← Back
Elevator apt, fireproof with stores
CLINTON STREET
MANHATTAN · BIN 1083423
💬 Discuss this project
1972Year Built
26Stories
D6Building Class
R8Zoning
225,000 sfGross Floor Area
403Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SAFE
Elevator apt, fireproof with stores · 36,905 sf lot · 6.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof13p · 10 filings · 20 docs
Bulkhead1p · 1 filing · 3 docs
Floor 122p · 9 filings · 20 docs
Cellar17p · 6 filings · 20 docs
12 jobs · most recent 05/28/2025
General Wiring
FiledStatusContractorScope
05/28/2025CompleteSPECTRUM ON BROADWAY-ELEC—
05/28/2025CompleteSPECTRUM ON BROADWAY-ELEC—
03/20/2025CompleteKI ELECTRIC, INCGeneral Wiring
03/14/2025CompleteC.M. RICHEY ELEC'L CONTRGeneral Wiring
08/02/2024CompleteMIKOMA ELECTRIC LLC—
04/19/2024CompleteROZ-A-LITE ELEC'L CONTG IGeneral Wiring
02/21/2024CompleteHIGH QUALITY ELECTRIC OF—
03/30/2022CompleteROBERT CHIMENTI3 meters, 1 new_meters
12/04/2020CompleteRAINBOW ELECTRIC CO., INC—
12/04/2020CompleteRAINBOW ELECTRIC CO., INC—
12/25/2019CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
11/14/2018CompleteTOP SHELF ELECTRIC CORP—
Building Lifecycle
All (252)Filed (37)Permit Issued (41)Signed Off (28)Facade (FISP) (15)Violation (60)Inspection (15)Objection (26)Special Inspection (30)
04/10/2026
Signed off — Alteration
Interior fit-out of new facility for the sale of produce, food, supplies including new partitions, lighting, and sales furniture as per plans submitted herewith. No change of use, occupancy, or egress under this application.
M01157757-I1
04/08/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/11/2026
Signed off — Alteration
M01169219-I1
02/16/2026
Violation issued (HPD, closed)
C
02/16/2026
Violation issued (HPD, closed)
B
02/13/2026
Violation issued (HPD, closed)
B
02/13/2026
Violation issued (HPD, closed)
A
02/13/2026
Violation issued (HPD, closed)
B
02/13/2026
Violation issued (HPD, closed)
C
01/27/2026
Signed off — Alteration
installation of plumbing fixtures and associated piping. No change of use, occupancy or egress under this application.
M01158541-I1
12/16/2025
Signed off — Alteration
Installation of a New 4 Ton Heat Pump connected to three indoor inits. Located at each entrance and the middle of the first floor lobby. As per plans filed herewith no change in use, egress or occupancy.
M00900353-I1
12/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
Walter Marin
12/02/2025
Filed — Alteration
installation of plumbing fixtures and associated piping. No change of use, occupancy or egress under this application.
M01158541-P5
11/20/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/07/2025
Signed off — Alteration
installation of units and associated duct work. No change of use, occupancy or egress under this application.
M01158531-I1
11/04/2025
Filed — Alteration
installation of plumbing fixtures and associated piping. No change of use, occupancy or egress under this application.
M01158541-P4
10/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/02/2025
Filed — Alteration
installation of plumbing fixtures and associated piping. No change of use, occupancy or egress under this application.
M01158541-P3
08/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/14/2025
Filed — Alteration
Installation of a New 4 Ton Heat Pump connected to three indoor inits. Located at each entrance and the middle of the first floor lobby. As per plans filed herewith no change in use, egress or occupancy.
M00900353-P1
07/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2025
Signed off — Alteration
Earthwork for site/landscape work as per plans filed. Filed in conjunction with NB #M00901820.
M00966000-I1
07/02/2025
Filed — Alteration
installation of plumbing fixtures and associated piping. No change of use, occupancy or egress under this application.
