Elevator apt, semi-fireproof with stores
The Lirio Condominium
9TH AVENUE · BIN 1091779
💬 Discuss this project
2024Year Built
9Stories
D7Building Class
C6-2Zoning
156,778 sfGross Floor Area
113Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: HOUSING WORKS LIRIO HOUSING DEVELOPMENT FUND CORPO · 22,368 sf lot · 7.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction64p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 19 docs
Floor 9Under Construction105p · 2 filings · 20 docs
Floor 8Under Construction103p · 2 filings · 20 docs
Floor 7Under Construction103p · 2 filings · 20 docs
Floor 6Under Construction105p · 3 filings · 20 docs
Floor 5Under Construction104p · 3 filings · 20 docs
Floor 4Under Construction108p · 2 filings · 20 docs
Floor 3Under Construction254p · 2 filings · 20 docs
Floor 2Under Construction253p · 2 filings · 20 docs
Floor 1Under Construction325p · 2 filings · 20 docs
CellarUnder Construction316p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOUSING IS A HUMAN RIGHT LLC3509/15/2026
COSAN CONSTRUCTION809/13/2026
SKYLINE SCAFFOLDING GROUP309/13/2026
MOORE GROUP404/09/2026
BROADWAY BUILDERS403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.4503/21/2026
EUROCELT EXPEDITING, INC203/21/2026
LOMBARDO PROFESSIONAL ENGINEERING103/21/2026
SUNKEEPER SOLAR ELECTRIC LLC203/21/2026
LOMBARDO BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROADWAY BUILDERS LLCGeneral Contractor1707/08/2026
COSAN CONSTRUCTION CORPGeneral Contractor307/08/2026
AURA PLUMBING INCFire Protection307/08/2026
BLETSAS PLBNG & HTG CORPFire Protection307/08/2026
FLINT MECHANICAL CORPFire Protection307/08/2026
PANILI PLUMBING & HTG LLCPlumbing207/08/2026
MOORE GROUP CORPORATIONGeneral Contractor204/09/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor208/25/2026
BLETSAS PLBNG & HTG CORPPlumbing207/08/2026
FLINT MECHANICAL CORPPlumbing207/08/2026
SC PRIME ENERGY LTDGeneral Contractor107/08/2026
TF ELECTRICAL CORPElectrical103/22/2026
SUNKEEPER SOLAR ELECTRICGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8433308/03/2026
JAMES J STOUT ARCHITECTS5913307/16/2026
AMM ENGINEERING PC725305/27/2026
Building Lifecycle
All (191)Filed (42)Permit Issued (37)Signed Off (2)Violation (6)Inspection (15)Objection (59)Special Inspection (30)
09/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/01/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/25/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/24/2026
Permit issued — Sidewalk Shed
M08022866-Z5-SH
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — Structural Steel - Welding
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — Structural Steel - Details
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — Final
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
08/17/2026
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
08/06/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
M01275109-I1
08/03/2026
Filed — New Building
Underpinning as per plans filed
M08022866-B8
07/31/2026
Special inspection requirement — Standpipe Systems
JOHN MCMONAGLE
07/31/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
07/31/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/30/2026
Objection resolved — Resolved
07/27/2026
Special inspection requirement — Footing and Foundation
JOHN MCMONAGLE
07/27/2026
Special inspection requirement — Final
JOHN MCMONAGLE
07/27/2026
Special inspection requirement — Concrete - Cast-In-Place
JOHN MCMONAGLE
07/17/2026
Special inspection requirement — Air barrier - visual inspection
JAMES J STOUT
07/17/2026
Special inspection requirement — Final
JAMES J STOUT
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES J STOUT
07/17/2026
Special inspection requirement — Post-installed Anchors
JAMES J STOUT
07/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES J STOUT
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES J STOUT
07/17/2026
Special inspection requirement — Maintenance information
JAMES J STOUT
07/16/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.
