| Owner | Filings | Most Recent |
|---|---|---|
| DOUGLAS ELLIMAN PROPERTY MANAGEMENT | 2 | 09/13/2026 |
| GREENWICH TOWER OWNERS | 30 | 07/08/2026 |
| 1 LEX AVE CP | 7 | 03/22/2026 |
| 1 LEX AVE CP % INSIGNIA/5 | 2 | 03/22/2026 |
| 1 LEX AVE CP & INSIGNA | 2 | 03/22/2026 |
| 1 LEXIGNTON C/P INSIGNIA | 1 | 03/22/2026 |
| DELUC | 1 | 03/22/2026 |
| INSIGINIA RESIDENTIAL GROUP | 6 | 03/21/2026 |
| 1 LEXINGTON AVENUE | 13 | 03/21/2026 |
| SELECT EQUITY GROUP | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| P.A. COLLINS PE | 14 | 06/24/2026 |
| PINO PAVESE | 2 | 06/23/2026 |
| B SPACE, LLC | 1 | 04/22/2026 |
| BFB ARCHITECT, PC | 2 | 01/07/2026 |
| AMMOR ARCHITECTURE LLP | 2 | 09/05/2025 |
| CHARLES G. MICHEL ENGINEERING, PC. | 4 | 09/03/2025 |
| SARAH GORDON DRAKE ARCHITECT, LLC | 2 | 02/03/2025 |
| ERIC SHEFFIELD ARCHITECT | 1 | 12/13/2024 |
| PIRO STUDIO LLC | 1 | 06/09/2024 |
| WALTER B. MELVIN ARCHITECTS, LLC | 2 | 04/22/2024 |
| D'HUY ENGINEERING, INC. | 2 | 04/03/2024 |
| KZ ENGINEERING, P.C | 6 | 11/01/2023 |
| RICHARD GONZALEZ ARCHITECT PLLC | 2 | 02/14/2023 |
| JACK GREEN ASSOCIATES | 1 | 02/14/2023 |
| OFFICE OF COLLABORATIVE ARCHITECTUR | 2 | 06/13/2022 |
| COLLECTIF ENGINEERING PLLC | 2 | 11/17/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| BOYD CONSULTING | 4 | 03/21/2026 |
| AZAR ASSOCIATES | 4 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 4 | 03/21/2026 |
| JM ZONING, LLC. | 12 | 03/21/2026 |
| DOMANI CONSULTING | 6 | 03/21/2026 |
| NOEL BUILDING CONSULTING INC | 6 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 6 | 03/21/2026 |
| CODE | 6 | 03/21/2026 |
| METROPOLIS GROUP INC | 8 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 3 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| IA CONSTRUCTION MGMT, INC | General Contractor | 14 | 09/09/2026 |
| WEST NEW YORK RESTORATION OF CT | General Contractor | 11 | 07/08/2026 |
| GMG CARPENTRY INC | General Contractor | 6 | 07/08/2026 |
| LINDEN MARSHALL CONTRACTING INC | General Contractor | 6 | 03/21/2026 |
| UBERTO, LTD | General Contractor | 5 | 07/08/2026 |
| FEB GENERAL CONTRACTOR CO | General Contractor | 4 | 03/21/2026 |
| V C S MECHANICAL INC | General Contractor | 4 | 07/08/2026 |
| PETER BISHUN | Electrical | 3 | 03/21/2026 |
| ASPECT PLBNG&HTNG CO LLC | Plumbing | 2 | 07/08/2026 |
| ORBIT PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Plumbing | 2 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 2 | 03/21/2026 |
| PAC ELECTRIC CORP. | Electrical | 1 | 03/22/2026 |
| POWER SURGE ELECTRIC, INC | Electrical | 1 | 03/22/2026 |
| RICHARD WEHNER | Electrical | 1 | 03/21/2026 |
| WILFRED JEFFREY | Electrical | 1 | 03/21/2026 |
| CATALYST DEVELOPMENT GROUP | General Contractor | 1 | 07/08/2026 |
| DEGA CONSTRUCTION CORP | General Contractor | 1 | 04/09/2026 |
| LIQUID 12 INTERIORS INC | General Contractor | 1 | 07/08/2026 |
| POLAR MECHANICAL CORP | General Contractor | 1 | 04/09/2026 |
| ARCON PLBG SOLUTIONS | Plumbing | 1 | 07/08/2026 |
| BUDGET PLBG & HTG LLC | Plumbing | 1 | 07/08/2026 |
| R.J.C. MECHANICAL CORP | Plumbing | 1 | 07/08/2026 |
| APOLLO ELECTRIC NYG, INC | Electrical | 1 | 03/22/2026 |
| TRI STATE PLBG & HTG INC | Plumbing | 1 | 09/23/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| P.A.COLLINS INSPECTIONS P | 2168 | 16 | 06/24/2026 |