M01158541-P2
06/25/2025
Signed off — Alteration
FULL ROOF REPLACEMENT, AND INSTALLATION OF ASSOCIATED FLASHING/WATERPROOFING SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGETO USE, EGRESS OR OCCUPANCY.
M01061853-I1
06/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/25/2025
Special inspection requirement — Final
Orah Weisberg
06/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Orah Weisberg
06/25/2025
Special inspection requirement — Mechanical Systems
Orah Weisberg
06/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Orah Weisberg
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Orah Weisberg
06/25/2025
Special inspection requirement — Maintenance information
Orah Weisberg
06/03/2025
Violation issued (HPD, closed)
B
05/15/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01095164-I1
05/14/2025
Violation issued (HPD, closed)
C
05/14/2025
Violation issued (HPD, closed)
A
05/14/2025
Violation issued (HPD, closed)
C
05/12/2025
Signed off — Alteration
Erect non illuminated non advertising sign on wall. No change of use, egress or occupancy
M01170010-I1
05/12/2025
Signed off — Alteration
Erect non illuminated non advertising D/F projecting sign on wall. No change of use, egress or occupancy
M01170019-I1
05/12/2025
Signed off — Alteration
M01170017-I1
05/12/2025
Signed off — Alteration
Erect illuminated non advertising sign on wall. No change of use, egress or occupancy
M01170009-I1
05/12/2025
Signed off — Alteration
Erect illuminated non advertising sign on wall. No change of use, egress or occupancy
M01170006-I1
05/12/2025
Signed off — Alteration
Erect non illuminated non advertising sign on wall. No change of use, egress or occupancy
M01170014-I1
05/12/2025
Signed off — Alteration
Erect non illuminated non advertising sign on wall. No change of use, egress or occupancy
M01170012-I1
05/08/2025
Signed off — Alteration
FILED FOR APPROVAL OF STRUCTURAL APPROVAL.
M01152369-I1
05/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/06/2025
Violation issued (HPD, closed)
C
05/06/2025
Violation issued (HPD, closed)
C
04/25/2025
Signed off — Alteration
Selective demolition and removal of interior partitions, concrete slab and floor finishes, ceilings and interior lighting. Selective exterior demolition of exisiting storefront glazing. no change of use, occupancy or egress under this application.
M01076626-I1
04/18/2025
Cycle 9 facade report submitted
04/17/2025
Signed off — Alteration
M01158561-I1
04/11/2025
Signed off — Alteration
MECHANICAL WORK AS PER PLANS FILED HEREWITH. WORK INCLUDES INSTALLATION OF PACKAGED ROOFTOP UNIT. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00944270-I1
04/11/2025
Special inspection requirement — Mechanical Systems
Ari Kamo
04/11/2025
Special inspection requirement — Final
Ari Kamo
04/11/2025
Special inspection requirement — Post-installed Anchors
Ari Kamo
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
04/11/2025
Special inspection requirement — Maintenance information
Ari Kamo
04/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ari Kamo
04/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Ari Kamo
04/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ari Kamo
