← Back
BuildNYC
Two stories - detached, small or mid-size
99-34 BELLAIRE PLACE
QUEENS · Queens Village · BIN 4232067
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R2Zoning
1,400 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 99 Bellaire Investment · 3,270 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 1 filing · 7 docs
Floor 1Demolition and construction 2nd floorUnder Construction5p · 2 filings · 13 docs
CellarUnder Construction5p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
99 Bellaire Investment Co403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/16/2025$409K—Private party → 99 BELLAIRE INVESTMENT CORP$292/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mohammad Ahead, PE304/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mercy ConstructionGeneral Contractor207/08/2026
All Pro Plumbing & HeatingPlumbing108/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mohammad Ahead - Professi9286104/21/2026
Building Lifecycle
08/06/2026
Permit issued — Plumbing
Q01389522-S1-PL
06/30/2026
Permit issued — General Construction
Q01389522-I1-GC
04/21/2026
Filed — Alteration
CELLAR:1. INSTALL 2PCS BATHROOM (WASH BASIN & WATER CLOSET) IN THE CELLAR.1ST FLOOR:1. REPLACE EXIST. GAS STOVE & KITCHEN SINK IN THE 1ST FLOOR.2. REPLACE EXIST. BATHTUB, WASH BASIN & WATER CLOSET IN THE 1ST FLOOR.2ND FLOOR:1. REPLACE EXIST. BATHTUB, WASH
Q01389522-S1
04/21/2026
Filed — Alteration
CELLAR:1. INSTALL 2PCS BATHROOM (WASH BASIN & WATER CLOSET) IN THE CELLAR.1ST FLOOR:1. REPLACE EXIST. GAS STOVE & KITCHEN SINK IN THE 1ST FLOOR.2. REPLACE EXIST. BATHTUB, WASH BASIN & WATER CLOSET IN THE 1ST FLOOR.2ND FLOOR:1. REPLACE EXIST. BATHTUB, WASH
Q01389522-I1
04/19/2026
Special inspection requirement — Final
ADITYA DESAI
18 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAll Pro Plumbing & Heating08/06/2026
DOB NOWGeneral ConstructionPermit IssuedMercy Construction06/30/2026
DOB NOWGeneral ConstructionPermit IssuedMercy Construction01/22/2026
1 project · most recent 04/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/21/2026Permit IssuedAll Pro Plumbing & HeatingGas, Water/Sanitary
1 project · most recent 12/22/2025
General Wiring
FiledStatusContractorScope
12/22/2025Permit IssuedClairmont Electrical ContractingGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/19/2026FinalADITYA DESAIprogress
09/02/2025FinalADITYA DESAIprogress
09/02/2025Fenestration air leakageMOHAMMAD AHEADenergy_progress
09/02/2025Fenestration areasMOHAMMAD AHEADenergy_progress
13 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account