← Back
Gas or electric utility
MERRICK BOULEVARD
QUEENS · BIN 4594611
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
7 Open Violations 5 unresolved · 2 paperwork only ▸FDNY Report ↗
Gas or electric utility · Owner of record: BROOKLYN UNION GAS COMPANY · 127,346 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction32p · 6 filings · 20 docs
Floor 1Under Construction38p · 9 filings · 20 docs
Mezzanine2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NATIONAL GRID4109/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA DESIGN GROUP803/21/2026
TOWER CONSULTING ENGINEERS503/21/2026
JAM CONSULTANTS, INC.1003/21/2026
A1 EXPEDITING SERVICE CORP.203/21/2026
BURNHAM NATIONWIDE INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MATCO SERVICE CORPGeneral Contractor403/21/2026
CLUNE CONSTRUCTION CO LPGeneral Contractor408/16/2026
PAR PLUMBING CO., INCPlumbing307/08/2026
R.W. DAKE & CO.,INCGeneral Contractor304/09/2026
ABCO-PEERLESS SPRKLR CORPFire Protection207/08/2026
CROSS CHECK MECH. CORPPlumbing206/28/2026
JAMES E FITZGERALD INCGeneral Contractor208/14/2026
H.M. HUGHES CO. INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TOWER CONSULTING ENGINEER7310107/09/2026
GOLDMAN COPELAND ASSOCIAT2826303/09/2026
ALL CITY ENGINEERING PC7115512/11/2025
AK ENGINEERING PC678410/28/2025
CROSSCHECK INSPECTION SER544204/28/2022
Building Lifecycle
All (213)Filed (31)Permit Issued (19)Signed Off (5)Violation (46)Inspection (17)Objection (65)Special Inspection (30)
08/14/2026
Permit issued — General Construction
Q01331579-I1-GC
08/13/2026
Permit issued — General Construction
Q01360798-I1-GC
08/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/12/2026
Objection raised — Other
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/12/2026
Objection resolved — Resolved
08/04/2026
Objection raised — Other
08/03/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/28/2026
Objection resolved — Addressed
07/28/2026
Objection resolved — Addressed
07/22/2026
Objection resolved — Addressed
07/09/2026
Filed — Alteration
Q01360798-I1
07/08/2026
Objection resolved — Addressed
07/08/2026
Objection resolved — Addressed
06/25/2026
Special inspection requirement — Post-installed Anchors
HAMZA MURTAZA
06/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/14/2026
Special inspection requirement — Maintenance information
05/13/2026
Objection resolved — Addressed
05/13/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/06/2026
Permit issued — General Construction
Q01265396-I1-GC
05/06/2026
Special inspection requirement — Sprinkler Systems
DANIEL COLOMBINI
05/05/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/29/2026
Permit issued — Sprinklers
Q01157571-I1-EW-SP
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
04/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2026
Objection raised — Other
04/21/2026
Filed — New Building
new curb cut
Q01327543-Z1
04/21/2026
Filed — New Building
new curb cut
Q01327543-S9
04/21/2026
Objection raised — Admin
04/21/2026
Objection raised — Admin
04/21/2026
Objection raised — Admin
04/15/2026
Objection raised — Admin
04/15/2026
Objection raised — Plumbing
04/15/2026
Objection raised — Admin
04/15/2026
Objection raised — Admin
04/15/2026
Objection raised — Scope
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/14/2026
Objection raised — Other
04/14/2026
Objection raised — Plumbing
04/14/2026
Objection raised — Admin
04/14/2026
Objection raised — Plumbing
04/14/2026
Special inspection requirement — Final
Robert Pompo
04/13/2026
Filed — Alteration
GENERAL CONSTRUCTION FOR THE INSTALLATION OF EV CHARGING STATIONS, INCLUDING CONDUIT RUNS, FOUNDATIONS, BOLLARDS, AND ASSOCIATED SITE WORK, AS PER DRAWINGS FILED HEREWITH.