M01275109-P1
07/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES J STOUT
07/08/2026
Objection raised — Other
06/25/2026
Objection raised — Other
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Resolved
06/23/2026
Objection raised — Scope
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES J STOUT
06/16/2026
Special inspection requirement — Air barrier - visual inspection
JAMES J STOUT
06/16/2026
Special inspection requirement — Final
JAMES J STOUT
06/16/2026
Special inspection requirement — Maintenance information
JAMES J STOUT
06/16/2026
Special inspection requirement — Post-installed Anchors
JAMES J STOUT
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES J STOUT
06/08/2026
Filed — New Building
Underpinning as per plans filed
M08022866-B6
06/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Masonry
JOHN MCMONAGLE
06/05/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
06/01/2026
Permit issued — General Construction
M08022866-I1-GC
05/29/2026
Objection raised — Other
05/28/2026
Filed — New Building
Underpinning as per plans filed
M08022866-Z5
05/28/2026
Permit issued — Sidewalk Shed
M08022866-Z5-SH
05/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
M01220720-S1
05/27/2026
Permit issued — Supported Scaffold
M01220720-S1-SF
05/22/2026
Filed — New Building
Underpinning as per plans filed
M08022866-B4
05/21/2026
Filed — New Building
Underpinning as per plans filed
M08022866-B5
05/21/2026
Filed — New Building
Underpinning as per plans filed
M08022866-B3
05/21/2026
Filed — New Building
Underpinning as per plans filed
M08022866-B1
05/21/2026
Filed — New Building
Underpinning as per plans filed
M08022866-B2
05/20/2026
Filed — New Building
Underpinning as per plans filed
M08022866-A9
04/25/2026
Violation issued (ECB, closed)
Construction
04/17/2026
Signed off — New Building
Underpinning as per plans filed
M08022866-S2
04/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP08/24/2026
DOB NOWGeneral ConstructionPermit IssuedBROADWAY BUILDERS LLC06/01/2026
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP05/28/2026
DOB NOWSupported ScaffoldPermit IssuedCOSAN CONSTRUCTION CORP05/27/2026
DOB NOWStandpipePermit IssuedBLETSAS P&H CORP01/07/2026
DOB NOWSprinklersPermit IssuedBLETSAS P&H CORP01/07/2026
DOB NOWBoiler EquipmentPermit IssuedFLINT MECHANICAL CORP12/24/2025
DOB NOWPlumbingPermit IssuedFLINT MECHANICAL CORP12/22/2025
DOB NOWStandpipePermit IssuedBLETSAS P&H CORP12/22/2025
DOB NOWSolarSigned-offSUNKEEPER SOLAR ELECTRIC09/09/2025
DOB NOWSuspended ScaffoldPermit IssuedCOSAN CONSTRUCTION07/29/2025
DOB NOWGeneral ConstructionPermit IssuedBROADWAY BUILDERS LLC06/05/2025
DOB NOWSupported ScaffoldPermit IssuedCOSAN CONSTRUCTION05/16/2025
DOB NOWPlumbingPermit IssuedPANILI PLUMBING & HTG LLC02/18/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedMOORE GROUP CORPORATION01/31/2025
DOB NOWStandpipePermit IssuedAURA PLUMBING INC12/31/2024
DOB NOWSprinklersPermit IssuedAURA PLUMBING INC12/31/2024
DOB NOWStandpipePermit IssuedAURA PLUMBING INC12/31/2024
DOB NOWBoiler EquipmentPermit IssuedPANILI PLUMBING & HTG LLC12/30/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedMOORE GROUP CORPORATION12/05/2024
DOB NOWFoundationPermit IssuedBROADWAY BUILDERS LLC11/04/2024
DOB NOWStructuralPermit IssuedBROADWAY BUILDERS LLC11/04/2024
DOB NOWMechanical SystemsPermit IssuedSC PRIME ENERGY LTD09/27/2024
DOB NOWStandpipePermit IssuedBLETSAS PLBNG & HTG CORP09/17/2024
DOB NOWSprinklersPermit IssuedBLETSAS PLBNG & HTG CORP09/17/2024
DOB NOWStructuralPermit IssuedBROADWAY BUILDERS LLC07/31/2024
DOB NOWStandpipePermit IssuedBLETSAS PLBNG & HTG CORP07/26/2024
DOB NOWPlumbingPermit IssuedBLETSAS PLBNG & HTG CORP07/24/2024
DOB NOWBoiler EquipmentPermit IssuedBLETSAS PLBNG & HTG CORP07/24/2024
DOB NOWMechanical SystemsPermit IssuedBROADWAY BUILDERS LLC07/12/2024
DOB NOWFoundationPermit IssuedBROADWAY BUILDERS LLC06/11/2024
DOB NOWSupport of ExcavationSigned-offBROADWAY BUILDERS LLC05/30/2024
