← Back
Multi-story retail building (2+)
991 SOUTHERN BOULEVARD
BRONX · BIN 2005783
💬 Discuss this project
1989Year Built
3Stories
K2Building Class
C4-4Zoning
20,250 sfGross Floor Area
1Units
4 Open Violations ▸
Multi-story retail building (2+) · Owner of record: 991 REALTY CORP · 6,824 sf lot · 2.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneralOther
Roof19p · 2 filings · 20 docs
Floor 320p · 2 filings · 20 docs
Floor 219p · 2 filings · 20 docs
Floor 121p · 2 filings · 20 docs
Cellar25p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHOBRO MANAGEMENT2707/08/2026
991 REALTY2007/08/2026
TRC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OMF ARCHITECT PC1208/21/2024
SALVATOR A. CARADONNA JR.211/28/2023
GILSANZ MURRAY STEFICEK LLP106/21/2023
KZ ENGINEERING, P.C306/15/2023
HNY CONSULTING ENGINEERS LLC206/05/2023
WARE MALCOMB105/22/2023
SOURCE ENGINEERING PC111/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TREASURE BOX SERVICES2203/21/2026
RICHARD WAINER ARCHITECT, PLLC803/21/2026
ALL IN PERMIT CONSULTANTS203/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
LEVIN ENGINEERING PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHAPEL GENERAL CONTRACTINGeneral Contractor507/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor407/08/2026
PACIFIC PLBG&HTG CORPPlumbing407/08/2026
VANDANNY MULTISERVICE LLCGeneral Contractor303/21/2026
MAMC CONSULTING REPS LLCGeneral Contractor307/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor203/21/2026
MECHANICAL EAST CO.,INCGeneral Contractor203/21/2026
NATIONAL MAINTENANCEScaffold107/08/2026
TOVIA WERZBERGERElectrical103/21/2026
2260 MAG CORPGeneral Contractor107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
LEBO ELECTRIC LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OMF ARCHITECTS PC5900608/19/2024
DNA CONTROLLED INSPECTION554406/21/2023
TRIANGLE INSPECTION & TES7495311/15/2022
LEVIN ENGINEERING PLLC1267111/21/2019
Building Lifecycle
All (179)Filed (22)Permit Issued (19)Signed Off (14)Violation (25)Inspection (13)Objection (56)Special Inspection (30)
04/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/23/2024
Signed off — Alteration
Proposed outpatient physical therapy facility in the existing PROFESSIONAL SERVICES OFFICE. Interior renovation to add new partitions according to the attached plans. Jos is related to alt-1 filed-job#X00797892. Pl, SP, MH work to be filed separately.
X01098154-S1
10/18/2024
Signed off — Alteration
Proposed outpatient physical therapy facility in the existing PROFESSIONAL SERVICES OFFICE. Interior renovation to add new partitions according to the attached plans. Jos is related to alt-1 filed-job#X00797892. Pl, SP, MH work to be filed separately.
X01098154-I1
10/17/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/14/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/25/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2024
Permit issued — General Construction
X01098154-I1-GC
09/16/2024
Permit issued — Plumbing
X01098154-S1-PL
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/10/2024
Objection resolved — Addressed
09/05/2024
Objection resolved — Addressed
09/05/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/03/2024
Objection raised — Other
09/03/2024
Objection raised — Fire_Protection
09/03/2024
Objection raised — Other
08/26/2024
Objection raised — Fire_Protection
08/26/2024
Objection raised — Fire_Protection
08/26/2024
Objection raised — Scope
08/26/2024
Objection raised — Zoning
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Other
08/26/2024
Objection raised — Accessibility
08/26/2024
Objection raised — Fire_Protection
08/21/2024
Filed — Alteration
Proposed outpatient physical therapy facility in the existing PROFESSIONAL SERVICES OFFICE. Interior renovation to add new partitions according to the attached plans. Jos is related to alt-1 filed-job#X00797892. Pl, SP, MH work to be filed separately.
X01098154-S1
08/19/2024
Filed — Alteration
Proposed outpatient physical therapy facility in the existing PROFESSIONAL SERVICES OFFICE. Interior renovation to add new partitions according to the attached plans. Jos is related to alt-1 filed-job#X00797892. Pl, SP, MH work to be filed separately.
X01098154-I1
08/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
OSCAR FUERTES
02/01/2024
Signed off — Alteration
ERECT 4 ILLUMINATED ACCESSORY BUSINESS SIGNS FOR JD SPORTS.