Q01331579-P1
04/10/2026
Special inspection requirement — Final
Robert Pompo
04/01/2026
Filed — New Building
new curb cut
Q01327543-S6
04/01/2026
Special inspection requirement — Vestibules
04/01/2026
Special inspection requirement — Protection of exposed foundation insulation
04/01/2026
Special inspection requirement — Air barrier continuity plan testing
04/01/2026
Special inspection requirement — Air barrier — testing
Latest 60 of 213 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCLUNE CONSTRUCTION CO LP08/14/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC08/13/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC05/06/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP04/29/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC03/12/2026
DOB NOWGeneral ConstructionPermit IssuedR.W. DAKE & CO.,INC03/11/2026
DOB NOWStructuralPermit IssuedR.W. DAKE & CO.,INC03/11/2026
DOB NOWMechanical SystemsPermit IssuedR.W. DAKE & CO.,INC03/11/2026
DOB NOWBoiler EquipmentPermit IssuedCROSS CHECK MECH. CORP03/10/2026
DOB NOWGeneral ConstructionPermit IssuedCLUNE CONSTRUCTION CO LP02/03/2026
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC10/29/2025
DOB NOWBoiler EquipmentPermit IssuedCROSS CHECK MECH. CORP10/14/2025
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP05/13/2025
DOB NOWPlumbingSigned-offPAR PLUMBING CO., INC07/28/2022
DOB NOWMechanical SystemsSigned-offCLUNE CONSTRUCTION CO LP06/09/2022
DOB NOWGeneral ConstructionSigned-offCLUNE CONSTRUCTION CO LP04/01/2022
DOB NOWGeneral ConstructionSigned-offHM HUGHES CO INC02/16/2022
DOB NOWMechanical SystemsPermit IssuedMATCO SERVICE CORP09/10/2021
DOB NOWMechanical SystemsSigned-offMATCO SERVICE CORP04/23/2021
BISMHISSUEDSJS CONSTRUCTION CO., INC.08/01/2017
BIS—ISSUEDGOING SIGN & SVCNG CO,INC12/22/2008
BISPLISSUEDJOHNNY'S P&H CONTRAC INC03/05/2007
BISOTISSUEDKEYSPAN CORPORATION02/20/2007
BISOTISSUEDLARRY E.TYREE , INC11/22/1996
BISPLISSUEDBRENNAN BROTHERS CO INC11/16/1994
BISFPISSUEDSAFETY CONSULTANT INC10/27/1994
BISOTISSUEDS. DIGIACOMO & SON03/22/1994
BISPLISSUEDMOST PLUMBING AND HEATING CORP.01/31/1994
BISOTISSUEDVACHERON HORIZON CORP04/24/1992
BIS—ISSUEDINGRAM & GREENE INC02/06/1992
BIS—ISSUEDVACHERON HORIZON CORP11/26/1990
3 projects · most recent 04/21/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/21/2026——Heating and Air Conditioning Systems
Heat / Cool
03/09/2026——Ventilation Systems—
08/27/2021Permit IssuedMATCO SERVICE CORPAir Conditioning Systems, Heating Systems—
1 project · most recent 01/28/2026
FiledStatusContractorScope
01/28/2026Permit IssuedABCO-PEERLESS SPRKLR CORP384 heads
3 projects · most recent 04/21/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
04/21/2026——Gas, Storm, Water/Sanitary
10/28/2025Permit IssuedPAR PLUMBING CO., INCGas, Water/Sanitary
11/03/2021——Gas
3 projects · most recent 04/24/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
04/24/2026Permit IssuedSRM ELECTRICAL SVC INCHVAC Wiring
04/02/2026Permit IssuedC.M. RICHEY ELEC'L CONTRGeneral Wiring
03/27/2025CompleteSCHLESINGER ELECT'L CONTRGeneral Wiring
1 project · most recent 04/21/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/21/2026——Steel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
08/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/03/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2026Fail-Final Boiler Equipment InspectionFailView ↗
03/04/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
12/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/26/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/26/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/23/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2022Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
06/25/2026Post-installed AnchorsHAMZA MURTAZAspecial
05/22/2026Structural Stability – Alterations of existing buildings—special
05/18/2026Structural Stability – Alterations of existing buildings—special
05/14/2026Maintenance information—energy_progress
05/06/2026Sprinkler SystemsDANIEL COLOMBINIspecial
05/05/2026Duct leakage testing, insulation and design—energy_progress
04/24/2026Energy Code Compliance Inspections—progress
04/14/2026FinalRobert Pompoprogress
04/10/2026FinalRobert Pompoprogress
04/01/2026Air barrier — testing —energy_progress
04/01/2026Air barrier continuity plan testing—energy_progress
04/01/2026Vestibules—energy_progress
04/01/2026Protection of exposed foundation insulation—energy_progress
