Telephone utility
QUEENS BOULEVARD
QUEENS · BIN 4077480
💬 Discuss this project
0Year Built
—Stories
U4Building Class
C4-5XZoning
0 sfGross Floor Area
0Units
3 Open Violations ▸FISP: SAFE
Telephone utility · Owner of record: VERIZON NEW YORK INC · 24,307 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction37p · 3 filings · 16 docs
Floor 7Under Construction37p · 3 filings · 16 docs
Floor 6Under Construction35p · 3 filings · 16 docs
Floor 5Under Construction38p · 4 filings · 20 docs
Floor 4Under Construction37p · 3 filings · 16 docs
Floor 3Under Construction34p · 3 filings · 16 docs
Floor 2Under Construction51p · 6 filings · 20 docs
Floor 1Under Construction40p · 5 filings · 20 docs
CellarUnder Construction38p · 3 filings · 14 docs
BasementUnder Construction1p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERIZON5409/13/2026
H&H RESTORATION CORP703/22/2026
VERIZON WIRELESS303/22/2026
NEW YORK TELEPHONE CO603/22/2026
NEW YORK CITY TEL CO403/22/2026
VERIZON OF NEW YORK, INC103/21/2026
BELL ATLANTIC RM 802203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1003/21/2026
LOUIS STRIAR203/21/2026
SPRING SCAFFOLDING LLC603/21/2026
ANGELA RIVERA303/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
AE DESIGN SOLUTION403/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TISHMAN INTERIORS CORPGeneral Contractor1609/13/2026
SPRING SCAFFOLDING LLCGeneral Contractor808/26/2026
VANTAGETOP LLCGeneral Contractor603/21/2026
ON-TRAC CONSTRUCTION ASSOGeneral Contractor507/08/2026
ASHLAR MECHANICAL CORPFire Protection307/08/2026
VIK XS SERVICES INCGeneral Contractor203/21/2026
CS BRIDGE CORPGeneral Contractor203/21/2026
SIGNSTAR NYCScaffold107/08/2026
NEW YORK PLBG-HTG-COOLINGPlumbing107/08/2026
CROSSCITY CONST CORPElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665105/05/2026
CROSSCHECK INSPECTION SER544709/12/2024
Building Lifecycle
All (209)Filed (20)Permit Issued (34)Signed Off (8)Facade (FISP) (15)Violation (54)Inspection (5)Objection (46)Special Inspection (27)
09/11/2026
Permit issued — Structural
Q01056561-I1-ST
09/10/2026
Permit issued — General Construction
Q01006231-I1-GC
08/11/2026
Permit issued — Sidewalk Shed
Q01403785-I1-SH
08/05/2026
Permit issued — Boiler Equipment
Q01098911-I1-BE
07/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/10/2026
Permit issued — General Construction
Q01357464-I1-GC
06/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01403785-I1
05/20/2026
Permit issued — Sidewalk Shed
Q01403785-I1-SH
05/18/2026
Permit issued — Suspended Scaffold
Q01396767-I1-SC
05/05/2026
Filed — Alteration
Q01357464-I1
05/05/2026
Filed — Alteration
Q01396767-I1
05/04/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
05/04/2026
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
04/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/11/2026
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
02/09/2026
Special inspection requirement — Final
Christopher Krepcio
12/31/2025
Permit issued — Mechanical Systems
Q01056788-I1-MS
12/23/2025
Permit issued — Sprinklers
Q01056775-I1-EW-SP
10/23/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.THE PIPE SCAFFOLD AT THE NORTH ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO THE TOP OF THE 2ND FLOOR WINDOWS.
Q01134580-S1
10/15/2025
Permit issued — Supported Scaffold
Q01134580-S1-SF
09/22/2025
Permit issued — Structural
Q01056561-I1-ST
09/10/2025
Permit issued — General Construction
Q01006231-I1-GC
05/19/2025
Permit issued — Boiler Equipment
Q01098911-I1-BE
04/09/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.THE PIPE SCAFFOLD AT THE NORTH ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO THE TOP OF THE 2ND FLOOR WINDOWS.