| B SPACE, LLC | 8036 | 1 | 04/22/2026 |
| CROSSCHECK INSPECTION SER | 544 | 2 | 09/05/2025 |
| AMMOR ARCHITECTURE LLP | 3054 | 4 | 09/05/2025 |
| CHARLES G MICHEL ENGINEER | 2871 | 2 | 09/03/2025 |
| CHANG PARK ARCH. P.C. | 663 | 1 | 08/27/2025 |
| SARAH GORDON DRAKE ARCHIT | 4744 | 2 | 02/03/2025 |
| ERIC SHEFFIELD ARCHITECT | 2195 | 1 | 12/13/2024 |
| PIRO STUDIO LLC | 7503 | 1 | 06/09/2024 |
| SKYLINE ENGINEERING, PLLC | 267 | 2 | 04/03/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | TRI STATE PLBG & HTG INC | 09/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | IA CONSTRUCTION MGMT, INC | 09/08/2026 |
| DOB NOW | General Construction | Permit Issued | CATALYST DEVELOPMENT GROUP | 06/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | GMG CARPENTRY INC | 06/02/2026 |
| DOB NOW | General Construction | Permit Issued | GMG CARPENTRY INC | 05/26/2026 |
| DOB NOW | General Construction | Permit Issued | GMG CARPENTRY INC | 05/22/2026 |
| DOB NOW | General Construction | Permit Issued | GMG CARPENTRY INC | 03/24/2026 |
| DOB NOW | General Construction | Permit Issued | GMG CARPENTRY INC | 03/24/2026 |
| DOB NOW | Plumbing | Permit Issued | R.J.C. MECHANICAL CORP | 11/13/2025 |
| DOB NOW | General Construction | Permit Issued | GMG CARPENTRY INC | 11/06/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | IA CONSTRUCTION MGMT, INC | 09/10/2025 |
| DOB NOW | General Construction | Signed-off | DEGA CONSTRUCTION CORP | 07/29/2025 |
| DOB NOW | Mechanical Systems | Signed-off | V C S MECHANICAL INC | 07/03/2025 |
| DOB NOW | Plumbing | Signed-off | ARCON PLBG SOLUTIONS | 06/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | POLAR MECHANICAL CORP | 06/09/2025 |
| DOB NOW | General Construction | Signed-off | LIQUID 12 INTERIORS INC | 06/06/2025 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 02/20/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | IA CONSTRUCTION MGMT, INC | 10/23/2024 |
| DOB NOW | Structural | Signed-off | IA CONSTRUCTION MGMT, INC | 10/22/2024 |
| DOB NOW | Mechanical Systems | Signed-off | V C S MECHANICAL INC | 07/17/2024 |
| DOB NOW | Supported Scaffold | Signed-off | A. PETER LUGER CONST INC | 03/11/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | A. PETER LUGER CONST INC | 03/04/2024 |
| DOB NOW | Plumbing | Signed-off | ORBIT PLBG & HTG INC | 02/29/2024 |
| DOB NOW | General Construction | Permit Issued | UBERTO, LTD | 02/22/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | UBERTO, LTD | 02/22/2024 |
| DOB NOW | Structural | Signed-off | IA CONSTRUCTION MGMT, INC | 10/23/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | IA CONSTRUCTION MGMT, INC | 10/23/2023 |
| DOB NOW | Plumbing | Signed-off | ASPECT PLBNG&HTNG CO LLC | 10/12/2023 |
| DOB NOW | General Construction | Signed-off | A. PETER LUGER CONST INC | 10/02/2023 |
| DOB NOW | Plumbing | Signed-off | ASPECT PLBNG&HTNG CO LLC | 05/02/2023 |
| DOB NOW | Mechanical Systems | Signed-off | FEB GENERAL CONTRACTOR | 04/28/2023 |
| DOB NOW | General Construction | Signed-off | FEB GENERAL CONTRACTOR | 04/28/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | A. PETER LUGER CONST INC | 04/27/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | A. PETER LUGER CONST INC | 03/14/2023 |
