← Back
Zoned commercial or Manhattan residential
LIVONIA AVENUE
BROOKLYN · Brownsville · BIN 3824415
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R7-2Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: NYC HOUSING PRESERVATION AND DEVELOPMENT · 40,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Filed — no permit issued54p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RADSON DEVELOPMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITYSCAPE ENGINEERING, PLLC309/18/2025
FRANK J QUATELA ARCHITECT P.C104/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC803/21/2026
Building Lifecycle
All (48)Filed (4)Objection (15)Special Inspection (29)
10/28/2025
Objection resolved — Resolved
10/14/2025
Objection raised — Structural
10/14/2025
Objection raised — Admin
10/14/2025
Objection raised — Structural
10/14/2025
Objection raised — Zoning
10/14/2025
Objection raised — Structural
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Structural
10/01/2025
Objection raised — Admin
09/18/2025
Filed — New Building
JOB WAS ACCEPTED TO THE HUB AT CONSULTATION ON 9/19/24. NEW 14-STORY MIXED-USE NEW BUILDING. WORK ON FLOORS CEL, 1-14, ROF.
B01173539-S1
09/18/2025
Filed — New Building
JOB WAS ACCEPTED TO THE HUB AT CONSULTATION ON 9/19/24. NEW 14-STORY MIXED-USE NEW BUILDING. WORK ON FLOORS CEL, 1-14, ROF.
B01173539-S3
09/18/2025
Filed — New Building
JOB WAS ACCEPTED TO THE HUB AT CONSULTATION ON 9/19/24. NEW 14-STORY MIXED-USE NEW BUILDING. WORK ON FLOORS CEL, 1-14, ROF.
B01173539-S2
09/09/2025
Special inspection requirement — Structural Steel - High Strength Bolting
09/09/2025
Special inspection requirement — Concrete – Prestressed
09/09/2025
Special inspection requirement — Post-installed Anchors
09/09/2025
Special inspection requirement — Concrete - Precast
09/09/2025
Special inspection requirement — Structural Steel - Welding
09/09/2025
Special inspection requirement — Concrete - Cast-In-Place
09/04/2025
Special inspection requirement — Structural Cold-Formed Steel
07/31/2025
Special inspection requirement — Structural Steel - Details
07/31/2025
Special inspection requirement — Final
07/31/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/31/2025
Special inspection requirement — Concrete - Cast-In-Place
07/31/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/31/2025
Special inspection requirement — Final
07/31/2025
Special inspection requirement — Footing and Foundation
07/31/2025
Special inspection requirement — Subgrade Inspections
07/31/2025
Special inspection requirement — Masonry
05/03/2025
Objection raised — Energy
05/03/2025
Objection raised — Admin
05/03/2025
Objection raised — Admin
05/03/2025
Objection raised — Admin
05/03/2025
Objection raised — Other
05/03/2025
Objection raised — Plumbing
04/17/2025
Filed — New Building
JOB WAS ACCEPTED TO THE HUB AT CONSULTATION ON 9/19/24. NEW 14-STORY MIXED-USE NEW BUILDING. WORK ON FLOORS CEL, 1-14, ROF.
B01173539-I1
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/07/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
04/07/2025
Special inspection requirement — Fenestration areas
04/07/2025
Special inspection requirement — Protection of exposed foundation insulation
04/07/2025
Special inspection requirement — Fenestration air leakage
04/07/2025
Special inspection requirement — Air barrier - visual inspection
04/07/2025
Special inspection requirement — Insulation placement and R values
04/07/2025
Special inspection requirement — Vestibules
04/07/2025
Special inspection requirement — Air barrier continuity plan testing
04/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nothing on file for this building.
1 project · most recent 09/18/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/18/2025——Gas, Storm, Water/Sanitary
1 project · most recent 09/18/2025
Steel Concrete Masonry
FiledStatusContractorScope
09/18/2025——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
09/09/2025Structural Steel - High Strength Bolting—special
09/09/2025Concrete – Prestressed—special
09/09/2025Post-installed Anchors—special
09/09/2025Concrete - Precast—special
09/09/2025Structural Steel - Welding—special
09/09/2025Concrete - Cast-In-Place—special
09/04/2025Structural Cold-Formed Steel—special
07/31/2025Structural Steel - Details—special
07/31/2025Final—progress
07/31/2025Subsurface Investigations (Borings/Test Pits)—special
07/31/2025Concrete - Cast-In-Place—special
07/31/2025Subsurface Conditions – Fill Placement & In-Place Density—special
07/31/2025Final—progress
07/31/2025Footing and Foundation—progress
07/31/2025Subgrade Inspections—special
07/31/2025Masonry—special
04/07/2025Structural Stability – Alterations of existing buildings—special
04/07/2025Fire-Resistant Penetrations and Joints—special
04/07/2025Wall Panels, Curtain Walls, and Veneers—special
04/07/2025Energy Code Compliance Inspections—progress
04/07/2025Fire-Resistance Rated Construction—progress
04/07/2025Fenestration areas—energy_progress
04/07/2025Protection of exposed foundation insulation—energy_progress
04/07/2025Fenestration air leakage—energy_progress
04/07/2025Air barrier - visual inspection—energy_progress
Latest 25 of 29.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026B01173539-S6Request digital key ↗
08/20/2026B01173539-S1Request digital key ↗
08/15/2026B01173539-S3Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01173539-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01173539-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01173539-S1Open ↗
08/20/2026B01173539-S2Open ↗
08/20/2026B01173539-S3Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/13/2026B01173539-S3Open ↗
08/13/2026B01173539-S4Open ↗
08/13/2026B01173539-S5Open ↗
Showing 3 of 9 on file for this type
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/13/2026B01173539-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01173539-I1Open ↗