← Back
Elevator cooperative
MAIN STREET
MANHATTAN · BIN 1083208
💬 Discuss this project
1975Year Built
18Stories
D4Building Class
R7-2Zoning
—Gross Floor Area
8,088Units
5 Open Violations ▸FISP: SAFE
Elevator cooperative · Owner of record: RIVERWALK 8 AFFORDABLE, L.P. · 1.13 FAR built
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof3p · 2 filings · 19 docs
Floor 111p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GRC MANAGEMENT507/08/2026
RELIABLE ENTERPRISES507/08/2026
GRC603/22/2026
STAR-CEL WATERPROOFING303/22/2026
URBAN DEVELOPMENT103/22/2026
HOUSING PRESERVATION AND103/22/2026
GRENADIER REALTY403/22/2026
HPD 806103/22/2026
COLGATE ENTERPRISE403/21/2026
ROOSEVELT ISLAND ASSOCIATES603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.707/08/2026
KZ ENGINEERING, P.C112/13/2023
ENTHINK ENGINEERS LLC105/09/2022
RYAN SOAMES ENGINEERING312/14/2021
EGA ARCHITECT, PLLC102/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIERARCH-E203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
JAM CONSULTANTS, INC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VALIANT DESIGN BUILD INCGeneral Contractor303/21/2026
CLIMATE SOLUTIONS INCGeneral Contractor303/21/2026
CS BRIDGE CORPGeneral Contractor203/21/2026
DARCI PLUMBING CO. INCGeneral Contractor204/09/2026
STAR-CEL WATERPROOFINGGeneral Contractor107/08/2026
DARCI PLUMBING CO INCPlumbing107/08/2026
GOTHAM WIRING LICENSEDElectrical103/22/2026
WYNNE PLBG & HEATING CORPPlumbing107/08/2026
PAUL OLSENElectrical103/21/2026
RICHARD NEUElectrical103/22/2026
RELIABLE ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808707/08/2026
BENAZZI ENGINEERING, PC5603212/14/2021
Building Lifecycle
All (133)Filed (14)Permit Issued (10)Signed Off (7)Facade (FISP) (16)Violation (60)Special Inspection (26)
08/26/2026
Signed off — Alteration
REPLACE EXISTING THREE DOMESTIC HOT WATER BOILERS AND STORAGE TANKS WITH THREE DOMESTIC HOT WATER HEATERS AND FIVE DOMESTIC HOT WATER STORAGE TANKS. CONNECT TO EXISTING GAS PIPING. CAP AND REMOVE BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01287932-I1
07/31/2026
Signed off — Alteration
REPLACE EXISTING THREE DOMESTIC HOT WATER BOILERS AND STORAGE TANKS WITH THREE DOMESTIC HOT WATER HEATERS AND FIVE DOMESTIC HOT WATER STORAGE TANKS. CONNECT TO EXISTING GAS PIPING. CAP AND REMOVE BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01287932-S1
07/08/2026
Filed — Alteration
REPLACE EXISTING THREE DOMESTIC HOT WATER BOILERS AND STORAGE TANKS WITH THREE DOMESTIC HOT WATER HEATERS AND FIVE DOMESTIC HOT WATER STORAGE TANKS. CONNECT TO EXISTING GAS PIPING. CAP AND REMOVE BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01287932-P1
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Bazini
06/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
06/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/04/2026
Violation issued (HPD, closed)
C
01/21/2026
Permit issued — Mechanical Systems
M01287932-S1-GC
01/21/2026
Permit issued — Mechanical Systems
M01287932-S1-MS
01/21/2026
Permit issued — Plumbing
M01287932-I1-PL
10/17/2025
Filed — Alteration
REPLACE EXISTING THREE DOMESTIC HOT WATER BOILERS AND STORAGE TANKS WITH THREE DOMESTIC HOT WATER HEATERS AND FIVE DOMESTIC HOT WATER STORAGE TANKS. CONNECT TO EXISTING GAS PIPING. CAP AND REMOVE BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01287932-I1
10/17/2025
Filed — Alteration
REPLACE EXISTING THREE DOMESTIC HOT WATER BOILERS AND STORAGE TANKS WITH THREE DOMESTIC HOT WATER HEATERS AND FIVE DOMESTIC HOT WATER STORAGE TANKS. CONNECT TO EXISTING GAS PIPING. CAP AND REMOVE BOILERS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01287932-S1
09/26/2025
Violation issued (HPD, closed)
C
09/26/2025
Violation issued (HPD, open)
B
09/26/2025
Violation issued (HPD, open)
B
09/22/2025
Violation issued (HPD, closed)
B
09/22/2025
Violation issued (HPD, closed)
C
09/22/2025
Violation issued (HPD, open)
B
09/22/2025
Violation issued (HPD, closed)
B
09/22/2025
Violation issued (HPD, open)
B
09/22/2025
Violation issued (HPD, open)
B
09/22/2025
Violation issued (HPD, closed)
B
09/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
09/16/2025
Special inspection requirement — Final
Joseph Bazini
09/16/2025
Special inspection requirement — Mechanical Systems
Joseph Bazini
09/16/2025
Special inspection requirement — Chimneys and vents
Joseph Bazini
06/12/2025
Violation issued (HPD, closed)
A
02/21/2025
Violation issued (HPD, closed)
C
02/04/2025
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00975352-I1
10/08/2024
Cycle 9 facade report submitted
10/08/2024
Cycle 9 facade report signed — SAFE
09/26/2024
Cycle 9 facade inspection completed
08/20/2024
Signed off — Alteration
Facade repairs. No change in use egress or occupancy.