| DOB NOW | Supported Scaffold | Signed-off | A. PETER LUGER CONST INC | 03/10/2023 |
| DOB NOW | Supported Scaffold | Signed-off | ARSENAL SCAFFOLD INC | 12/28/2022 |
| DOB NOW | General Construction | Permit Issued | LINDEN MARSHALL CONTRACTI | 12/09/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | IA CONSTRUCTION MGMT, INC | 11/02/2022 |
| DOB NOW | Structural | Signed-off | IA CONSTRUCTION MGMT, INC | 11/02/2022 |
| DOB NOW | General Construction | Signed-off | A. PETER LUGER CONST INC | 10/05/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/24/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MXZ-SM48NL 48,000 BTU · Condensing Unit ×2 PEFY-M08NMSU-A 8,000 BTU · Vrf Indoor ×2 PEFY-M12NMSU-A 12,000 BTU · Vrf Indoor ×1 PEFY-M18NMSU-A 18,000 BTU · Vrf Indoor ×1 PEFY-M24NMAU-A 24,000 BTU · Vrf Indoor ×1 PEFY-M36NMAU-A 36,000 BTU · Vrf Indoor ×1 |
| 04/22/2026 | Permit Issued | CATALYST DEVELOPMENT GROU | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MFZ-KX09NL 9,000 BTU · Ahu ×2 MFZ-KX12NL 12,000 BTU · Ahu ×1 MXZ-SM48NL 50,000 BTU · Condensing Unit ×1 PEAD-AA12NL 12,000 BTU · Vrf Indoor ×1 PEAD-AA15NL 15,000 BTU · Ahu ×1 |
| 08/27/2025 | Permit Issued | GMG CARPENTRY INC | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MXZ-SM48NL 48,000 BTU · Vrf Outdoor ×8 PEFY-L27NMAU-A 27,000 BTU · Vrf Indoor ×4 PVFY-L24NAMU-A 24,000 BTU · Vrf Indoor ×4 PVFY-L48NAMU-A 48,000 BTU · Vrf Indoor ×4 |
| 02/04/2025 | Permit Issued | UBERTO, LTD | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric Med Static PEFY-P12NMAU-E4 371 BTU · Vrf Indoor ×2 Med Status PEFY-P06NMAU-E4 300 CFM · Vrf Indoor ×2 Med Status PEFY-P12NMAU-E4 371 CFM · Vrf Indoor ×2 Med Status PEFY-P18NMAU-Ef 600 CFM · Vrf Indoor ×2 Med Status PEFY-P24NMAU-E4 883 CFM · Vrf Indoor ×2 floor mounted - exposed PFFY-P24NEMU-E 494 CFM · Vrf Indoor ×2 Ventilation Mitsubishi Electric Mitsubishi MXZ0SM48NAM2-U1 3,885 CFM · Split System ×4 |
| 11/17/2021 | — | — | Air Conditioning Systems | Cooling — PVFY-P18NAMU-E1 18,000 BTU · Fan Coil Indoor ×2 PUMY-P60NKMU3 60,000 BTU · Rooftop Unit ×1 PVFY-P36NAMU-E1 36,000 BTU · Fan Coil Indoor ×1 |
| 05/28/2020 | Permit Issued | UBERTO, LTD | Air Conditioning Systems, Associated Ducts and Piping | Cooling Mitsubishi Electric PUMY-P36NKMU3 36,000 BTU · Vrf Outdoor ×1 PUMY-P48NKMU3 48,000 BTU · Vrf Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/24/2026 | — | — | Gas, Water/Sanitary |
| 04/22/2026 | Permit Issued | TRI STATE PLBG & HTG INC | Water/Sanitary |
| 09/05/2025 | Signed-off | ARCON PLBG SOLUTIONS | Water/Sanitary |
| 08/27/2025 | Permit Issued | R.J.C. MECHANICAL CORP | Gas, Water/Sanitary |
| 02/04/2025 | Signed-off | ORBIT PLBG & HTG INC | Gas, Water/Sanitary |
| 11/17/2021 | Permit Issued | BUDGET PLBG & HTG LLC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/08/2026 | Complete | BASS ELECTRICAL CORP. | General Wiring |
| 12/15/2025 | Complete | PAC ELECTRIC CORP. | HVAC Wiring |
| 09/17/2025 | Complete | ARREE ELECTRIC CORP | General Wiring |
| 09/26/2024 | Complete | BASS ELECTRICAL CORP. | General Wiring |
| 05/07/2024 | Permit Issued | OMD ELECTRICAL CORP | 1 meters, 1 new_meters |
