← Back
BuildNYC
Motel
980 WYCKOFF AVENUE
BROOKLYN · BIN 3391528
💬 Discuss this project
2003Year Built
3Stories
H4Building Class
M1-1Zoning
16,896 sfGross Floor Area
0Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Motel · Owner of record: New P & S Realty · 12,038 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New P&S Realty1803/21/2026
Krishna Hospitality503/22/2026
Gramercy Contracting103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CNY Engineering108/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CNY Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Super Power Constructionspecialty_contractor303/21/2026
Chinatown Plumbing & HEATING_INCPlumbing109/11/2003
Gramercy Wrecking & EnvironmentalGeneral Contractor106/26/2003
Gramercy Wrecking & EnvironmntlGeneral Contractor706/26/2003
Hemchandra RamjitGeneral Contractor109/08/2000
Metal Stone ConstructionGeneral Contractor205/21/2004
Metal Stone ConstructionGeneral Contractor106/16/2004
MRC II ContractingGeneral Contractor106/26/2003
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CNY Engineering3304108/21/2024
Building Lifecycle
11/03/2026
Elevator Category 1 inspection report filed
05/08/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/09/2026
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
01/30/2026
Observed corrosion on the 3RD floor gas lines in mechanical room. Hot water heater vents on second and third floors are not properly sealed waste…
ECB violation · closed
01/30/2026
Observed on the 1ST floor missing sprinkler head escutcheon pvc piping installed on waste line in bathroom. Outside in the street water lines is…
ECB violation · closed
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Super Power Construction—
BIS—Metal Stone Construction—
BIS—Metal Stone Construction—
BIS—Metal Stone Construction—
BIS—Chinatown Plumbing & Heating—
BIS—Gramercy Wrecking & Environmntl—
BIS—Gramercy Wrecking & Environmntl—
BIS—Gramercy Wrecking & Environmntl—
BIS—Gramercy Wrecking & Environmental—
BIS—MRC II Contracting—
BIS—Gramercy Wrecking & Environmntl—
BIS—Gramercy Wrecking & Environmntl—
BIS—Gramercy Wrecking & Environmntl—
BIS—Gramercy Wrecking & Environmntl—
BIS—Hemchandra Ramjit—
Nothing on file for this building.
Nothing on file for this building.
9 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account