M00457545-I1
06/24/2024
Signed off — Alteration
M00732397-I1
04/09/2024
Cycle 9 facade report signed — SWARMP
03/01/2024
Signed off — Alteration
REPLACE (10) TEN WASHERS AND (5) FIVE GAS DRYERS IN EXISTING TENANTS LAUNDROMAT AND INSTALL (1) ONE CATCH BASIN PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00192023-S1
02/09/2024
Permit issued — General Construction
M00457545-I1-GC
01/29/2024
Permit issued — Suspended Scaffold
M00973432-I1-SC
01/22/2024
Cycle 9 facade report submitted
12/21/2023
Cycle 9 facade inspection completed
12/18/2023
Filed — Alteration
M00973432-I1
12/13/2023
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00975352-I1
12/13/2023
Permit issued — Sidewalk Shed
M00975352-I1-SH
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/28/2023
Violation issued (HPD, closed)
B
04/28/2023
Violation issued (HPD, closed)
C
04/28/2023
Violation issued (HPD, closed)
B
05/09/2022
Filed — Alteration
M00732397-I1
05/09/2022
Permit issued — Sidewalk Shed
M00732397-I1-SH
05/03/2022
Violation issued (ECB, closed)
Construction
05/03/2022
Violation issued (ECB, closed)
Construction
03/08/2022
Violation issued (HPD, closed)
A
12/14/2021
Filed — Alteration
Filing for mechanical work related to lobby renovations. Removal and installation of duct work
M00358159-P1
12/13/2021
Special inspection requirement — Maintenance information
Gregory Benazzi
12/13/2021
Special inspection requirement — Final
Gregory Benazzi
12/13/2021
Special inspection requirement — Shutoff dampers
Gregory Benazzi
12/13/2021
Special inspection requirement — Energy Code Compliance Inspections
Gregory Benazzi
12/13/2021
Special inspection requirement — HVAC insulation and sealing
Gregory Benazzi
12/13/2021
Special inspection requirement — Mechanical Systems
Gregory Benazzi
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDARCI PLUMBING CO. INC01/21/2026
DOB NOWMechanical SystemsSigned-offDARCI PLUMBING CO. INC01/21/2026
DOB NOWPlumbingSigned-offDARCI PLUMBING CO INC01/21/2026
DOB NOWGeneral ConstructionSigned-offSTAR-CEL WATERPROOFING02/09/2024
DOB NOWSuspended ScaffoldPermit IssuedSTAR-CEL WATERPR&RESTR CO01/29/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP12/13/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC05/09/2022
DOB NOWMechanical SystemsPermit IssuedCLIMATE SOLUTIONS INC10/13/2021
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP08/14/2019
DOB NOWMechanical SystemsSigned-offVALIANT DESIGN BUILD INC08/05/2019
BISOTISSUEDJ.S. MAINTENANCE N.Y INC04/16/2021
BISOTISSUEDJ.S. MAINTENANCE N.Y INC06/26/2020
BISOTISSUEDVALIANT DESIGN BUILD INC07/15/2019
BISOTISSUEDANKO GENERAL CONTRACTING03/08/2016
BISOTISSUEDSTAR-CEL WATERPROOFING01/03/2014
BISOTISSUEDLEGACY BUILDERS/DEVELOPERS CORP12/20/2013
BISOTISSUEDSTAR-CEL WATERPROOFING06/18/2013