X00936865-I1
01/10/2024
Signed off — Alteration
Minor plumbing work for a retail fitout in conjunction with #X00869864-I1. No change in egress, use or occupancy.
X00869864-S1
11/30/2023
Signed off — Alteration
Minor plumbing work for a retail fitout in conjunction with #X00869864-I1. No change in egress, use or occupancy.
X00869864-S2
11/30/2023
Special inspection requirement — Final
SALVATOR CARADONNA
11/28/2023
Filed — Alteration
ERECT 4 ILLUMINATED ACCESSORY BUSINESS SIGNS FOR JD SPORTS.
X00936865-P1
11/28/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/27/2023
Signed off — Alteration
Minor plumbing work for a retail fitout in conjunction with #X00869864-I1. No change in egress, use or occupancy.
X00869864-S4
11/27/2023
Signed off — Alteration
Minor plumbing work for a retail fitout in conjunction with #X00869864-I1. No change in egress, use or occupancy.
X00869864-I1
11/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/15/2023
Special inspection requirement — Final
SALVATOR CARADONNA
10/27/2023
Permit issued — Sign
X00936865-I1-SG
10/24/2023
Filed — Alteration
ERECT 4 ILLUMINATED ACCESSORY BUSINESS SIGNS FOR JD SPORTS.
X00936865-I1
10/18/2023
Signed off — Alteration
PROPOSED PLUMBING WORK THROUGH THE BUILDING, REMOVE EXISTING BATHROOMS, AND RELOCATE AS PER PLANS.
X00813006-I1
09/13/2023
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00889149-I1
09/13/2023
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00889156-I1
09/13/2023
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00889140-I1
09/12/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/19/2023
Permit issued — Plumbing
X00869864-S2-PL
07/18/2023
Permit issued — Structural
X00869864-S1-ST
07/13/2023
Objection resolved — Addressed
07/12/2023
Objection resolved — Addressed
06/29/2023
Permit issued — General Construction
X00869864-I1-GC
06/29/2023
Permit issued — Mechanical Systems
X00869864-S4-MS
06/29/2023
Objection resolved — Addressed
06/29/2023
Objection resolved — Addressed
06/29/2023
Objection resolved — Addressed
Latest 60 of 179 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMC SUPERSTRUCTURE INC09/16/2024
DOB NOWPlumbingSigned-offPACIFIC PLBG&HTG CORP09/16/2024
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC10/27/2023
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR07/19/2023
DOB NOWStructuralSigned-offSHAPEL GENERAL CONTRACTIN07/18/2023
DOB NOWGeneral ConstructionSigned-offSHAPEL GENERAL CONTRACTIN06/29/2023
DOB NOWMechanical SystemsSigned-offSHAPEL GENERAL CONTRACTIN06/29/2023
DOB NOWGeneral ConstructionSigned-offSHAPEL GENERAL CONTRACTIN06/23/2023
DOB NOWMechanical SystemsSigned-offSHAPEL GENERAL CONTRACTIN06/23/2023
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC06/16/2023
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC06/15/2023
DOB NOWConstruction FenceSigned-offARSENAL SCAFFOLD INC06/15/2023
DOB NOWStructuralSigned-offMAMC CONSULTING REPS LLC03/06/2023
DOB NOWPlumbingSigned-offPACIFIC PLBG&HTG CORP02/08/2023
DOB NOWGeneral ConstructionPermit IssuedMAMC CONSULTING REPS LLC01/13/2023
DOB NOWGeneral ConstructionSigned-offMAMC CONSULTING REPS LLC10/21/2022
DOB NOWGeneral ConstructionSigned-offVANDANNY MULTISERVICE LLC10/20/2022
DOB NOWGeneral ConstructionSigned-off2260 MAG CORP08/19/2022
DOB NOWMechanical SystemsSigned-offMECHANICAL EAST CO.,INC12/30/2019
BISMHISSUEDMECHANICAL EAST CO.,INC06/27/2017
BISEQISSUEDCOLGATE SCAFFOLDING04/30/1999
BISEQISSUEDCOLGATE SCAFFOLDING03/17/1999
10 projects · most recent 11/25/2024
General Wiring
FiledStatusContractorScope
11/25/2024Permit IssuedPOWER DIRECT ELECTRIC INC—
11/15/2023CompletePROFF ELECTRICAL LLC—
11/15/2023CompletePROFF ELECTRICAL LLC—
11/15/2023CompletePROFF ELECTRICAL LLC—
11/15/2023CompletePROFF ELECTRICAL LLC—
07/25/2023CompleteLEBO ELECTRIC LLCGeneral Wiring
06/15/2023CompleteNASH ELECTRIC SERVICES IN—
05/16/2023CompleteSTAR ELEC'L CONTRACTORS C—
05/11/2023Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
08/16/2022CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
04/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/24/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/20/2023Fail-Final General Construction Non-Directive 14FailView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