Q01134580-I1
03/14/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.THE PIPE SCAFFOLD AT THE NORTH ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO THE TOP OF THE 2ND FLOOR WINDOWS.
Q01134580-P1
12/18/2024
Permit issued — Sprinklers
Q01056775-I1-EW-SP
11/13/2024
Permit issued — Mechanical Systems
Q01056788-I1-MS
10/31/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.THE PIPE SCAFFOLD AT THE NORTH ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO THE TOP OF THE 2ND FLOOR WINDOWS.
Q01134580-S1
10/31/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.THE PIPE SCAFFOLD AT THE NORTH ELEVATION FROM THE TOP OF THE SIDEWALK SHED BRIDGE TO THE TOP OF THE 2ND FLOOR WINDOWS.
Q01134580-I1
10/31/2024
Permit issued — Sidewalk Shed
Q01134580-I1-SH
10/31/2024
Permit issued — Supported Scaffold
Q01134580-S1-SF
10/30/2024
Permit issued — Structural
Q01056561-I1-ST
10/29/2024
Objection resolved — Addressed
10/29/2024
Objection resolved — Addressed
10/22/2024
Permit issued — Sprinklers
Q01056775-I1-EW-SP
10/17/2024
Objection resolved — Addressed
10/10/2024
Objection resolved — Addressed
10/10/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/07/2024
Objection resolved — Addressed
10/04/2024
Permit issued — Boiler Equipment
Q01098911-I1-BE
10/04/2024
Objection resolved — Addressed
09/27/2024
Permit issued — Boiler Equipment
Q01098911-I1-BE
09/16/2024
Permit issued — General Construction
Q01006231-I1-GC
09/13/2024
Objection resolved — Addressed
09/13/2024
Objection resolved — Addressed
Latest 60 of 209 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedTISHMAN INTERIORS CORP09/11/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN INTERIORS CORP09/10/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC08/11/2026
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP08/05/2026
DOB NOWGeneral ConstructionPermit IssuedON-TRAC CONSTRUCTION ASSO06/10/2026
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/20/2026
DOB NOWSuspended ScaffoldPermit IssuedH & H RESTORATION CORP05/18/2026
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP12/31/2025
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP12/23/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC10/15/2025
DOB NOWStructuralPermit IssuedTISHMAN INTERIORS CORP09/22/2025
DOB NOWGeneral ConstructionPermit IssuedTISHMAN INTERIORS CORP09/10/2025
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP05/19/2025
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP12/18/2024
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP11/13/2024
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC10/31/2024
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC10/31/2024
DOB NOWStructuralPermit IssuedTISHMAN INTERIORS CORP10/30/2024
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP10/22/2024
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP10/04/2024
DOB NOWBoiler EquipmentPermit IssuedCHAMPION COMBUSTION CORP09/27/2024
DOB NOWGeneral ConstructionPermit IssuedTISHMAN INTERIORS CORP09/16/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP09/18/2023
DOB NOWSignSigned-offSIGNSTAR NYC08/11/2022
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP08/04/2022
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO06/08/2022
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC03/28/2022
DOB NOWGeneral ConstructionSigned-offON-TRAC CONSTRUCTION ASSO03/14/2022