BISOTISSUEDSTAR-CEL WATERPROOFING05/24/2013
BISOTISSUEDSTAR-CEL WATERPROOFING04/11/2013
BISEQISSUEDCOLGATE ENTERPRISE CORP03/29/2013
BISEQISSUEDCS BRIDGE CORP03/27/2013
BISEQISSUEDCOLGATE ENTERPRISE CORP01/17/2013
BISOTISSUEDSTAR-CEL WATERPROOFING12/31/2012
BISOTISSUEDSTAR-CEL WATERPROOFING06/25/2012
BISEQISSUEDCS BRIDGE CORP04/26/2012
BISEQISSUEDSTAR-CEL WATERPROOFING12/29/2010
BISEQISSUEDSTAR-CEL WATERPROOFING12/16/2010
BISPLISSUEDNEW YORK PLBG-HTG-COOLING07/09/2001
BISBLISSUEDNEW YORK PLBG-HTG-COOLING07/09/2001
1 project · most recent 12/14/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/14/2021Permit IssuedCLIMATE SOLUTIONS INCAir Conditioning Systems
Cooling
Lg ARNU243M2A4 670 CFM · Vrf Indoor ×1
ARNU363M2A4 1,050 CFM · Vrf Indoor ×1
ARUN060GSS4 5,200 BTU · Vrf Outdoor ×1
2 projects · most recent 07/08/2026
Water/Sanitary Gas Plumbing-Sprinkler
FiledStatusContractorScope
07/08/2026Signed-offDARCI PLUMBING CO INCGas, Water/Sanitary
07/27/2020——Plumbing-Sprinkler, Water/Sanitary
4 projects · most recent 12/13/2023
General Wiring
FiledStatusContractorScope
12/13/2023CompleteNASH ELECTRIC SERVICES IN—
05/11/2022Permit IssuedRICHARD NEU—
12/22/2021CompleteGOTHAM WIRING LICENSEDGeneral Wiring
06/08/2020Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
06/15/2026Energy Code Compliance InspectionsJoseph Baziniprogress
06/15/2026HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
06/15/2026Fire-Resistant Penetrations and JointsJoseph Bazinispecial
06/15/2026Tenant Protection Plan Compliance—special
09/16/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
09/16/2025FinalJoseph Baziniprogress
09/16/2025Mechanical SystemsJoseph Bazinispecial
09/16/2025Chimneys and ventsJoseph Bazinispecial
12/13/2021Maintenance informationGregory Benazzienergy_progress
12/13/2021FinalGregory Benazziprogress
12/13/2021Shutoff dampersGregory Benazzienergy_progress
12/13/2021Energy Code Compliance InspectionsGregory Benazziprogress
12/13/2021HVAC insulation and sealing Gregory Benazzienergy_progress
12/13/2021Mechanical SystemsGregory Benazzispecial
01/20/2021FinalEDWARD AGNOLIprogress
02/12/2020Fire-Resistant Penetrations and JointsJoseph Bazinispecial
02/12/2020Energy Code Compliance InspectionsJoseph Baziniprogress
01/23/2020Energy Code Compliance InspectionsJoseph Baziniprogress
01/23/2020Fire-Resistant Penetrations and JointsJoseph Bazinispecial
11/26/2019Fire-Resistant Penetrations and JointsJoseph Bazinispecial
11/26/2019Energy Code Compliance InspectionsJoseph Baziniprogress
07/22/2019Maintenance informationJoseph Bazinienergy_progress
07/22/2019HVAC insulation and sealing Joseph Bazinienergy_progress
07/22/2019Fire-Resistant Penetrations and JointsJoseph Bazinispecial
07/11/2019FinalJoseph Baziniprogress
Latest 25 of 26.