Latest 60 of 252 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BERKOWNERS3007/08/2026
LIDL US2507/08/2026
ACE GROUP NY407/08/2026
GRAND STREET GUILD EAST HDFC907/08/2026
KINGS GROUP NY CORP503/22/2026
DHC CONTRACTING203/22/2026
SOUTH EAS GCG HF 10 IN103/22/2026
SOUTH EAST GSG HDF CO INC203/22/2026
SOUTH IAS GSG HDF CO INC103/22/2026
RESIDENTIAL MGMT ASSOC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MARIN ARCHITECTS, P.C.703/21/2026
D R BROWN1403/21/2026
CANAS SOLUTIONS1003/21/2026
MUNICIPAL BUILDING CONSULTANTS803/21/2026
JM ZONING, LLC.103/21/2026
AE DESIGN SOLUTION203/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
GREEN STUDIO203/21/2026
PS ENGINEERS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor907/08/2026
N Y SIGN ARTScaffold707/08/2026
LORICH CONSTRUCTION MANAGEMENTGeneral Contractor607/08/2026
SAGE BUILDERS CORPGeneral Contractor607/08/2026
ACTIVE SIGNSScaffold607/08/2026
CHRIS RICHEYElectrical303/21/2026
MONADNOCK GEN'L CONT INCGeneral Contractor303/21/2026
HOLT CONSTRUCTION CORPGeneral Contractor307/08/2026
KINGS GROUP NY CORPGeneral Contractor303/21/2026
MASPETH CONTRACTING CORPGeneral Contractor203/21/2026
TECHNICAL COMFORT OF NY*General Contractor104/09/2026
A & M WARSHAW PLBG & HTGPlumbing107/08/2026
PRACTICAL PLBG & HTG INCPlumbing107/08/2026
JOSEPH LA VOLPEElectrical103/21/2026
PRACTICAL PLBG & HTG INCFire Protection107/08/2026
CMA PLUMBING & HEATING INFire Protection107/08/2026
ACE GROUP NY CORPGeneral Contractor107/08/2026
FLAG EXTERIORS CORPGeneral Contractor107/08/2026
C.M. RICHEY ELEC'L CONTRElectrical103/22/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRW ENGINEERING & ARCHITE1162108/14/2025
AK ENGINEERING PC678803/31/2025
WHITESTONE ASSOCIATES ENG8144603/11/2025
MARIN ARCHITECTS PC5722201/07/2025
BLANCO DESIGN, INC9212106/17/2024
METRIC CONSULTING AND INS1803101/19/2024
CATALPA SPECIAL INSPECTIO2004101/19/2024
VIBRANALYSIS INC., DBA VT6864112/15/2023
MICHAEL ALMON, ARCHITECT5114108/03/2023
FRANCISCO D. PEREZ PE3306108/03/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSKANSKA BUILDING INC03/07/2025
DOB NOWSignSigned-offSKANSKA BUILDING INC03/07/2025
DOB NOWSignSigned-offSKANSKA BUILDING INC03/07/2025
DOB NOWSignSigned-offSKANSKA BUILDING INC03/07/2025
DOB NOWSignSigned-offSKANSKA BUILDING INC03/07/2025
DOB NOWSignSigned-offSKANSKA BUILDING INC03/07/2025
DOB NOWSignSigned-offSKANSKA BUILDING INC03/07/2025
DOB NOWStructuralSigned-offSAGE BUILDERS CORP02/26/2025
DOB NOWPlumbingSigned-offA & M WARSHAW PLBG & HTG01/30/2025
DOB NOWMechanical SystemsSigned-offLORICH CONSTRUCTION MANAGEMENT01/29/2025
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC01/22/2025
DOB NOWSprinklersSigned-offCMA PLUMBING & HEATING IN01/15/2025
DOB NOWGeneral ConstructionSigned-offLORICH CONSTRUCTION MANAGEMENT01/09/2025
DOB NOWGeneral ConstructionPermit IssuedLORICH CONSTRUCTION MANAGEMENT12/31/2024
DOB NOWStructuralSigned-offLORICH CONSTRUCTION MANAGEMENT12/26/2024
DOB NOWGeneral ConstructionSigned-offLORICH CONSTRUCTION MANAGEMENT10/28/2024
DOB NOWGeneral ConstructionSigned-offSAGE BUILDERS CORP09/25/2024
DOB NOWGeneral ConstructionSigned-offHOLT CONSTRUCTION CORP09/10/2024