04/01/2026Post-installed Anchors—special
04/01/2026Structural Cold-Formed Steel—special
03/26/2026Air barrier - visual inspection—energy_progress
03/26/2026Fenestration areas—energy_progress
03/26/2026Fenestration and door U-factor and product ratings—energy_progress
03/26/2026Fenestration air leakage—energy_progress
03/26/2026Insulation placement and R values—energy_progress
03/25/2026HVAC-R and service water heating system controls—energy_progress
03/25/2026HVAC-R and service water heating equipment—energy_progress
03/25/2026HVAC-R and service water piping design and insulation—energy_progress
03/25/2026Fire-Resistant Penetrations and Joints—special
03/25/2026Maintenance information—energy_progress
Latest 25 of 76.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
nationalgridEducation—
Project Q01157571 Alteration · Permit Entire · 01/23/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 177 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch30
08/27/2026Q00576605-I1Request digital key ↗
08/27/2026Q00591980-I1Request digital key ↗
08/26/2026Q00672016-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00465069-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION8
02/04/2021440526575Open ↗
01/29/2021440526575Open ↗
01/15/2021410205629Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION2
08/03/2017421528154Open ↗
12/22/2008410205629Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/17/2026Q01327543-I1Open ↗
08/13/2026Q01327543-I1Open ↗
▸Seals & Professional Certifications68
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/26/2026Q00672025-I1Open ↗
08/18/2026Q01285431-I1Open ↗
08/18/2026Q01285431-S1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026Q00603685-I1Open ↗
09/02/2026Q01331579-I1Open ↗
09/01/2026Q01285431-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026Q00603685-I1Open ↗
09/01/2026Q01285431-I1Open ↗
08/30/2026Q01157571-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
07/24/2017421528154Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/24/2019440526575Open ↗
07/24/2017421528154Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/24/2017421528154Open ↗
12/15/2008410205629Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/24/2019440526575Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/15/2008410205629Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/24/2019440526575Open ↗
▸Trade Schedules & Equipment16
▸BISEQUIPMENT USE PERMITS13
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
Showing 3 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/17/2026Q01327543-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/18/2026Q00603685-S1Open ↗
08/18/2026Q00603685-I1Open ↗
08/17/2026Q01157571-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/26/2026Q00672025-I1Open ↗
08/18/2026Q01285431-S1Open ↗
08/18/2026Q01285431-S3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/15/2008410205629Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/14/2018421528154Open ↗
03/14/2018421528154Open ↗
07/24/2017421528154Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/14/2018421528154Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00465069-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/27/2021440526575Open ↗
02/01/2021410205629Open ↗
01/24/2019440526575Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/01/2022440526575Open ↗
▸BISSOIL REPORT1
01/24/2019440526575Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/01/2021410205629Open ↗
03/14/2018421528154Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/15/2008410205629Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q00591980-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
02/01/2021410205629Open ↗
01/24/2019440526575Open ↗
03/14/2018421528154Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET2
07/24/2017421528154Open ↗
12/15/2008410205629Open ↗
▸BISADDITIONAL INFORMATION2
02/04/2021440526575Open ↗
01/15/2021410205629Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/24/2019440526575Open ↗
▸BISBOROUGH INTAKE FORM1
03/14/2018421528154Open ↗
▸Other Documents7
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026Q01327543-I1Open ↗
08/17/2026Q01327543-S8Open ↗
08/17/2026Q01327543-S6Open ↗
▸DOB NOWSite Survey: Initial3
08/17/2026Q01327543-S8Open ↗
08/17/2026Q01327543-S6Open ↗
08/13/2026Q01327543-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01327543-I1Open ↗