▾Documents — 249 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch7
09/02/2026M00732397-I1Request digital key ↗
08/28/2026M00975352-I1Request digital key ↗
08/28/2026M00973432-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00192023-S1Request digital key ↗
09/04/2026M00358178-I1Request digital key ↗
08/15/2026M00192023-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00192023-I1Request digital key ↗
09/03/2026M00358159-I1Request digital key ↗
09/03/2026M00358159-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00457545-I1Request digital key ↗
▸Applications & Permits34
▸BISWORK PERMIT APPLICATION17
04/16/2021140907124Open ↗
06/26/2020140907124Open ↗
07/12/2019140859710Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
01/11/2021140907124Open ↗
01/05/2021140907124Open ↗
06/08/2020140907124Open ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE DESIGN CERTIFICATION2
06/08/2020140907124Open ↗
07/12/2019140859710Open ↗
▸Seals & Professional Certifications65
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
11/01/2016122675177Open ↗
03/18/2016122675177Open ↗
05/30/2014121499921Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/29/2026M00457545-I1Open ↗
09/01/2026M00192023-P2Open ↗
09/01/2026M00192023-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/04/2026M00358178-I1Open ↗
09/03/2026M00358159-I1Open ↗
09/03/2026M00358159-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M00192023-P2Open ↗
09/01/2026M00192023-I1Open ↗
09/01/2026M00192023-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
03/18/2016122675177Open ↗
01/22/2013121499921Open ↗
05/02/2012121056873Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/08/2020140907124Open ↗
07/12/2019140859710Open ↗
03/18/2016122675177Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/22/2013121499921Open ↗
05/02/2012121056873Open ↗
12/21/2010120559378Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/08/2020140907124Open ↗
07/12/2019140859710Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/08/2020140907124Open ↗
07/12/2019140859710Open ↗
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan7
09/04/2026M00358178-I1Open ↗
09/03/2026M00358159-I1Open ↗
09/03/2026M00358159-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
01/11/2021140907124Open ↗
07/12/2019140859710Open ↗
03/18/2016122675177Open ↗
▸BISSTREET TREE CHECKLIST1
09/10/2013121766240Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026M01287932-P1Open ↗
08/21/2026M01287932-S1Open ↗
08/21/2026M01287932-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
07/12/2019140859710Open ↗
03/18/2016122675177Open ↗
09/10/2013121766240Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/15/2012121007864Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
09/16/2021140907124Open ↗
07/18/2020140859710Open ↗
06/26/2020140907124Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/01/2016122675177Open ↗
03/18/2016122675177Open ↗
03/24/2014121007864Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
07/18/2020140859710Open ↗
11/01/2016122675177Open ↗
03/24/2014121007864Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/08/2020140907124Open ↗
07/12/2019140859710Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/01/2014121766240Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/16/2021140907124Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/15/2012121007864Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
09/16/2021140907124Open ↗
07/18/2020140859710Open ↗
06/26/2020140907124Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs50
▸BISLETTERS - SUPPORTING DOCUMENTATION18
05/30/2014121499921Open ↗
03/17/2014121056873Open ↗
03/17/2014121056873Open ↗
Showing 3 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/16/2021140907124Open ↗
04/30/2020140859710Open ↗
10/20/2016122675177Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/04/2026M00358178-I1Open ↗
09/03/2026M00358159-I1Open ↗
09/03/2026M00358159-P1Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
01/22/2013121499921Open ↗
05/02/2012121056873Open ↗
03/15/2012121007864Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS3
05/31/2013121007864Open ↗
04/02/2013121499921Open ↗
04/01/2013121056873Open ↗
▸BISLANDMARKS APPROVAL3
03/18/2016122675177Open ↗
05/01/2014121766240Open ↗
04/12/2012121007864Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
09/04/2026M00358178-I1Open ↗
09/03/2026M00358159-I1Open ↗
09/03/2026M00358159-P1Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
06/08/2020140907124Open ↗
07/12/2019140859710Open ↗
▸BISCCD1-Construction Code Determination2
08/23/2013121007864Open ↗
07/12/2013121007864Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
09/16/2021140907124Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT9
07/18/2020140859710Open ↗
06/08/2020140907124Open ↗
07/12/2019140859710Open ↗
Showing 3 of 9 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
04/16/2021140907124Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/16/2021140907124Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION7
06/14/2013121007864Open ↗
11/13/2012121007864Open ↗
09/17/2012121056873Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET6
03/18/2016122675177Open ↗
09/10/2013121766240Open ↗
01/22/2013121499921Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/08/2020140907124Open ↗
07/12/2019140859710Open ↗
▸BISBOROUGH INTAKE FORM1
04/16/2021140907124Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/05/2013121766240Open ↗
01/07/2011120559378Open ↗
▸DOB NOWManufacturer's Specifications2
08/28/2026M00973432-I1Open ↗
08/13/2026M00973432-P1Open ↗
▸DOB NOWCalculations2
08/28/2026M00973432-I1Open ↗
08/13/2026M00973432-P1Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
06/08/2020140907124Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
06/08/2020140907124Open ↗