08/19/2024Fire-Resistant Penetrations and JointsOSCAR FUERTESspecial
11/30/2023FinalSALVATOR CARADONNAprogress
11/15/2023FinalSALVATOR CARADONNAprogress
06/14/2023Post-installed AnchorsWILLIAM FITZJOHNspecial
06/14/2023HVAC-R and service water piping design and insulationWILLIAM FITZJOHNenergy_progress
06/14/2023Maintenance informationWILLIAM FITZJOHNenergy_progress
06/14/2023Energy Code Compliance InspectionsWILLIAM FITZJOHNprogress
06/07/2023Insulation placement and R valuesOSCAR FUERTESenergy_progress
06/07/2023Structural Stability – Alterations of existing buildingsOSCAR FUERTESspecial
06/07/2023MasonryOSCAR FUERTESspecial
06/07/2023Concrete - Cast-In-PlaceOSCAR FUERTESspecial
06/07/2023Fire-Resistant Penetrations and JointsOSCAR FUERTESspecial
06/07/2023Energy Code Compliance InspectionsOSCAR FUERTESprogress
06/07/2023Fenestration areasOSCAR FUERTESenergy_progress
06/07/2023Fenestration and door U-factor and product ratingsOSCAR FUERTESenergy_progress
06/07/2023Maintenance informationOSCAR FUERTESenergy_progress
06/07/2023Fenestration air leakageOSCAR FUERTESenergy_progress
05/22/2023Post-installed AnchorsWILLIAM FITZJOHNspecial
05/22/2023Structural Stability – Alterations of existing buildingsWILLIAM FITZJOHNspecial
05/15/2023Maintenance informationWILLIAM FITZJOHNenergy_progress
05/15/2023HVAC-R and service water piping design and insulationWILLIAM FITZJOHNenergy_progress
05/15/2023Shutoff dampersWILLIAM FITZJOHNenergy_progress
05/15/2023Heating SystemsWILLIAM FITZJOHNspecial
05/08/2023Sprayed fire-resistant materialsWILLIAM FITZJOHNspecial
05/06/2023FinalWILLIAM FITZJOHNprogress
Latest 25 of 53.
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch18
08/23/2026X00750526-P2Request digital key ↗
08/23/2026X00750526-I1Request digital key ↗
08/23/2026X00750526-S1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00261773-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
08/30/2017240186507Open ↗
06/19/2017240186507Open ↗
▸BISWORK PERMIT APPLICATION1
06/27/2017240186507Open ↗
▸Seals & Professional Certifications66
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026X00813006-P1Open ↗
09/02/2026X00813006-P1Open ↗
09/02/2026X00813006-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/23/2026X00750526-I1Open ↗
08/23/2026X00750526-S1Open ↗
08/23/2026X00750526-P1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/01/2026X00869864-I1Open ↗
09/01/2026X00750526-P1Open ↗
09/01/2026X00869864-S4Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/08/2017240186507Open ↗
09/08/2017240186507Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/19/2017240186507Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/30/2017240186507Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/19/2017240186507Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/19/2017240186507Open ↗
▸Trade Schedules & Equipment4
▸BISEQUIPMENT USE PERMITS2
09/18/2017240186507Open ↗
09/08/2017240186507Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
09/18/2017240186507Open ↗
09/08/2017240186507Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026X00797892-I1Open ↗
08/13/2026X00797892-P1Open ↗
08/13/2026X00797892-P2Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/23/2026X00750526-P1Open ↗
08/23/2026X00750526-I1Open ↗
08/23/2026X00750526-S1Open ↗
Showing 3 of 16 on file for this type
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/08/2017240186507Open ↗
09/08/2017240186507Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/08/2017240186507Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/19/2017240186507Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/08/2017240186507Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/08/2017240186507Open ↗
06/19/2017240186507Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
06/19/2017240186507Open ↗
▸BISADDITIONAL INFORMATION1
08/30/2017240186507Open ↗
▸BISBOROUGH INTAKE FORM1
09/08/2017240186507Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/13/2026X00797892-P1Open ↗
08/13/2026X00797892-P2Open ↗
08/13/2026X00797892-I1Open ↗