DOB NOWPlumbingSigned-offNEW YORK PLBG-HTG-COOLING01/21/2021
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP01/15/2021
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP01/08/2021
DOB NOWSidewalk ShedPermit IssuedVIK XS SERVICES INC05/29/2020
DOB NOWSidewalk ShedPermit IssuedVANTAGETOP LLC06/14/2018
DOB NOWSidewalk ShedPermit IssuedVANTAGETOP LLC02/12/2018
BISOTISSUEDTISHMAN INTERIORS CORP01/28/2021
BISOTISSUEDTISHMAN INTERIORS CORP12/10/2020
BISOTISSUEDTISHMAN INTERIORS CORP07/23/2020
BISOTISSUEDTISHMAN INTERIORS CORP05/12/2020
BISOTISSUEDTISHMAN INTERIORS CORP04/15/2020
BISPLISSUEDPAR PLUMBING CO., INC03/31/2020
+ 44 more permits on file
1 project · most recent 08/13/2024
Generators Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/13/2024Permit IssuedTISHMAN INTERIORS CORPGenerators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Modine HER-125 42,700 BTU · Electric Heater ×5
Liebert PFH037A-YLN 36,000 BTU · Crac Unit ×2
DME037E 36,200 BTU · Crac Unit ×1
Ventilation
Greenheck GREENHECK 9,000 CFM ×1
SQ-18-VG 3,600 CFM · Exhaust Fan ×1
1 project · most recent 08/13/2024
FiledStatusContractorScope
08/13/2024Permit IssuedASHLAR MECHANICAL CORP—
9 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026Permit IssuedTOP SHELF ELECTRIC CORP—
01/07/2025Permit IssuedPINTO AND TEGER ELECTRICGeneral Wiring
11/01/2024CompleteCORPORATE ELEC. GROUP INC—
10/02/2024CancelledTOP SHELF ELECTRIC CORP—
07/06/2022CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
03/28/2022CompleteTOP SHELF ELECTRIC CORP—
05/12/2020CompleteTOP SHELF ELECTRIC CORP—
06/01/2018CompletePINTO & TEGER ELEC. CORP.General Wiring
02/05/2018CompletePATRIOT ELECTRIC CORP—
2 projects · most recent 05/20/2026
Sidewalk Shed
FiledStatusContractorScope
05/20/2026Signed-offSPRING SCAFFOLDING LLCSidewalk Shed
02/09/2018Permit IssuedVANTAGETOP LLCSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/04/2026Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
05/04/2026Post-installed AnchorsKarol Zdancewiczspecial
03/11/2026Air barrier - visual inspectionChristopher Krepcioenergy_progress
02/09/2026FinalChristopher Krepcioprogress
08/12/2024Maintenance informationEUGENE BIFULCOenergy_progress
08/12/2024Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
08/12/2024Shutoff dampersEUGENE BIFULCOenergy_progress
08/05/2024Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
08/02/2024Structural Steel - DetailsEUGENE BIFULCOspecial
07/23/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/23/2024Emergency and Standby Power Systems (Generator)EUGENE BIFULCOspecial
07/22/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
07/22/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/22/2024Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
05/24/2024FinalEUGENE BIFULCOprogress
05/24/2024Post-installed AnchorsEUGENE BIFULCOspecial
05/24/2024Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
05/24/2024Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
05/24/2024Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
05/24/2024Structural Steel - WeldingEUGENE BIFULCOspecial
05/24/2024PreliminaryEUGENE BIFULCOprogress
05/24/2024FinalEUGENE BIFULCOprogress
05/24/2024Mechanical SystemsEUGENE BIFULCOspecial
02/15/2024FinalEUGENE BIFULCOprogress
08/08/2022FinalMOHAMMAD AHEADprogress
Latest 25 of 27.