DOB NOWGeneral ConstructionSigned-offFLAG EXTERIORS CORP09/03/2024
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC08/30/2024
DOB NOWSprinklersSigned-offPRACTICAL PLBG & HTG INC08/30/2024
DOB NOWGeneral ConstructionSigned-offSAGE BUILDERS CORP08/23/2024
DOB NOWMechanical SystemsSigned-offSAGE BUILDERS CORP08/23/2024
DOB NOWSidewalk ShedSigned-offACE GROUP NY CORP08/13/2024
DOB NOWGeneral ConstructionSigned-offHOLT CONSTRUCTION CORP07/12/2024
DOB NOWMechanical SystemsSigned-offTECHNICAL COMFORT OF NY*05/31/2024
DOB NOWGeneral ConstructionSigned-offMASPETH CONTRACTING CORP04/03/2024
DOB NOWSuspended ScaffoldSigned-offMASPETH CONTRACTING CORP03/08/2024
DOB NOWSuspended ScaffoldSigned-offMASPETH CONTRACTING CORP02/15/2024
DOB NOWEarth WorkSigned-offMONADNOCK GEN'L CONT INC02/09/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/22/2024
DOB NOWSignPermit IssuedACTIVE SIGNS INC12/10/2020
DOB NOWSignPermit IssuedACTIVE SIGNS INC12/10/2020
DOB NOWSignPermit IssuedACTIVE SIGNS INC12/10/2020
DOB NOWSignPermit IssuedACTIVE SIGNS INC12/10/2020
DOB NOWSignPermit IssuedACTIVE SIGNS INC12/10/2020
DOB NOWSignPermit IssuedACTIVE SIGNS INC12/10/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/03/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/31/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/17/2019
+ 48 more permits on file
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
04/08/2026Pass-Final General Construction Non-Directive 14PassView ↗
11/20/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/07/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
12/03/2025Tenant Protection Plan ComplianceWalter Marinspecial
11/19/2025Tenant Protection Plan Compliance—special
10/21/2025Tenant Protection Plan Compliance—special
08/25/2025Tenant Protection Plan Compliance—special
06/25/2025Tenant Protection Plan Compliance—special
06/25/2025FinalOrah Weisbergprogress
06/25/2025HVAC-R and service water piping design and insulationOrah Weisbergenergy_progress
06/25/2025Mechanical SystemsOrah Weisbergspecial
06/25/2025HVAC-R and service water heating system controlsOrah Weisbergenergy_progress
06/25/2025Fire-Resistant Penetrations and JointsOrah Weisbergspecial
06/25/2025Maintenance informationOrah Weisbergenergy_progress
04/11/2025Mechanical SystemsAri Kamospecial
04/11/2025FinalAri Kamoprogress
04/11/2025Post-installed AnchorsAri Kamospecial
04/11/2025Fire-Resistant Penetrations and JointsAri Kamospecial
04/11/2025Maintenance informationAri Kamoenergy_progress
04/11/2025HVAC-R and service water heating equipmentAri Kamoenergy_progress
04/11/2025Tenant Protection Plan ComplianceAri Kamospecial
04/11/2025HVAC-R and service water heating system controlsAri Kamoenergy_progress
04/11/2025HVAC-R and service water piping design and insulationAri Kamoenergy_progress
04/11/2025Duct leakage testing, insulation and designAri Kamoenergy_progress
04/11/2025Shutoff dampersAri Kamoenergy_progress
04/11/2025Energy Code Compliance InspectionsAri Kamoprogress
03/24/2025HVAC-R and service water heating equipmentAri Kamoenergy_progress
03/24/2025Maintenance informationAri Kamoenergy_progress
Latest 25 of 60.