| 01/27/2024 | Complete | POWER SURGE ELECTRIC, INC | General Wiring |
| 01/08/2024 | Complete | TEAM ELECTRIC, INC | General Wiring |
| 12/12/2023 | Permit Issued | ASSET ELECTRIC CORP | General Wiring |
| 04/24/2023 | Complete | ETECH ELECTRICAL LLC | General Wiring |
| 09/21/2022 | Complete | APOLLO ELECTRIC INC. | General Wiring |
| 04/05/2022 | Complete | NASH ELECTRIC SERVICES IN | — |
| 02/03/2022 | Complete | POWER SURGE ELECTRIC, INC | General Wiring |
| 10/15/2021 | Complete | APOLLO ELECTRIC NYG, INC | General Wiring |
| 08/14/2020 | Complete | EINSTEIN ELEC'L CORP | General Wiring |
| 06/19/2018 | Complete | WMS ELECTRICAL CONTNG LTD | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/01/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/01/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/10/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 12/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/05/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/13/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/08/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/05/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/05/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/14/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/07/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/01/2023 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 05/18/2022 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/18/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/12/2022 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/23/2026 | Energy Code Compliance Inspections | Paul Collins | progress |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/16/2026 | Fire-Resistance Rated Construction | — | progress |
| 06/16/2026 | Post-installed Anchors | — | special |
| 06/16/2026 | Tenant Protection Plan Compliance | — | special |
| 06/15/2026 | Post-installed Anchors | Paul Collins | special |
| 06/15/2026 | Heating Systems | Paul Collins | special |
| 06/15/2026 | Fire-Resistant Penetrations and Joints | Paul Collins | special |
| 06/15/2026 | HVAC-R and service water heating equipment | Paul Collins | energy_progress |
| 06/15/2026 | Maintenance information | Paul Collins | energy_progress |
| 06/15/2026 | HVAC-R and service water piping design and insulation | Paul Collins | energy_progress |
| 06/15/2026 | Energy Code Compliance Inspections | Paul Collins | progress |
| 06/15/2026 | Fire-Resistance Rated Construction | — | progress |
| 06/15/2026 | Post-installed Anchors | — | special |
| 06/15/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/15/2026 | HVAC-R and service water heating system controls | Paul Collins | energy_progress |
| 06/15/2026 | Fire-Resistant Penetrations and Joints | Paul Collins | special |
| 06/15/2026 | Lighting controls | — | energy_progress |
| 06/15/2026 | Interior lighting power | — | energy_progress |
| 06/03/2026 | Final | — | progress |
| 06/03/2026 | Final | Paul Collins | progress |
| 06/03/2026 | Mechanical Systems | Paul Collins | special |
| 06/02/2026 | Final | — | progress |
| 04/13/2026 | Fire-Resistance Rated Construction | Blake Goble | progress |
| 04/13/2026 | Interior lighting power | Blake Goble | energy_progress |