▾Documents — 449 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch17
08/29/2026Q00017748-I1Request digital key ↗
08/26/2026Q00687346-I1Request digital key ↗
08/26/2026Q00706659-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00349005-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/27/2026Q00447183-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00417374-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00417376-I1Request digital key ↗
▸Applications & Permits90
▸BISPLAN / WORK APPROVAL APPLICATION48
12/22/2020440654356Open ↗
12/04/2020440653375Open ↗
09/09/2020421437519Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION42
02/18/2021440654356Open ↗
01/20/2021440654356Open ↗
12/10/2020440653375Open ↗
Showing 3 of 42 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING RESOLUTION DETERMINATION1
03/09/2018421437519Open ↗
▸Seals & Professional Certifications82
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
05/11/2020440591361Open ↗
01/23/2019421567664Open ↗
12/17/2018421437519Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/28/2026Q00349005-I1Open ↗
08/27/2026Q00417376-I1Open ↗
08/26/2026Q00706659-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/27/2026Q01056561-I1Open ↗
08/26/2026Q01006231-I1Open ↗
08/26/2026Q00783058-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
12/22/2020440654356Open ↗
12/04/2020440653375Open ↗
06/11/2020440598319Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
12/22/2020440654356Open ↗
12/04/2020440653375Open ↗
06/11/2020440598319Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
12/22/2020440654356Open ↗
12/04/2020440653375Open ↗
06/11/2020440598319Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026Q01056561-I1Open ↗
08/26/2026Q01006231-I1Open ↗
08/25/2026Q01056788-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/22/2018421567664Open ↗
▸Trade Schedules & Equipment35
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
09/19/2019421437519Open ↗
08/29/2019421437519Open ↗
08/29/2019421437519Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING4
09/09/2020421437519Open ↗
Showing 1 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
07/19/2020421431132Open ↗
04/04/2019421431123Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/22/2018421567664Open ↗
▸Environmental & Asbestos34
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
12/10/2020440653375Open ↗
08/19/2020421431132Open ↗
06/11/2020440598319Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/21/2026Q01056775-I1Open ↗
08/21/2026Q01098911-I1Open ↗
08/17/2026Q01357464-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00417376-I1Open ↗
08/26/2026Q00685763-I1Open ↗
08/13/2026Q00417374-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS INSPECTION REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
05/06/2020440591361Open ↗
03/30/2020440590184Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
03/30/2020440590184Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
09/14/2021440653375Open ↗
12/22/2020440654356Open ↗
12/10/2020440653375Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
09/14/2021440653375Open ↗
11/17/2020440590184Open ↗
08/20/2020440598319Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
12/22/2020440654356Open ↗
12/04/2020440653375Open ↗
06/11/2020440598319Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
01/23/2019421567664Open ↗
01/22/2018421567664Open ↗
08/08/2017421437519Open ↗
Showing 3 of 4 on file for this type
▸BISNYCECC ANALYSIS2
05/06/2020440591361Open ↗
03/30/2020440590184Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00685763-I1Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY15
09/14/2021440653375Open ↗
01/20/2021440654356Open ↗
01/19/2021440654356Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
01/22/2021440654356Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/20/2021440654356Open ↗
▸Approvals, Objections & Sign-offs40
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST17
09/14/2021440653375Open ↗
11/17/2020440590184Open ↗
11/05/2020421437519Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
01/23/2019421567664Open ↗
Showing 1 of 7 on file for this type
▸BISFINAL1
03/30/2020440590184Open ↗
▸BISSUPERSEDING LETTER1
09/19/2019421437519Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q00706659-I1Open ↗
▸Cost, Insurance & Ownership43
▸BISCOST AFFIDAVIT43
09/14/2021440653375Open ↗
12/22/2020440654356Open ↗
12/04/2020440653375Open ↗
Showing 3 of 43 on file for this type
▸Filing & Intake Forms51
▸BISEFILING COVER SHEET26
01/22/2018421567664Open ↗
07/24/2017421437519Open ↗
02/25/2017421437519Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION13
09/14/2020421437519Open ↗
07/15/2020421437519Open ↗
09/19/2019421437519Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM7
02/18/2021440654356Open ↗
05/11/2020440591361Open ↗
04/04/2019421431123Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
12/22/2020440654356Open ↗
12/04/2020440653375Open ↗
06/11/2020440598319Open ↗
Showing 3 of 5 on file for this type
▸Other Documents5
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
04/04/2019421431114Open ↗
Showing 1 of 2 on file for this type
▸BISSP/SD DEVICE CERT : LTR-LIC ELECT1
08/19/2020421437519Open ↗
▸DOB NOWCalculations1
08/17/2026Q01396767-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/17/2026Q01396767-I1Open ↗