DOB NOWFoundationPermit IssuedBROADWAY BUILDERS LLC05/30/2024
DOB NOWGeneral ConstructionPermit IssuedBROADWAY BUILDERS LLC05/30/2024
DOB NOWGeneral ConstructionPermit IssuedBROADWAY BUILDERS LLC04/26/2024
DOB NOWFoundationPermit IssuedBROADWAY BUILDERS LLC04/16/2024
DOB NOWSupport of ExcavationSigned-offBROADWAY BUILDERS LLC04/11/2024
1 project · most recent 08/03/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026Permit IssuedSKYLINE SCAFFOLDING GROUPAir Conditioning Systems
Cooling
Mitsubishi Electric TUHYE0963AN40A 96,000 BTU · Condensing Unit ×24
TUHYE1443AN40A 144,000 BTU · Vrf Outdoor ×21
TUHYE1203AN40A 120,000 BTU · Vrf Outdoor ×12
TUHYE0723AN40A 144,000 BTU · Vrf Outdoor ×6
TUHYE1683AN40A 168,000 BTU · Vrf Outdoor ×3
1 project · most recent 08/03/2026
Sprinkler System
FiledStatusContractorScope
08/03/2026Permit IssuedBLETSAS P&H CORPSprinkler System
1 project · most recent 08/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Permit IssuedBLETSAS P&H CORPGas, Storm, Water/Sanitary
5 projects · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026Permit IssuedTOP SHELF ELECTRIC CORP—
08/21/2025CompleteSUNKEEPER SOLAR LLC—
07/28/2025Permit IssuedTF ELECTRICAL CORPGeneral Wiring
07/28/2025Permit IssuedTF ELECTRICAL CORPGeneral Wiring
07/28/2025Permit IssuedTF ELECTRICAL CORPGeneral Wiring
1 project · most recent 08/03/2026
Steel Concrete
FiledStatusContractorScope
08/03/2026Permit IssuedSKYLINE SCAFFOLDING GROUPSteel, Concrete
1 project · most recent 07/16/2026
FiledStatusContractorScope
07/16/2026Signed-offSUNKEEPER SOLAR ELECTRIC216 panels, 114.6 kw, 11,280 roof_area_sqft
2 projects · most recent 08/03/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
08/03/2026Permit IssuedSKYLINE SCAFFOLDING GROUPSidewalk Shed
05/27/2026Permit IssuedCOSAN CONSTRUCTION CORPScaffold
1 project · most recent 11/06/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
11/06/2025Permit IssuedCOSAN CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
09/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/01/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/25/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/23/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2026Pass-Final PL - UndergroundPassView ↗
01/08/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/24/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
04/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/03/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/17/2026Post-installed AnchorsJOHN MCMONAGLEspecial
08/17/2026Structural Steel - WeldingJOHN MCMONAGLEspecial
08/17/2026Structural Steel - DetailsJOHN MCMONAGLEspecial
08/17/2026Structural Steel - High Strength BoltingJOHN MCMONAGLEspecial
08/17/2026Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
08/17/2026FinalJOHN MCMONAGLEprogress
07/31/2026Standpipe SystemsJOHN MCMONAGLEspecial
07/31/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/31/2026Post-installed AnchorsJOHN MCMONAGLEspecial
07/31/2026Sprinkler SystemsJOHN MCMONAGLEspecial
07/27/2026Footing and FoundationJOHN MCMONAGLEprogress
07/27/2026FinalJOHN MCMONAGLEprogress
07/27/2026Concrete - Cast-In-PlaceJOHN MCMONAGLEspecial
07/17/2026Air barrier - visual inspectionJAMES J STOUTenergy_progress
07/17/2026Maintenance informationJAMES J STOUTenergy_progress
07/17/2026FinalJAMES J STOUTprogress
07/17/2026Energy Code Compliance InspectionsJAMES J STOUTprogress
07/17/2026Fire-Resistant Penetrations and JointsJAMES J STOUTspecial
07/17/2026Structural Stability – Alterations of existing buildingsJAMES J STOUTspecial
07/17/2026Post-installed AnchorsJAMES J STOUTspecial
07/16/2026Structural Stability – Alterations of existing buildingsJAMES J STOUTspecial
06/16/2026FinalJAMES J STOUTprogress
06/16/2026Maintenance informationJAMES J STOUTenergy_progress
06/16/2026Energy Code Compliance InspectionsJAMES J STOUTprogress
06/16/2026Post-installed AnchorsJAMES J STOUTspecial
Latest 25 of 150.