▾Documents — 559 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch37
09/06/2026M00099994-I1Request digital key ↗
08/29/2026M00901820-I1Request digital key ↗
08/29/2026M00900353-P1Request digital key ↗
Showing 3 of 37 on file for this type
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION43
10/20/2025122783504Open ↗
11/14/2022122783452Open ↗
11/24/2020123777724Open ↗
Showing 3 of 43 on file for this type
▸BISWORK PERMIT APPLICATION31
02/19/2020123818529Open ↗
01/03/2020123823639Open ↗
01/03/2020123823639Open ↗
Showing 3 of 31 on file for this type
▸Seals & Professional Certifications147
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION51
02/19/2020123818529Open ↗
12/24/2019123823639Open ↗
11/18/2019123777724Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/06/2026M00099994-I1Open ↗
08/29/2026M00900353-P1Open ↗
08/29/2026M00900353-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/06/2026M00944270-I1Open ↗
09/06/2026M00944270-I1Open ↗
09/05/2026M01170012-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/30/2026M00944418-I1Open ↗
09/06/2026M00944270-I1Open ↗
09/06/2026M00944270-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
02/12/2020123750011Open ↗
Showing 1 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
02/12/2020123750011Open ↗
Showing 1 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment15
▸BISEQUIPMENT USE PERMITS4
10/13/2021123777724Open ↗
01/24/2018122878083Open ↗
01/24/2018122878083Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
10/13/2021123777724Open ↗
01/24/2018122878083Open ↗
01/24/2018122878083Open ↗
▸BISSCHEDULE B - PLUMBING2
11/24/2020123777724Open ↗
Showing 1 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/28/2019123777724Open ↗
06/27/2019123823639Open ↗
▸BISSTANDPIPE SYSTEMS1
03/11/2021123823639Open ↗
▸BISSPRINKLER SYSTEMS1
03/11/2021123823639Open ↗
▸Safety & Tenant Protection13
▸BISTenant Protection Plan and Notes11
02/12/2020123750011Open ↗
09/27/2019123818529Open ↗
09/12/2019123818529Open ↗
Showing 3 of 11 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/22/2016122782382Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M00901820-I1Open ↗
▸Environmental & Asbestos81
▸DOB NOWDEP ACP-5: Asbestos Assessment Report30
08/29/2026M00900353-I1Open ↗
08/29/2026M00900353-P1Open ↗
08/28/2026M00944439-I1Open ↗
Showing 3 of 30 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)21
01/03/2020123823639Open ↗
11/21/2019123777724Open ↗
09/12/2019123818529Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWOER: Notice to Proceed13
08/13/2026M01158541-I1Open ↗
08/13/2026M01152369-I1Open ↗
08/13/2026M01158531-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction10
08/13/2026M01152369-I1Open ↗
08/13/2026M01158541-I1Open ↗
08/13/2026M00992934-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01061853-I1Open ↗
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
11/21/2019123777724Open ↗
11/18/2019123777724Open ↗
11/18/2019123777724Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
10/13/2021123777724Open ↗
01/12/2021123375052Open ↗
04/25/2018122782382Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/13/2021123777724Open ↗
01/12/2021123375052Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/07/2020123818529Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00900353-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
10/13/2021123777724Open ↗
10/13/2021123777724Open ↗
10/13/2021123777724Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs31
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
10/22/2021123777724Open ↗
09/16/2021123823639Open ↗
01/12/2021123375052Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/28/2026M00944439-I1Open ↗
08/28/2026M00992934-I1Open ↗
08/24/2026M00944270-I1Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/19/2020123818529Open ↗
02/12/2018122841513Open ↗
Showing 2 of 3 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT43
10/13/2021123777724Open ↗
10/13/2021123777724Open ↗
10/13/2021123777724Open ↗
Showing 3 of 43 on file for this type
▸BISWELDERS AFFIDAVIT1
10/13/2021123777724Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/07/2020123818529Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms55
▸BISADDITIONAL INFORMATION23
12/01/2020123777724Open ↗
12/01/2020123777724Open ↗
11/23/2020123823639Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING COVER SHEET22
02/12/2020123750011Open ↗
09/12/2019123818529Open ↗
07/01/2019123777724Open ↗
Showing 3 of 22 on file for this type
▸BISBOROUGH INTAKE FORM7
10/07/2019123777724Open ↗
04/25/2018122878092Open ↗
04/25/2018122782382Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/28/2019123777724Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWCalculations2
08/13/2026M01005263-I1Open ↗
08/13/2026M00997194-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01005263-I1Open ↗
08/13/2026M00997194-I1Open ↗
▸BISTax Abatement Miscellaneous1
06/27/2019123823639Open ↗
▸BISSupporting Document: Fee Exempt1
12/01/2020123777724Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
08/13/2026M00901820-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00966000-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01061853-I1Open ↗