and JointsKWAMI AVITYspecial
09/13/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsKWAMI AVITYspecial
11/18/2021Fire-Resistant Penetrations and JointsKWAMI AVITYspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
St. John Chrysostom's ChurchReligiousCellar
Project X01105858 Alteration · LOC Issued · 09/12/2024
Project X00380218 Alteration · Permit Entire · 08/11/2021
Project X00573415 Alteration · Permit Entire · 08/11/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/25/2026X00573415-P1Request digital key ↗
08/25/2026X00573415-I1Request digital key ↗
08/21/2026X01105858-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
08/24/2026X00380218-I1Request digital key ↗
08/24/2026X00380218-P1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
07/27/2012220193207Open ↗
07/09/2012220193207Open ↗
06/20/2012220192155Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION3
07/31/2012220193207Open ↗
06/21/2012220192146Open ↗
06/21/2012220192155Open ↗
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION5
08/05/2013220193207Open ↗
07/27/2012220193207Open ↗
06/22/2012220192146Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026X00573415-I1Open ↗
08/25/2026X00573415-P1Open ↗
08/24/2026X00380218-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X00380218-I1Open ↗
09/23/2026X00380218-I1Open ↗
08/26/2026X00380218-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/20/2012220192155Open ↗
06/20/2012220192146Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/20/2012220192155Open ↗
06/20/2012220192146Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/09/2012220193207Open ↗
06/20/2012220192146Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/25/2026X00573415-I1Open ↗
08/24/2026X00380218-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/06/2013220193207Open ↗
07/09/2012220193207Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/09/2013220193207Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/13/2026X01105858-I1Open ↗
08/13/2026X00573415-I1Open ↗
08/13/2026X00380218-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/09/2012220193207Open ↗
06/20/2012220192155Open ↗
06/20/2012220192146Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/05/2013220193207Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/05/2013220193207Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/05/2013220193207Open ↗
07/09/2012220193207Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
07/09/2012220193207Open ↗
06/20/2012220192155Open ↗
06/20/2012220192146Open ↗