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings44
▸DOB NOWPlans/Sketch44
09/01/2026M08022866-B1Request digital key ↗
09/01/2026M08022866-B6Request digital key ↗
09/01/2026M08022866-S3Request digital key ↗
Showing 3 of 44 on file for this type
▸Applications & Permits13
▸DOB NOWDEP Stormwater Construction Permit8
08/15/2026M08022866-B6Open ↗
08/14/2026M08022866-B2Open ↗
08/13/2026M08022866-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit5
08/15/2026M08022866-B6Open ↗
08/13/2026M08022866-P5Open ↗
08/13/2026M08022866-I1Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZoning Exhibit form (1-5)5
08/15/2026M08022866-B6Open ↗
08/13/2026M08022866-I1Open ↗
08/13/2026M08022866-A7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/15/2026M08022866-B6Open ↗
08/13/2026M08022866-P5Open ↗
08/13/2026M08022866-A9Open ↗
Showing 3 of 5 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/30/2024121254043Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
07/30/2024121254043Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/30/2024121254043Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/30/2024121254043Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
07/30/2024121254043Open ↗
▸BISZONING EXHIBIT V: CERTIFICATION1
07/30/2024121254043Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M08022866-I1Open ↗
▸Seals & Professional Certifications101
▸DOB NOWDPL-1: Design Professional Seal & Signature42
09/01/2026M08046753-I1Open ↗
08/23/2026M01220720-S1Open ↗
08/21/2026M01275109-P1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026M08022866-S7Open ↗
09/02/2026M08022866-A5Open ↗
09/01/2026M08022866-A4Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/23/2026M08022866-S7Open ↗
09/01/2026M08022866-A6Open ↗
09/01/2026M08022866-S9Open ↗
Showing 3 of 27 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026M08022866-A7Open ↗
08/13/2026M08022866-I1Open ↗
08/13/2026M08022866-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026M08022866-I1—
▸Safety & Tenant Protection14
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist8
08/23/2026M01220720-S1Open ↗
08/16/2026M08022866-Z5Open ↗
08/16/2026M08022866-B5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWStreet Tree Checklist5
08/15/2026M08022866-B6Open ↗
08/13/2026M08022866-A7Open ↗
08/13/2026M08022866-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M08022866-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/30/2024121254043Open ↗
07/30/2024121254043Open ↗
07/30/2024121254043Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/21/2026M01275109-I1Open ↗
▸Other Documents20
▸DOB NOWProperty Ownership Certification5
08/15/2026M08022866-B6Open ↗
08/13/2026M08022866-A9Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/15/2026M08022866-B6Open ↗
08/13/2026M08022866-A9Open ↗
08/13/2026M08022866-A7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/15/2026M08022866-B6Open ↗
08/13/2026M08022866-P5Open ↗
08/13/2026M08022866-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01261516-I1Open ↗
08/13/2026M01261516-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M01261516-P1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026M08022866-S2Open ↗